B-21 East Alert Apron
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F25R0005
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Ellsworth AFB, South Dakota 57706
- Points of contact
-
- Gloria Garside gloria.garside@usace.army.mil (402) 995-2585
- Brittany Gull brittany.c.gull@usace.army.mil (402) 995-2144
- Amanda Eaton amanda.e.eaton@usace.army.mil (402) 995-2829
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Omaha is soliciting contractors for the B-21 East Alert Apron construction project, a design-bid-build initiative to construct four new pre-engineered metal Environmental Protection Shelters (EPS), each approximately 20,000 square feet, designed to accommodate B-2A "Spirit" aircraft and general maintenance operations. The project includes associated airfield and ground support equipment paving, two 160-square-foot maintenance kiosks providing electrical and communication infrastructure, blast deflectors, PL-3 boundary fencing and lighting, and an entry control point. All facilities must be designed as permanent construction in accordance with DoD Unified Facilities Criteria, Air Force standards, and antiterrorism/force protection requirements, with sustainable construction materials and techniques used where cost-effective. The solicitation was posted on December 30, 2024, with proposals due by July 17, 2025. The project falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Y1BZ for Construction of Other Airfield Structures.
This opportunity carries no set-aside designation, making it available to all qualified contractors regardless of size or socioeconomic status. The work will be performed at Ellsworth Air Force Base in South Dakota, specifically at 1940 EP Howe Drive, where construction will occur on or near the existing Alert Apron adjacent to active airfield operations and other ongoing B-21 facility construction sites. The project presents special construction challenges including potential integration with active airfield operations, demolition of existing facilities and utilities, and remediation of hazardous materials contaminated apron and soils. The new airfield apron must be designed in compliance with UFC 3-260-02 standards and constructed according to UFGS 32 13 14.13 specifications. The contract includes space requirements constructed to AFI 16-1404 standards, emphasizing the specialized nature of this military aviation facility construction project.
Notice text
9 versions
Update #9 · Latest ·
UPDATE: 17 June 2025: Amendment 0007 was posted to PIEE on 17 June 2025. The amendment has been posted to PIEE. Please continue to monitor both SAM.gov and PIEE for updates. Please contact the contract specialist, Nancy Garside, gloria.garside@usace.mil of any questions.____W9128F25R0005-Amendment 0007 issued 17 June 2025The purpose of this amendment is as follows:1. Changes in DIV 00 22 00; DIV 00 72 00; specifications and drawings are available in Plan Room.2. The proposal due date is extended to 17 July 2025, 2PM (CT).3. Bidder inquires will be re-opened until 10 days prior to the bid date.4. Project Labor Agreement Clause 52.222-33 and 52.222-34 added in Div 00 72 00.5. All other terms and conditions remain unchanged.
Update #8 ·
Amendment - 0006 * Changes in specification and/or drawings. Proposal due date is extended to 1 April 2025, No Later Than (NLT) 2:00PM (CT). Bidder inquiries are closed and will remain closed. * To ensure 1 April 2025 is available for proposals. Am_1006 is part of Am_0006
Update #7 ·
Amendment - 0006 * Changes in specification and/or drawings. Proposal due date is extended to 1 April 2025, No Later Than (NLT) 2:00PM (CT). Bidder inquiries are closed and will remain closed.
Update #6 ·
Amendment 0005: The purpose of this amendment is for Revisions of Drawings and Specifications. Updated Provistions and Clauses IAW Class Deviation 2025-O0003 SUBJECT: Class Deviation Restoring Merit-Based Opportunity in Federal Contracts.
Update #5 ·
Amendment 0004: The purpose of this amendment is for Revisions of Drawings and Specifications.
Update #4 ·
Amendment 0003: The purpose of this amendment is to extend the proposal due date, revise the DIV 00 21 00 / 00 22 00 / 00 72 00, and provide updated drawings/specifications. Date for receipt of proposals is 25 MARCH 2025 at 1400 PM CST.
Update #3 ·
Am_0002 Posted on 7FEB25- See Amendment and attachments. *Am_0001 Posted on 28JAN25 - See Amendment and attachments.---This project is a design-bid-build (DBB) construction project that will provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS?s are sized to fit the B-2A ?Spirit? aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two (2) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS?s. Additional site features include blast deflectors, PL-3 boundary fencing and lighting, and an entry control point (ECP). This project will include a space or spaces constructed to AFI 16-1404 requirements.Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.Special construction and functional requirements: The project will be constructed on / near the existing Alert Apron at EAFB. As such, the project will be constructed adjacent to ? and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing facilities, utilities, and infrastructure ? to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13.
Update #2 ·
Am_0001 Posted on 28JAN25 - See Amendment and attachments.---This project is a design-bid-build (DBB) construction project that will provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS?s are sized to fit the B-2A ?Spirit? aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two (2) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS?s. Additional site features include blast deflectors, PL-3 boundary fencing and lighting, and an entry control point (ECP). This project will include a space or spaces constructed to AFI 16-1404 requirements.Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.Special construction and functional requirements: The project will be constructed on / near the existing Alert Apron at EAFB. As such, the project will be constructed adjacent to ? and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing facilities, utilities, and infrastructure ? to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13.
Update #1 ·
This project is a design-bid-build (DBB) construction project that will provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS?s are sized to fit the B-2A ?Spirit? aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two (2) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS?s. Additional site features include blast deflectors, PL-3 boundary fencing and lighting, and an entry control point (ECP). This project will include a space or spaces constructed to AFI 16-1404 requirements.Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.Special construction and functional requirements: The project will be constructed on / near the existing Alert Apron at EAFB. As such, the project will be constructed adjacent to ? and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing facilities, utilities, and infrastructure ? to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13.
Notice history
| Notice | Type | Posted |
|---|---|---|
| B-21 East Alert Apron | Award Notice | |
| B-21 East Alert Apron | Solicitation | |
| B-21 East Alert Apron | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity