AZ FLAP 237(1), Mormon Lake Road

Award Notice Posted

Solicitation number
6982AF18B000031
Agency
Awarded
to Intermountain West Civil Constructors Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
6982AF19C000004 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Coconino National Forest, Arizona, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Awarded Vendors: Intermountain West Civil Constructors, Inc.. Contract Award Dollar Amount: $9,449,044.70. Contract Award Date: 2018-12-20.

Update #3 ·

Amendment A001.

Update #2 ·

PROJECT DETAILS: AZ FLAP 237(1)
Project Details: The Mormon Lake Road project is 9.8 miles long and consists of widening the existing roadway to a consistent paved width of 34 feet. The existing roadway has 12 foot lanes and 0-2 feet of shoulders. The proposed project would widen the road to accommodate two 12 foot lanes and two 5 foot shoulders. Through the town of Mormon Lake, the proposed paved width would be two 11 foot lanes and two 4 foot shoulders within the existing disturbed road prism. Culverts will need to be widened along the route.
Line Item Unit Est. Quantity
Roadway Exc CUYD 60,000
Minor Drainage LNFT 500
Aggregate Base TON 20,0 00
Hot-asphalt concrete paveme nt TON 35,000
Anticipated solicitation date will be late October.
Anticipated Construction Duration: January 2019 - October 2019
Note: Severe winter weather is likely in the project location, with snow accumulating in winter and spring months. Additionally, summer monsoon moisture is likely.
Engineer's Estimate (IGE):$10-15M
This solicitation will be set aside for small business concerns..

Update #1 ·

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT DETAILS: AZ FLAP 237(1)
Project Details: The Mormon Lake Road project is 9.8 miles long and consists of widening the existing roadway to a consistent paved width of 34 feet. The existing roadway has 12 foot lanes and 0-2 feet of shoulders. The proposed project would widen the road to accommodate two 12 foot lanes and two 5 foot shoulders. Through the town of Mormon Lake, the proposed paved width would be two 11 foot lanes and two 4 foot shoulders within the existing disturbed road prism. Culverts will need to be widened along the route.
Line Item Unit Est. Quantity
Roadway Exc CUYD 60,000
Minor Drainage LNFT 500
Aggregate Base TON 20,0 00
Hot-asphalt concrete paveme nt TON 35,000
Anticipated solicitation date will be late October.
Anticipated Construction Duration: January 2019 - October 2019
Note: Severe winter weather is likely in the project location, with snow accumulating in winter and spring months. Additionally, summer monsoon moisture is likely.
Engineer's Estimate (IGE):$10-15M
This solicitation will be set aside for small business concerns..