This amendment modifies a solicitation for construction services related to a streambank restoration project in Sheridan, Wyoming. The scope of work includes removing non-native vegetation, excavating and stockpiling topsoil, constructing in-stream features, seeding and installing plantings, installing drop structures and drainage structures. The amendment revises specifications sections, drawings, the bid schedule, and incorporates updated FAR clauses. Bids are due by the time and date specified in the original solicitation or as amended. The selected contractor will provide all labor, materials, equipment and supervision to complete the work in accordance with engineering and construction standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Am0002 in SF30 Block 14 Continuation Page for description of amendment changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F21B0016
X 9B. DATED (SEE ITEM 11)
29-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F21B0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AM0002
SUBJECT: Amendment No. 0002 to Specifications and Drawings for Construction of Big Goose, Little Goose & Goose Creek, Section 1135 Sheridan, Wyoming.
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 31 11 05 Page 3, paragraph 2.1, see Grout Mix Table, for “Air entrained” delete “5 to 7%” and substitute “4.5 to 7.5%”
(2) Section 31 11 05 Page 4, delete paragraph 3.1, and substitute the following:
“3.1 GENERAL
The grout shall be used in the work within 90-minutes after materials are batched. Retempering grout will not be permitted. If longer periods are needed, COR approval will be required and approved stabilizers utilized.”
(3) Section 35 31 19 Pages 5, delete paragraph 3.2.1.3, and substitute the following:
“3.2.1.3 Big Goose Drop Structure Gradation
The stone shall be reasonably well graded between the following limits:
NOTE: Values are obtained from Table 12-2 of FHWA-NHI-09-112, CLASS IV.
Limits of Stone Weight Percent Lighter Weight Size in Approx.
by Weight in Pounds (lbs) Spherical Diameter (in) % Maximum Minimum Maximum Minimum
100 1100 30 85 510 310 24 18 50 210 120 18 15 15 93 32 13 9 “
(4) Section 35 31 20 Page 5, paragraph 2.4, line 11 down from top of page, delete “Mill Park” and substitute “Thorne-Rider Park”.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added
Section 01 22 00 Section 01 22 00
Measurement & Payment Measurement and Payment
c. Drawings (Reissued). The following drawings are revised with latest revision date of 30 August 2021 and reissued with this amendment.
(1) Sheet G-004, VF103, VF104, CD103, CD104, CS103, CS104, CG103, CG104, CG204, CG504.
d. Bid Schedule. See Section 00 10 00 for revised bid schedule. All offerors must use the bid schedule from Amendment 0002, unless changed by a subsequent amendment.
e. FAR 52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST). See Section 00 21 00; clause updated with date of Jul 2021.
f. FAR 52.222-8 Payrolls and Basic Records. See Section 00 72 00; clause updated with date of Jul 2021.
g. FAR 52.244-6 Subcontracts for Commercial Items. See Section 00 72 00; clause updated with date of Jul 2021.
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
3. Attachments.
a. Section 01 22 00 Am0002 listed in 1b above.
b. Am0002 Drawings listed in 1c above.
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications - July 2021 398 Attachment 2 Drawings 1 of 2 - July
Attachment 3 Drawings 2 of 2 - July to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications - July 2021 398 Attachment 2 Drawings 1 of 2 - July
Attachment 3 Drawings 2 of 2 - July
Attachment 4 Am0002 Drawings 11 30-AUG-2021
Attachment 5 Am0002 01 22 00 23
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The following have been modified:
BID SCHEDULE
BID SCHEDULE
BASE BID ITEMS (0001-0014)
Estimated Unit Item No Description Quantity Unit Price Amount
THORNE-RIDER PARK (AREA 105-111)
0001 Demolition 1 Job $_________ $___________
0002 Topsoil Stripping 1,200 CY $_________ $___________
0003 Excavation 19,970 CY $_________ $___________
0004 Fill 13,360 CY $_________ $___________
0005 Topsoil Placement 1,540 CY $_________ $___________
0006 Seeding & Mulching 4,400 SY $_________ $___________
0007 Plantings 43,575 SF $_________ $___________
0008 Drainage Structure No. 2 30” x 154’ Class 3 RCP 1 Job $_________ $___________
IN-STREAM STRUCTURES
0009 Construct Riffles in Goose
Creek Channel 1,020 Ton $_________ $___________
0010 Construct Vane/J-Hook Rock
Structures in Goose Creek Channel 600 Ton $_________ $___________
0011 Construct Boulder Clusters in
Goose Creek Channel 160 Ton $_________ $___________
0012 Construct Revetments in Goose
Creek Channel 2,700 Ton $_________ $___________
0013 Construct Boulder Clusters in
Big Goose Creek Channel 50 Ton $_________ $___________
ALL REMAINING WORK
0014 Base Contract All Remaining
Work (Excluding Items 0001 – 0013) 1 Job $_________ $___________
TOTAL BASE AMOUNT (Items 0001 through 0014) $_______________________
OPTION 1 ITEMS
SHELTERED ACRES PARK (AREA 101 & 112)
0015 Demolition 1 Job $_________ $___________
0016 Topsoil Stripping 400 CY $_________ $___________
0017 Excavation 500 CY $_________ $___________
0018 Topsoil Placement 400 CY $_________ $___________
0019 Seeding & Mulching 3,600 SY $_________ $___________
0020 Plantings 39,650 SF $_________ $___________
0021 Drainage Structure No. 1 12” x 52.2’ Class 3 RCP 1 Job $_________ $___________
WASHINGTON PARK (AREA 102)
0022 Demolition 1 Job $_________ $___________
0023 Topsoil Stripping 490 CY $_________ $___________
0024 Excavation 7,910 CY $_________ $___________
0025 Fill 30 CY $_________ $___________
0026 Topsoil Placement 490 CY $_________ $___________
0027 Seeding & Mulching 4,400 SY $_________ $___________
0028 Plantings 43,575 SF $_________ $___________
0029 Construct 10’ Wide
Concrete Trail 570 LF $_________ $___________
IN-STREAM STRUCTURES
0030 Construct Riffles in Little
Goose Creek Channel 1,040 Ton $_________ $___________
0031 Construct Vane/J-Hook Rock
Structures in Little Goose Creek Channel 1,005 Ton $_________ $___________
0032 Construct Boulder Clusters in
Little Goose Creek Channel 185 Ton $_________ $___________
ALL REMAINING WORK (OPTION 1)
0033 Option 1 Contract All Remaining Work
(Excluding Items 0015 – 0032) 1 Job $_________ $___________
TOTAL AMOUNT – OPTION 1 (Items 0015 - 0033) $_________________
OPTION 2 ITEMS
MILL PARK (AREA 103-104)
0034 Demolition 1 Job $_________ $___________
0035 Riprap 5,150 Ton $_________ $___________
0036 Bedding 1,500 Ton $_________ $___________
0037 Grout 500 CY $_________ $___________
0038 Excavation 7,100 CY $_________ $___________
0039 Sheetpile 4,488 LF $_________ $___________
0040 Weep Drains 306 EA $_________ $___________
ALL REMAINING WORK (OPTION 2)
0041 Option 2 Contract All Remaining Work
(Excluding Items 0034 – 0040) 1 Job $_________ $___________
TOTAL AMOUNT – OPTION 2 (Items 0034 - 0041) $_________________
TOTAL AMOUNT BASE PLUS OPTIONS (Items 0001 - 0041) $__________________
Notes.
1. Bid prices must be entered for all items of the schedule. See SECTION 00 21 00, INSTRUCTIONS, paragraph 1.1.11 REJECTION OF BIDS FOR information on rejection of bids. See SECTION 00 21 00, INSTRUCTIONS, paragraph 1.1.4 Arithmetic Discrepancies for information on clerical mistakes.
2. See SECTION 00 21 00, INSTRUCTIONS, paragraph 1.1.3 INFORMATION FOR MODIFYING BIDS for information if bid modifications are needed.
3. See SECTION 00 21 00, INSTRUCTIONS, FAR 52.217-5 for information on evaluation of options.
4. The quantities for unit priced items are estimated only and the respective unit price will prevail in case of an overrun or underrun subject to FAR 52.211-18 "Variation in Estimated Quantity."
5. See SECTION 01 22 00 MEASUREMENT AND PAYMENT for additional information.
6. See SECTION 00 72 00, GENERAL CONDITIONS, FAR 52.217-7 Option for Increased Quantity— Separately Priced Line Items for additional information on how the Government will award option items.
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by reference:
52.211-2 Availability of Specifications, Standards, and Data Item
Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
JUL 2021
The following have been deleted:
52.211-2 Availability of Specifications, Standards, and Data Item
Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
APR 2014
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by reference:
52.222-8 Payrolls and Basic Records JUL 2021 52.244-6 Subcontracts for Commercial Items JUL 2021
The following have been deleted:
52.222-8 Payrolls and Basic Records AUG 2018 52.244-6 Subcontracts for Commercial Items NOV 2020
(End of Summary of Changes)
File details come from the government source that posted it. Updated .