Construction- B103, 104 and 111 Lightning Protection Installation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N6660423Q0207
Agency
Naval Sea Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238290 Other Building Equipment Contractors
PSC
Z1AZ Maintenance Of Other Administrative Facilities And Service Buildings
Place of performance
Newport, Rhode Island 02841, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The federal contract opportunity involves the provision of a Lightning Protection Electrical Design Engineer to determine various aspects of the lightning protection systems for buildings 103/104 and 111. The contractor will be responsible for determining the need for direct strike protection, bonding requirements, the number of systems entering the buildings, and the need for roof penetrations, among other things. The contractor will also need to coordinate with the roofing manufacturer to ensure the warranty is not violated by the installation methods for air terminals and roof conductors.

Products and Services to be provided:

  1. Lightning Protection Electrical Design Engineering services.
  2. Determination of direct strike protection needs.
  3. Determination of bonding requirements.
  4. Assessment of the number of systems entering the buildings.
  5. Coordination with the roofing manufacturer.

Notice text

9 versions

Update #9 · Latest ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

See attached N6660423Q0207 Amendment 0003. The Purpose of this amendment is to: 1. Change proposal due date from 28 April 2023 to 16 May 2023 at 2:00 PM EST. 2. A second Site Visit is hereby scheduled for 09 May 2023 at 1400 EST.

Please See attached for RFI 0002 Q&A. 

See attached N6660423Q0207 Amendment 0004. The Purpose of this amendment is to: 1. Change proposal due date from  16 May 2023 to 26 May 2023 at 2:00 PM EST. 2.

This solicitation is on hold until further notice.

Amendment 0005: See amendment 0005 attached for RFI Q&A as well as other revisions. 

Amentment 0006: See amendment 0006 attached. 

Update #8 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

See attached N6660423Q0207 Amendment 0003. The Purpose of this amendment is to: 1. Change proposal due date from 28 April 2023 to 16 May 2023 at 2:00 PM EST. 2. A second Site Visit is hereby scheduled for 09 May 2023 at 1400 EST.

Please See attached for RFI 0002 Q&A. 

See attached N6660423Q0207 Amendment 0004. The Purpose of this amendment is to: 1. Change proposal due date from  16 May 2023 to 26 May 2023 at 2:00 PM EST. 2.

This solicitation is on hold until further notice.

Amendment 0005: See amendment 0005 attached for RFI Q&A as well as other revisions. 

Update #7 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

See attached N6660423Q0207 Amendment 0003. The Purpose of this amendment is to: 1. Change proposal due date from 28 April 2023 to 16 May 2023 at 2:00 PM EST. 2. A second Site Visit is hereby scheduled for 09 May 2023 at 1400 EST.

Please See attached for RFI 0002 Q&A. 

See attached N6660423Q0207 Amendment 0004. The Purpose of this amendment is to: 1. Change proposal due date from  16 May 2023 to 26 May 2023 at 2:00 PM EST. 2.

This solicitation is on hold until further notice.

Update #6 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

See attached N6660423Q0207 Amendment 0003. The Purpose of this amendment is to: 1. Change proposal due date from 28 April 2023 to 16 May 2023 at 2:00 PM EST. 2. A second Site Visit is hereby scheduled for 09 May 2023 at 1400 EST.

Please See attached for RFI 0002 Q&A. 

See attached N6660423Q0207 Amendment 0004. The Purpose of this amendment is to: 1. Change proposal due date from  16 May 2023 to 26 May 2023 at 2:00 PM EST. 2.

Update #5 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

See attached N6660423Q0207 Amendment 0003. The Purpose of this amendment is to: 1. Change proposal due date from 28 April 2023 to 16 May 2023 at 2:00 PM EST. 2. A second Site Visit is hereby scheduled for 09 May 2023 at 1400 EST.

Please See attached for RFI 0002 Q&A. 

Update #4 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

See attached N6660423Q0207 Amendment 0003. The Purpose of this amendment is to: 1. Change proposal due date from 28 April 2023 to 16 May 2023 at 2:00 PM EST. 2. A second Site Visit is hereby scheduled for 09 May 2023 at 1400 EST.

Update #3 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

See attached N6660423Q0207 Amendment 0002. The Purpose of this amendment is to:1. Change proposal due date from 21 April 2023 to 28 April 2023 at 2:00 PM EST. 2. Remove Attachment 1 and replace with revised Drawings. 3. Remove Attachment 2 and replace with revised Specification. 4. Provide answers to RFI 0001.

Update #2 ·

See attached N6660423Q0207 Amendment 0001. The Purpose of this amendment is to: (1) Change proposal due date from 3 April 2023 to 21 April 2023 at 2:00 PM EST, (2) Add provision 52.211-14 to Section L, (3) Add Clause 52.211-15 to Section I, (4) Remove Attachment 3 RI Wage Determination dated 02/13/2023 and replace with RI Wage Determination dated 03/17/2023.  All other terms and conditions remain unchanged.

________________________________________________________________________________________________________

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

Update #1 ·

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for Buildings 103, 104 and 111 Lightning Protection Installation. Please see attached Solicitation (N6660423Q0207) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active CAGE Code. If you are unable to request the attachments in sam.gov, please send e-mail to jay.a.parke2.civr@navy.mil  and michael.n.ouellette.civ@us.navy.mil  and include company name, complete address and CAGE code.

Attachments

Files attached to this notice, newest first
File Type Posted
N6660423Q0207 Amendment 0006.pdf PDF
RI WD 06_30_2023.pdf PDF
N6660423Q0207 Amendment 0005.pdf PDF
N6660423Q0207 Amendment 0004.pdf PDF
N6660423Q0207 Lightning Protection RFIs 0002.pdf PDF
N6660423Q0207 Amendment 0003.pdf PDF
N6660423Q0207 Amendment 0002.pdf PDF
N6660423Q0207 Lightning Protection RFIs 0001.pdf PDF
II. H. N6660423Q0207 Amendment 0001.pdf PDF
II. H. RI Wage Determination 03_17_2023.pdf PDF
II. H. N6660423Q0207.pdf PDF
Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Construction- B103, 104 and 111 Lightning Protection Installation Award Award Notice
Construction- B103, 104 and 111 Lightning Protection Installation This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity