Bass Lake Recreation Sites Storm Damage Project RFI Log.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Bass Lake Recreation Sites Storm Damage Project
Solicitation number
12970223Q0091
Issued by

About this file

This document contains a spreadsheet log of questions and responses related to the Bass Lake Recreation Sites Storm Damage Project solicitation. The solicitation number is 12970223Q0091 and is issued by the Department of Agriculture Forest Service. The log addresses five questions from contractors regarding the scope of work. It clarifies that an onsite creek will be diverted back to its original flow using existing materials. Contractors are to clear debris 100 feet into the campsite area near the water tank. Only damaged asphalt sections will be repaired, not entirely replaced, and asphalt trails will just be repaired, not fully replaced. A car and other debris on site will be removed by the Forest Service before work commences, not by the contractor.

View the file

Other files

File Type Posted
Amendment 1 SF30.pdf PDF
7. Fire Plan.doc DOC document
6. Spec_839_RestoreDrainageFunctions.pdf PDF
1. Schedule of Items.xls XLS spreadsheet
4. Drawings.pdf PDF
8. CA20230018 08-11-2023.txt TXT text file
3. Specifications.pdf PDF
5. Spec_814_AsphaltPavementPatching.pdf PDF
2. Statment of Work.rtf RTF text file
12970223Q0091.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bass Lake Recreation Sites Storm Damage Project RFI Log
Updated9/7/23 10:29
RFI NumberRFI QuestionGovernment RFI ResponseNotes
1Is the creek behind the water tank being diverted back in to its original flow? If so do you want us to use existing material?Yes to both questions.
2How far up into the “host” camp towards the water tank needs to be cleared?100 ft from edge of parking spur towards water tank.
3After all debris is removed from the parking area, is all the asphalt being replaced? (can’t see if asphalt is still good or not)No - only sections that were damaged are being repaired.
4Are all asphalt trails being replaced or just repaired?Just repaired.
5Is there another plan to remove and dispose of the car and other items or is that on the contractor?Not on contractor - outside scope of work. FS will remove car prior to contractor commencing work.