Bass Lake Recreation Sites Storm Damage Project RFI Log.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Bass Lake Recreation Sites Storm Damage Project
- Solicitation number
- 12970223Q0091
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a spreadsheet log of questions and responses related to the Bass Lake Recreation Sites Storm Damage Project solicitation. The solicitation number is 12970223Q0091 and is issued by the Department of Agriculture Forest Service. The log addresses five questions from contractors regarding the scope of work. It clarifies that an onsite creek will be diverted back to its original flow using existing materials. Contractors are to clear debris 100 feet into the campsite area near the water tank. Only damaged asphalt sections will be repaired, not entirely replaced, and asphalt trails will just be repaired, not fully replaced. A car and other debris on site will be removed by the Forest Service before work commences, not by the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 SF30.pdf | ||
| 7. Fire Plan.doc | DOC document | |
| 6. Spec_839_RestoreDrainageFunctions.pdf | ||
| 1. Schedule of Items.xls | XLS spreadsheet | |
| 4. Drawings.pdf | ||
| 8. CA20230018 08-11-2023.txt | TXT text file | |
| 3. Specifications.pdf | ||
| 5. Spec_814_AsphaltPavementPatching.pdf | ||
| 2. Statment of Work.rtf | RTF text file | |
| 12970223Q0091.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bass Lake Recreation Sites Storm Damage Project RFI Log | |||
| Updated | 9/7/23 10:29 | ||
| RFI Number | RFI Question | Government RFI Response | Notes |
| 1 | Is the creek behind the water tank being diverted back in to its original flow? If so do you want us to use existing material? | Yes to both questions. | |
| 2 | How far up into the “host” camp towards the water tank needs to be cleared? | 100 ft from edge of parking spur towards water tank. | |
| 3 | After all debris is removed from the parking area, is all the asphalt being replaced? (can’t see if asphalt is still good or not) | No - only sections that were damaged are being repaired. | |
| 4 | Are all asphalt trails being replaced or just repaired? | Just repaired. | |
| 5 | Is there another plan to remove and dispose of the car and other items or is that on the contractor? | Not on contractor - outside scope of work. FS will remove car prior to contractor commencing work. |