B481 UPS Battery Replacement
Closed Solicitation Posted
- Solicitation number
- FA4460-24-Q-0234
- Agency
- Air Mobility Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 561621 Security Systems Services (except Locksmiths)
- PSC
- N042 Installation Of Equipment- Fire Fighting/Rescue/Safety Equipment; Environ Protect Equipment/Matls
- Place of performance
- Little Rock AFB, Arkansas 72099, United States
- Points of contact
-
- Darius Alexander darius.alexander@us.af.mil (501) 987-1028
- Shawn Dostie shawn.dostie@us.af.mil (501) 987-3443
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Mobility Command is seeking to replace the batteries in the uninterruptible power supply (UPS) serving the Emergency Communications Center (ECC) located in Building 481 at Little Rock Air Force Base. The solicitation requires removing 40 existing Eaton 12200 batteries and installing 40 new Enersys HX205 batteries, as well as performing preventative maintenance on the UPS. The new batteries must fit within the existing unit and be capable of powering the ECC systems in the event of a power failure. Respondents must be able to decommission, remove, and dispose of the existing batteries and replaced system items, and ensure the UPS is fully operational upon completion. A site visit is scheduled for June 13, 2024, and proposals are due by June 20, 2024.
This is a 100% small business set-aside contract. No incumbent contractor is identified. The contract value and budget details are not provided. The place of performance is at Little Rock AFB, AR 72099, USA. The contract will be awarded for performance from March 1, 2024, on a Monday-Friday, 0730-1630 schedule, with no work required on federal holidays.
Notice text
Fire & Emergency Services need to replace the batteries in the uninterruptible power supply (UPS) serving the Emergency Communications Center (ECC) located in Building 481 at Little Rock AFB. This will also require a preventative maintenance (PM) service of the UPS.
Critical tasks to be completed are:
• Remove (40) Eaton 12200 and install (40) NEW Enersys HX205 batteries into existing Eaton Battery Cabinet.
• New UPS Batteries must fit within existing unit and available space (Site Visit Encouraged)
• Must decommission, remove, and dispose the existing batteries/replaced system items.
• Must be capable of power supply required to electronic ECC systems in the event of power failure to BLDG 481.
• UPS must be fully operational at completion of project.
A site visit will be conducted: Those wishing to participate in the site visit shall provide all information.
*Name
*DL State/number
*Date of Birth
Attachments
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Attachment 1_Provisions and Clauses.pdf | ||
| Attachment 2_PWS.pdf | ||
| Combo.pdf |