N6660423Q0207 Lightning Protection RFIs 0001.pdf
PDF 833 KB Posted
- Attached to
- Construction- B103, 104 and 111 Lightning Protection Installation Federal contract opportunity
- Solicitation number
- N6660423Q0207
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660423Q0207 Amendment 0006.pdf | ||
| RI WD 06_30_2023.pdf | ||
| N6660423Q0207 Amendment 0005.pdf | ||
| N6660423Q0207 Amendment 0004.pdf | ||
| N6660423Q0207 Lightning Protection RFIs 0002.pdf | ||
| N6660423Q0207 Amendment 0003.pdf | ||
| N6660423Q0207 Amendment 0002.pdf | ||
| II. H. N6660423Q0207 Amendment 0001.pdf | ||
| II. H. RI Wage Determination 03_17_2023.pdf | ||
| II. H. N6660423Q0207.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REF: Drawings E-1 and E-2
a) The buildings noted here (BLDG 103/104) are considered 1 structure in accordance with NFPA
780. Can we combine the systems and submit for 1 certification?
Answer: Contracted Lightning Protection Electrical Design Engineer to determine.
b) Radon vents require DSP (direct strike protection) and are not shown in drawings, should these
MLTP items be considered for protection?
c) Temporary railings are in place atop BLDG 103. Will these be considered permanent structures and be required for bonding and direct strike protection?
Answer: Railings are permanent structures. Contracted Lightning Protection Electrical Design
Engineer to determine whether or not the railings need to be bonded.
d) How many electrical, generator, solar, water, sprinkler, gas, and central plant pipe systems enter the buildings?
Answer: Contractor to determine in field.
e) The high roof is not represented accurately on the plans, will accurate info be forth coming or shall pricing be based on these structures total SQFT?
f) Should pricing include direct fastening to the roof surfaces or are there existing roof warranty tasks to be considered?
Answer: Contractor is to not make roof penetrations.
g) Will the government provide any existing POC information for the roofing manufacturer or any other applicable areas within this regarded question?
Ref SPEC Item 3.1.1- Coordinate with the roofing manufacturer and provide certification that the roof manufacturer's warranty is not violated by the installation methods for air terminals and roof conductors.
Answer: Roof Warranty information will be issued per request from contractor.
REF: Drawings E-3
a) Site visit field measurements have shown up to 20% added increase in total area SQFT, the difference between plan measurements and on-site measurements. Can accurate info be provided, or shall we price accordingly for actual project footprint?
b) Drawing does not show railings, stair and tower platforms, dish antennas, skywalk bridge, generator exhaust, camera and required bonds. Is dish antenna sacrificial requiring only bonding like pole antennae or is direct strike protection required for ALL items listed within this question not shown on drawings?
c) Will terminals interfere with reception?
Answer: Contracted submitted Terminals should not interfere with reception.
d) Plans and detail #2 does not show loop conductor. Loop is not required to receive certification.
Notes indicate loop. Is loop required? NFPA 780 states structures less than 60 feet in height do
NOT require 360 ground loops. Note: if excavation and full 360 ground loop is requested on all
BLDG’s (103, 104, and 111) this will vastly increase project cost due to soil management plan, proper disposal of contaminated soil, etc.)
e) Detail of terminal shows standing seam roof. Where does this occur?
Answer: Standing seam roof does not occur. However, the standing seam roof detail is the only method of lightning protection that does not require penetrations to existing roof.
f) General note 5 requires bonding connections to be welded. 9/10 bonds are too thin bodies of inductance like camera, site lights, flashing and will not survive exothermic welding. Will bonding with UL96 listed fittings suffice except at steel framing of 3/16” or thicker?
Answer: Contractor to determine “if necessary.”
g) Additional construction notes #2- Bracing code requirement occurs over 24” in height. Will no bracing to center roof terminals be acceptable?
Answer: Contractor to determine in field if bracing will be required.
h) All grounded systems and all buried metallic pipes entering the foundation require bonding.
Please indicate where these bonds occur.
i) Will grade electro-mechanical units be included in the certification? Will the Marley Unit require terminals and interconnection?
Answer: Marley units are for a separate building.
j) GN #5 indicates the use of 1/0 bonding and class 1 down cables. 1/0 is not listed in UL96. Can
LPC 29-17 class 1 copper be used for all lightning conductor not mounted on or above metals having a galvanized, aluminum or zinc content?
REF: Drawings T-1
a) If ladders are taken down daily, will fencing still be required or will caution barrier tape with visual signage postage suffice?
Answer: Contractor to follow all necessary requirements to work on roof. Contractor is to submit the correct paperwork (as noted in SPEC) to NUWCDIVNPT Safety Department before contractor begins work on roof.
REF: Specs
a) Test wells with disconnects are mentioned in specs but not show anywhere on drawings. Where and how many?
b) AFI 32 1065 requires testing between each component (terminal to base, base to cable, across every splicer, across every bond, from roof to ground and from electrode to earth). LPI-IP has provisions to be the third-party inspection agency for this testing and certification will reflect this. UL does not. Can LPI be used as provider of “Master Certification”?
c) NFPA requires a dedicated electrode at each down conductor. Plans show a driven 10x3/4 rod welded to the cable, notes indicate loop conductor and specs mention a plate electrode. Any one of these is a valid electrode. Combining is not lowering resistance. What is required at each down cable?
d) Spec mentions sch 80 PVC and we assume this to be at grade to 6’ AFG to allow common bonding. Is 6’ what government requires in accordance with code UL96A?
e) Are down cables required to be concealed in the wall cavities as note in 3.1.2? Believe this to by a typo please confirm requests.
REF 3.1.2 Down Conductors- “Use Schedule 80 PVC to protect down conductors. Paint the
Schedule 80 PVC to match the surrounding surface with paint that is approved for use on PVC.
Down conductors are to be concealed within the wall cavities.” ??
f) Resistance testing to 25 ohms when a loop is not used. What is required when a loop is used?