1. Schedule of Items.xls
XLS spreadsheet 28 KB Posted
- Attached to
- Bass Lake Recreation Sites Storm Damage Project
- Solicitation number
- 12970223Q0091
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items for the Bass Lake Recreation Sites Storm Damage Project solicitation from the Department of Agriculture Forest Service. The solicitation seeks bids for repairs to recreation sites damaged by storms at the Bass Lake Ranger District of the Sierra National Forest in Madera County, California. Services and items required include clearing and demolition, asphalt pavement patching, drainage restoration, installation of culvert protection with riprap, plastic car stops, and an optional item for installation of an asphalt trail and bulletin board at the Dry Gulch Campground. Quantities, units, unit prices and total estimated costs are provided for each item. The schedule of items is attached to solicitation number 12970223Q0091 for the Bass Lake Recreation Sites Storm Damage Project, with responses due to the Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 SF30.pdf | ||
| Bass Lake Recreation Sites Storm Damage Project RFI Log.xlsx | XLSX spreadsheet | |
| 7. Fire Plan.doc | DOC document | |
| 6. Spec_839_RestoreDrainageFunctions.pdf | ||
| 4. Drawings.pdf | ||
| 8. CA20230018 08-11-2023.txt | TXT text file | |
| 3. Specifications.pdf | ||
| 5. Spec_814_AsphaltPavementPatching.pdf | ||
| 2. Statment of Work.rtf | RTF text file | |
| 12970223Q0091.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ScheduleOfItems
| SCHEDULE OF ITEMS | |||||
| BASS LAKE RECREATION SITES STORM DAMAGE PROJECT | |||||
| BASS LAKE RANGER DISTRICT | |||||
| SIERRA NATIONAL FOREST | |||||
| MADERA COUNTY | |||||
| CSI Specifications | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Total Cost |
| 1505 | MOBILIZATION | LS | 1 | ||
| 2100 | CLEARING AND DEMOLITION (includes clearing and demolition of the broken asphalt sections and removal of stumps, downed trees, and debris) | LS | 1 | ||
| 2722 | INSTALL INLET/OUTLET CULVERT PROTECTION - CLASS 2 RIPRAP | EA | 3 | ||
| 2882 | INSTALL RECYCLED PLASTIC CAR STOPS | EA | 3 | ||
| SUBTOTAL | $0.00 | ||||
| Road Maintenance Specifications | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Total Cost |
| 814-1 | INSTALL AC PAVEMENT PATCHING (1/2 HOT MIXED ASPHALT CALTRANS TYPE A PG 64-10) - includes placement and compaction of fill material, grading, aggregate base, and tac-coat | TONS | 8 | ||
| 839-2 | RESTORE DRAINAGE FUNCTION (includes cleaning out existing culverts) | EA | 4 | ||
| SUBTOTAL | $0.00 | ||||
| CSI Specifications - OPTIONAL ITEMS - DRY GULCH CAMPGROUND | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Total Cost |
| 1505 | MOBILIZATION | LS | 1 | ||
| 2100 | CLEARING AND DEMOLITION (includes clearing and demolition of the broken asphalt sections and removal of stumps, downed trees, and debris) | LS | 1 | ||
| 2513 | INSTALL AC PAVEMENT TRAIL (1/2 HOT MIXED ASPHALT CALTRANS TYPE A PG 64-10) - includes placement and compaction of fill material, grading, aggregate base and tac-coat | TONS | 22 | ||
| 2722 | INSTALL INLET/OUTLET CULVERT PROTECTION - CLASS 2 RIPRAP | EA | 1 | ||
| 2883 | INSTALL BULLETIN BOARD - 3 PANEL | EA | 1 | ||
| SUBTOTAL | $0.00 | ||||
| TOTAL | $0.00 |
File details come from the government source that posted it. Updated .