Bass Lake Recreation Sites Storm Damage Project

Closed Solicitation Posted

Solicitation number
12970223Q0091
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238990 All Other Specialty Trade Contractors
PSC
Z2PZ Repair Or Alteration Of Other Non-Building Facilities
Place of performance
North Fork, California 93643, United States

Notice details come from SAM.gov. Updated .

Notice text

Submit RFI's via email to derek.lavey@usda.gov by
1700 MDT 9/4/2023
The Sierra National Forest- Bass Lake Ranger
District has the following construction
requirements:
Repair the parking lot at the Willow Creek
Trailhead clearing and demolition of the broken
asphalt section and removal of stumps, downed
trees, and debris, placement and compaction of
fill material, grading and pavement of the new
asphalt section, installing car stops, and
installing riprap at inlet/outlet of an existing
culvert;
Repair the parking lot at the Recreation Point
Group Picnic Site clearing and demolition of
the broken asphalt section and removal of stumps,
downed trees, and debris, grading and pavement of
the new asphalt section, and installing car stop;
Restore drainage function at the Forks Campground cleaning out two existing culverts and
installing riprap at inlet/outlet;
Repair the road section and restore drainage flow
at the Spring Cove Campground clearing and
demolition of the broken asphalt section and
removal of stumps, downed trees, and debris,
placement and compaction of fill material,
grading and pavement of the new asphalt section,
and cleaning out an existing culvert and
installing riprap at inlet/outlet; Repair the road and trail sections and restore
drainage flow at Dry Gulch Campground clearing
and demolition of the broken asphalt sections of
the parking lot and trail and removal of stumps,
downed trees, and debris, placement and compaction of fill material, grading and pavement
of the new asphalt sections at parking lot and
trails, installing bulletin board, and cleaning
out an existing culvert and installing riprap at
inlet/outlet; and implement all other aspects
shown on the project plans.

Files

File Type Posted
Bass Lake Recreation Sites Storm Damage Project RFI Log.xlsx XLSX spreadsheet
Amendment 1 SF30.pdf PDF
4. Drawings.pdf PDF
7. Fire Plan.doc DOC document
3. Specifications.pdf PDF
6. Spec_839_RestoreDrainageFunctions.pdf PDF
1. Schedule of Items.xls XLS spreadsheet
12970223Q0091.pdf PDF
5. Spec_814_AsphaltPavementPatching.pdf PDF
2. Statment of Work.rtf RTF text file
8. CA20230018 08-11-2023.txt TXT text file
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors