B-21 East Alert Apron
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F25R0005
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
-
- Michele Renkema michele.a.renkema@usace.army.mil (402) 995-2153
- Amanda Eaton amanda.e.eaton@usace.army.mil (402) 995-2829
Notice details come from SAM.gov. Updated .
About this opportunity
Summary of the Pre-solicitation Notice:
This pre-solicitation notice is for a design-bid-build construction project to provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS) of approximately 20,000 SF each, along with associated airfield and ground support equipment (GSE) paving, maintenance kiosks, blast deflectors, fencing, lighting, and an entry control point. The project will be executed by the Department of the Army Corps of Engineers Engineering District Omaha and must comply with DoD, Air Force, and base design standards, including antiterrorism/force protection requirements. The facilities will be constructed on or near the existing Alert Apron at EAFB and may require integration with active airfield operations and adjacent construction sites.
The contract is not set-aside, and no potential incumbents or current contractors are named. The pre-solicitation does not provide any information on the award value or budget range. The key numerical details include the quantity of four (4) new EPS facilities and the timeline, with the posting date of September 24, 2024, and the due date of October 9, 2024.
Notice text
This project is a design-bid-build (DBB) construction project that will provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS?s are sized to fit the B-2A ?Spirit? aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two (2) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS?s. Additional site features include blast deflectors, PL-3 boundary fencing and lighting, and an entry control point (ECP). This project will include a space or spaces constructed to AFI 16-1404 requirements.Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.Special construction and functional requirements: The project will be constructed on / near the existing Alert Apron at EAFB. As such, the project will be constructed adjacent to ? and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing facilities, utilities, and infrastructure ? to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13.
Notice history
| Notice | Type | Posted |
|---|---|---|
| B-21 East Alert Apron | Award Notice | |
| B-21 East Alert Apron | Solicitation | |
| B-21 East Alert Apron | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity