Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\ s y m .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\ s y m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
SHEET
SURVEY CONTROL
A4
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\
A Z c o n tr o l_ s h e e t.
d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Flagstaff
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
Lake
Mormon
Scale in Miles
34 Miles to Winslow
30 Miles to Williams
SITE MAP
Coconino National Forest
Coconino National Forest
Coconino National Forest
Prescott National Forest
Kaibab National Forest
A5
L a k e M a r y R o a d
Forest Hwy 3
Lake M ary Road
A Z F
L A
P
M o r m o n L a k e R o a d
F o r e s t H w y
L a k e M a r y R o a d
Flagstaff
25 Miles to
State Highway 87
27 Miles to
Potential Staging Area
Transfer Station Station 613+09
End Project
Mormon Lake Road
AZ FLAP 237(1)
Station 101+00
Begin Project
Mormon Lake Road
AZ FLAP 237(1)
Potential Staging Area
Wildlife Viewing Area
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\
S it e
M a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
NO SCALE
NOTE:
Average Existing Width
Shoulder
Pulverized Width
Traveled way structural section details
See mainline typical section for
Foreslope
DETAIL A
5'
(safety edge) pavement edge
30° - 35°
Construct
24'
2% 2%
EXISTING
PROPOSED
Prime coat
5' 12' 12' 5'
Traveled WayTraveled WayShldr Shldr in two lifts pavement. Placed
3" Asphalt concrete
8" of Select Borrow
Tack coat (between lifts)
See Detail A shift 2-4'
Centerline
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
Min. superelevation 2% 6% Max. superele vation
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for
Sheet 1 of 2
MAINLINE
TYPICAL SECTIONS
588+00 to 613+09
380+00 to 420+00
348+00 to 362+00
252+00 to 285+00
101+00 to 154+00
TYPICAL SECTION
A6
16' Clear Zone16' Clear Zone
Construction and Clearing Limits
5' Limit
Stake
Slope
Volcanic red Sandy Gravel (cinders) depth 6" to 12".
Existing partially treated asphalt base 4"
Existing asphalt pavement depth 3".
VariesVa rie s
4.
3.
3.
8.
7.
6.
5.
4.
3.
2.
1.
Profile 8.
100+00 to 613+09
EXISTING TYPICAL SECTION
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway
101+00 to 613+09
9.70
51,209
51,209
Varies
5'
Vari es
Fog seal
8" Roadway Aggregate on profile design changes allowed in the contract.
at proposed centerline. See section 152 of the SCRs for information
Profile shown in cross sections is 2 inches above existing grade
See cross sections for superelevation.
Steepen the foreslopes as necessary, but not steeper than 1:2.
Construct a 1:4 foreslope unless otherwise directed by the CO.
Apply tack coat to the first lift prior to placing the second lift.
Place asphalt concrete pavement in two lifts.
See section 302 of the SCRs for information on roadway aggregate.
See cross sections for cut and fill slope ratios
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
See mainline typical section for
Foreslope
5'
(safety edge) pavement edge
30° - 35°
Construct
Varies
Vari es
Select borrow material
Limit
Stake
Slope
Limit
Stake
Slope
6.6.
for drainage and appearance.
concrete pavement. Shape and compact as necessary
(pay item 30203-2000) after placement of asphalt
Shoulder up with Roadway Aggregate Method 2 for drainage and appearance.
concrete pavement. Shape and compact as necessary
(pay item 30203-2000) after placement of asphalt
Shoulder up with Roadway Aggregate Method 2
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\
R ty p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
MAINLINE
TYPICAL SECTIONS
Sheet 2 of 2
5' 12' 5'
Shldr Traveled Way Traveled Way Shldr
2% 2% in two lifts pavement. Placed
3" Asphalt concrete
8" of Select Borrow
Prime coat
Tack coat (between lifts)
PROPOSED
EXISTING
shift 2-4'
Centerline
12'
5' 5'12'12' in two lifts pavement. Placed
3" Asphalt concrete
Shldr Traveled Way Traveled Way Shldr
(between lifts)
Tack coat
8" of Select Borrow
8" of Select Borrow
Prime coat
362+00 to 380+00
TYPICAL SECTION
super 6% max super 6% max
420+00 to 588+00
285+00 to 348+00
227+00 to 252+00
TYPICAL SECTION
A7
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Shldr
4'
Shldr
4'
Construction Limits
16' Clear Zone 16' Clear Zone
Fog sealPrime coat
Tack coat (between lifts)
11'11'
154+00 to 227+00
TYPICAL SECTION
pavement placed in two lifts
3" Asphalt concrete
Vari es
Varies
16' Clear Zone 16' Clear Zone
Construction and Clearing Limits
5'
Limit
Stake
Slope existing grade
Profile 3" above
V aries Var ies
Varies
Construction and Clearing Limits
16' Clear Zone
5'
Limits
Stake
Slope
3.
3.
3.
3.
Left and Right rumble stripes
Install edge line
Profile 8.
Profile 8.
NOTE:
See Detail B
DETAIL B
Detail A
See
Detail A
See
4.
4.
4.
9.
9.
8.
7.
6.
5.
4.
3.
2.
1.
Fog seal
Fog seal
8" Roadway Aggregate
8" Roadway Aggregate
See mainline typical section for
Foreslope
4'
(safety edge) pavement edge
30° - 35°
Construct
Varies
Vari es
Varies (min. 5')
8" Roadway Aggregate
6.6.
6.
6.
from Stations 165+00 to 227+00 at 3 inches above grade.
existing grade at proposed centerline. Keep the proposed profile
Profile shown in cross sections through town is 3 inches above on profile design changes allowed in the contract.
at proposed centerline. See section 152 of the SCRs for information
Profile shown in cross sections is 2 inches above existing grade
See cross sections for superelevation.
Steepen the foreslopes as necessary, but not steeper than 1:2.
Construct a 1:4 foreslope unless otherwise directed by the CO.
Apply tack coat to the first lift prior to placing the second lift.
Place asphalt concrete pavement in two lifts.
See section 302 of the SCRs for information on roadway aggregate.
See cross sections for cut and fill slope ratios
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
6.
for drainage and appearance.
concrete pavement. Shape and compact as necessary
(pay item 30203-2000) after placement of asphalt
Shoulder up with Roadway Aggregate Method 2
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\
R ty p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach
Variable
W
Variable
3' minimum
20' desired
15' min.
1.3'
W
1.3' d
APPROACH ROADS
TYPICAL SECTIONS
CLASSTYPE
APPLICATION
SAMPLE
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
4' (typ.)
U s e r e r in .j e s s e e
A
A
E
D
C
B
A
D
C
B
A
N/A
N/A
Aggregate driveway
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
Sheet 1 of 2
A8
STATION
CLASS
TYPE
REMARKS
APPROACH ROAD SUMMARY
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
(ft)
R
(ft)
W 1 2 (ft)
R widths greater than 15 feet.
Apply the normal crown to approach roads with
169+93 Lt.
155+26.61 Rt.
151+07.17 Rt.
147+06.71 Rt.
135+86.47 Rt.
122+05.39 Rt.
121+31.93 Lt.
120+39.19 Lt.
3A
3A
3A
3A
3A
3A
3A
3A
Match existing radii
Match existing radii
Match existing radii
Match existing radii
Match existing radii
Match existing radii
Match existing radii
Match existing radii
Variable
V a ria b le s
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li e grade (optional)
Typical maximum design
A
SECTION A-A
NOTE:
NO SCALE
(1:6 desirable)
1:4 or flatter thicknesses and foreslopes.
Refer to mainline typical sections for structural section
TYPICAL PLAN
TYPE 3
APPROACH ROAD
REMARKS
APPROACH ROAD SUMMARY
base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle
3.
1.
2.
2.
Total length
Paved length
Subgrade edge
90° W
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
edge subgrade
Normal
Aggregate base edge with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having pavement edge
Asphalt concrete
M a in li
B
B base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
3.
Total length
Subgrade edge
90° W pavement edge
Asphalt concrete
Aggregate base edge
TYPICAL PLAN
TYPE 4
APPROACH ROAD
ROW line approach roads.
Match existing radii for all Type 3 and Type 4 7.
6.
5.
4.
3.
2.
1.
4. 4.
5.
5.5.
6.
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\ ty p a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
APPROACH ROADS
TYPICAL SECTIONS
Sheet 2 of 2
A9
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts A G e n s h t\ ty p a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet and Description
B4 B5 B6 B7-B8 B9-B13 B14-B15 B16 B17-B19
Survey and Staking
Summary
Grading Summary
Surfacing Summary
Drainage Summary
Permanent Sign
Summary
Pavement Marking
Summary
TTC
Summary
Miscellaneo us
Summary Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 8.596 8.596
A0060 15210-3000 CENTERLINE, VERIFICATION AND
STAKING MILE 1.174 1.174
A0080 15214-3000 SURVEY AND STAKING, PARKING Parking Areas Near
AREA LPSM ALL Mormon Lake Lodge
A0100 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES MILE 17.193 17.193
A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0140 15401-0000 CONTRACTOR TESTING LPSM ALL
A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0180 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0200 15701-0000 SOIL EROSION CONTROL Sediment
Control LPSM ALL
A0220 15701-0000 SOIL EROSION CONTROL
Non-Stormwater Control LPSM ALL
A0240 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
A0260 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0280 20101-0000 CLEARING AND GRUBBING ACRE 69.314 2.686 72.000
A0300 20301-2400 REMOVAL OF SIGN EACH 98 7 105
A0320 20304-1000 REMOVAL OF STRUCTURES AND Removal of planters, OBSTRUCTIONS wheel stops, and existing concrete
LPSM ALL near Mormon Lake Lodge
A0340 20401-0000 ROADWAY EXCAVATION CUYD 27,294 2,706 30,000
A0360 20402-0000 SUBEXCAVATION CUYD 2,000 2,000 As directed by the CO.
A0380 20410-0000 SELECT BORROW CUYD 13,146 1,354 14,500
A0400 20441-0000 WASTE CUYD 8,417 883 9,300
A0420 25101-2400 PLACED RIPRAP, METHOD B,
CLASS 4 CUYD 69 6 75
A0440 30203-2000 ROADWAY AGGREGATE, METHOD 2 SQYD 203,959 10,041 214,000
A0500 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 33,117 3,383 36,500
A0520 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 333 32 365
A0560 40601-0000 FOG SEAL TON 85 8 93
MileStone: 100% Date Completed: 08/30/18 Report Date: 09/04/18
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 4-
S ep
-2
7:
A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities cf lc ad d3 .c flh d.
lo ca l\ pr oj ec ts \A
Z \a z2
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
STATE PROJECT
B1AZ FLAP 237(1)
Mormon Lake
AZ
SHEET
NUMBER
Survey and Staking
Summary
Grading Summary
Surfacing Summary
Drainage Summary
Permanent Sign
Summary
Pavement Marking
Summary
TTC
Summary
Miscellaneo us
Summary Allowance Bid
Schedule
A0580 40605-0000 BLOTTER TON 1,504 146 1,650
A0600 41102-1000 PRIME COAT, METHOD 1 SQYD 203,959 10,041 214,000
A0620 41201-0000 TACK COAT TON 89 8 97
A0640 60201-0600 18-INCH PIPE CULVERT LNFT 125 13 138
A0660 60201-0800 24-INCH PIPE CULVERT LNFT 149 14 163
A0680 60201-0900 30-INCH PIPE CULVERT LNFT 25 3 28
A0700 60201-1000 36-INCH PIPE CULVERT LNFT 21.5 4.5 26.0
A0720 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 2 13
A0740 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 18 20
A0760 60210-0900 END SECTION FOR 30-INCH PIPE
CULVERT EACH 3 2 5
A0780 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 6 2 8
A0800 60220-1800 8 FEET SPAN, 4 FEET RISE Includes headwalls
PRECAST REINFORCED CONCRETE and wingwalls.
BOX CULVERT LNFT 18 4 22
A0820 60704-0000 CLEANING CULVERT IN PLACE EACH 25 6 31
A0840 60901-8000 CURB, TIMBER LNFT 118 12 130
A0860 60902-1100 CURB AND GUTTER, CONCRETE,
13-INCH DEPTH LNFT 223 22 245
A0880 61901-0000 FENCE LNFT 223 77 300
A0900 61903-1300 CATTLE GUARD, 36 FEET EACH 4 4
A0920 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 60 60
A0940 62201-0350 BACKHOE HOUR 60 60
A0960 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 60 60
A0980 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 60 60
A1000 62201-3300 HYDRAULIC EXCAVATOR, 3/4
CUBIC YARD MINIMUM CAPACITY HOUR 60 60
A1020 62301-0000 GENERAL LABOR HOUR 60 60
A1040 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 100 100
A1060 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 100 100
A1080 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 23.4 1.6 25.0
A1100 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 23.4 1.6 25.0
4- S ep
-2
7:
A
M
MileStone: 100% Date Completed: 08/30/18 Report Date: 09/04/18 cf lc ad d3 .c flh d.
lo ca l\ pr oj ec ts \A
Z \a z2
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B2AZ FLAP 237(1)
Mormon Lake
AZ
Survey and Staking
Summary
Grading Summary
Surfacing Summary
Drainage Summary
Permanent Sign
Summary
Pavement Marking
Summary
TTC
Summary
Miscellaneo us
Summary Allowance Bid
Schedule
A1120 63301-0000 SIGN SYSTEM EACH 122 11 133
A1140 63308-2000 OBJECT MARKER, TYPE 2 EACH 150 15 165
A1160 63309-0000 DELINEATOR EACH 177 24 201
A1180 63316-1000 REMOVE AND RESET SIGN EACH 8 8
A1200 63402-0300 PAVEMENT MARKINGS, TYPE B,
SOLID MILE 68.1 1.4 7.5 77.0
A1220 63402-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN MILE 6.7 2.3 9.0
A1240 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 20 2 22
A1260 63405-0550 PAVEMENT MARKINGS, TYPE B,
STRAIGHT ARROW EACH 4 4
A1280 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 3 3
A1300 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
A1320 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 500 500
A1340 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 500 500
A1360 63502-2000 TEMPORARY TRAFFIC CONTROL, To be used on Lake
PORTABLE CHANGEABLE MESSAGE Mary Road as directed
SIGN EACH 2 2 by the CO
A1380 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 500 500
A1400 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 216 24 240
A1420 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 40.0 40.0
A1440 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 7,000 7,000
A1460 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 3,000 3,000
A1480 63610-0000 CONDUIT LNFT 40 40 Station 175+63
4- S ep
-2
7:
A
M
MileStone: 100% Date Completed: 08/30/18 Report Date: 09/04/18 cf lc ad d3 .c flh d.
lo ca l\ pr oj ec ts \A
Z \a z2
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
3) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B3AZ FLAP 237(1)
Mormon Lake
AZ
SUMMARY
SURVEY AND STAKING
B4
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S u r v e y S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
GRADING
B5
NOTE:
it meets Section 204 of the FP and the SCRs.
Waste material may be used for select borrow material if raise.
See Section 152 of the SCRs for contractor option on grade for information only.
The 3 inch above and 1 inch above tables are provided
The grading summary assumes 2 inch profile raise.
4.
3.
2.
1.
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m G r a d in g S u m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
SURFACING SUMMARY
B6
NOTE:
foreslope and shouldering up.
assumes the triangle area shown in the typical sections of the
Pay Item 30206-0500, Roadway Aggregate Shoulder Finishing surface.
calcuated by assuming the area under the proposed paved
Pay Item 30203-2000, Roadway Aggregate Method 2 was
2.
1.
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S u r fa c in g S u m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
DRAINAGE SUMMARY
B7
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m D r a in a g e S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m D r a in a g e S u m m a r y .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
DRAINAGE SUMMARY
B8
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m D r a in a g e S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
SIGN SUMMARY
PERMANENT
Sheet 1 of 5
B9
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S I G
N S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet 2 of 5
B10
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S I G
N S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet 3 of 5
B11
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S I G
N S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet 4 of 5
B12
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S I G
N S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet 5 of 5
B13
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S I G
N S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
B14
SUMMARY
PAVEMENT MARKINGS
STATE PROJECT
A
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S
T R I P I N
G S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
B15
SUMMARY
PAVEMENT MARKINGS
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m S
T R I P I N
G S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
CONTROL SUMMARY
TEMPORARY TRAFFIC
B16
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m T
T C S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
MISCELLANEOUS
Sheet 1 of 3
B17
STATE PROJECT
A
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet 2 of 3
B18
STATE PROJECT
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Sheet 3 of 3
B19
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
.1
IN
C
M P
.7
STONE
.3
S
IL
T E
D3029
.6
IN
C M
P
T T
W W
B W
S T
O
PP
O
T
.0
P C
C
.4
P T
.1
P C
.6
P O
T
.0
P C
.1
P C
C
.4
P T
.1
P C
.6
.3
.0
I
N C
M P
7224.4
BH1
I
N C
M P
.4
.9
.1
IN
C
M P
P C
.6
P T
.0
P C
.6
P T
.0
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
C1
STATIONS 100+00 TO 128+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
PI 101+84.45
D
R = 1,803.00'
T = 108.27'
L = 216.28'
Curve = MAIN-1 Curve = MAIN-2
PI 107+31.78
D
R = 947.50' T = 439.33'
Curve = MAIN-3
PI 116+25.27
D
R = 1,100.00'
T = 192.67'
L = 381.47' e = 4.2% e = 5.6%
L = 822.74' e = 5.4%
A
A
A
.1
.9
.3
ADD 24" FES
Extend 24" CMP 1.5'
100+84 Lt.
Add 24" FES
Extend 24" CMP 5'
121+54 Lt.
Install new cattle guard
Remove existing cattle gaurd
101+00
Station 101+00
Mormon Lake Road
Begin AZ FLAP 237(1)
26.5 F
T HIG
H
T
7196.9
BH2
STOP
P C
.9
P T
.0
P C
.5
P C
.9
P T
.0
P C
.5
71307130
.0
.0
H X
W B
O X
.5
.5
H X
W B
O X
BENCH MARK
ADOT BC "7122.91"
7126.657
BENCH MARK
7128.390 ADOT BC "7124.91"
HAND RAILFLAG POLE
7139.6
7141.5
18 IN
CM
P
STOP
7167.37169.4
18 IN CMP
P T
.4
P T
.4
20100
20118
C2
STATIONS 128+00 TO 158+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
A
Curve = MAIN-4
PI 136+88.37
D
R = 2,803.00'
T = 201.38'
L = 402.06'
A
Curve = MAIN-5
PI 145+12.56
D
R = 975.00'
T = 342.00'
L = 657.86'
A
.4
.1
7 1
.6 e = 3.2% e = 5.6%
A
Install cattle guard
Remove existing cattle guard.
157+70
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d g n
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
7125 7125 7125
71257125
7125 7125
.0
.0
H X
W B
O X
.5
B W
B W
.0
I
N C
M P
.9
BW
T P
O S
T
T P
O S
T
T P
O S
T
T
.8
IN
C
MP
BWT POST
.6
R R T I E
I
N C
M P
.4
BENCH MARK BH3
7126.8
CONC
.8
I
N C
M P
.8
.0
C O
N C
BENCH MARK
7128.390
ADOT BC "7124.91"
.7
I
N C
M P
I
N C
M P
.0
.1
.3
STONE
WOOD
STONE
7131.4
STONE
S T
O N
E
20099
20100
SECTION LINE
W A T E R
W A T E R
W A T E R M
E T E R
.2
B H 4 4163
X
X
X
X
X
20201
20302
20303
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
C3
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 158+00 TO 187+00
PLAN SHEET
MORMON LAKE ROAD
A
1+
A
A
A
A
A
4 1
A
A 4
A
A
A
A
A
A
A
A
A
A
Clean culvert in place
170+62 Lt.
Clean culvert in place
173+44 Lt.
Clean culvert in place
176+79 Lt.
Clean culvert in place
179+36 Lt.
Clean culvert in place
180+43 Lt.
Clean culvert in place
180+90 Lt.
Clean culvert in place
181+68 Lt.
Clean culvert in place
182+48 Lt.
Clean culvert in place
182+99 Lt.
Clean culvert in place
183+37
Clean culvert in place
184+78 Lt.
Clean culvert in place
185+11 Lt.
Clean culvert in place
185+32
A
A
3" pipe conduit for future
Install 40' of
175+63
Clean culvert in place
185+85 Lt.
the ditch will be through equipment hours.
Grade ditch to drain between culverts. Payment for grading around station 172+50 and continues to station 191+00.
There is an existing ditch along the left side of the road that begins
Note:
the ditch will be through equipment hours.
Grade ditch to drain between culverts. Payment for grading around station 172+50 and continues to station 191+00.
There is an existing ditch along the left side of the road that begins
Note:
71257125
7125 7125 7125
7125 7125
STOP
7126.2
BH4
T
W
ATER
IRRIGATION
W
ATER
IRRIGATION
W
ATER
W
ATER
IRRIGATION
W
ATER
IRRIGATION
VENT
4 IN
20139
20140
20168
P. C.
X
20183
20184
P. C.
X
20186
20187
20188 20189
20190
20196
P. C.
X
20308
20309
P. C.
X
20323
P. C.
X
.0
X
X
X .8
I
N C
M P
X
.3
.9
I
N C
M P
.1
I
N C
M P
STOP
12 IN CMP
7124.8
.1
T
X
T
F
IR
E P L
A C
E
T
T
W A T E R F
A U
C E T
T
V E N T
T
STONE LANDSCAPING
G A S L
IG
H T
E V
E
G A S L
IG
H T
0 2
0 2
20137
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
C4
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 187+00 TO 215+00
PLAN SHEET
MORMON LAKE ROAD
A
A
A
A
A
A
A
A 4
A
A
A
A
A
A
A
A
Clean culvert in place
186+90 Lt.
Clean culvert in place
187+77 Lt.
Clean culvert in place
188+32 Lt.
Clean culvert in place
188+62 Lt.
Clean culvert in place
189+04 Lt.
Clean culvert in place
190+33 Lt.
in place
Clean culvert
189+47 Lt.
A
A
A
A
Clean culvert in place
193+22
A
Clean culvert in place
200+82
Clean culvert in place
209+38
Add 24" FES
Extend 24" CMP 5'
213+73 Lt.
A in front of lodge
Remove existing planters
See Sheet D2 for parking lot layouts.
Note:
the ditch will be through equipment hours.
Grade ditch to drain between culverts. Payment for grading around station 172+50 and continues to station 191+00.
There is an existing ditch along the left side of the road that begins
Note:
57125
I
N C
M P
.6
BW
I
N S
T E
E L P I P
E U
P I
N
.9
I
N C
M P
.9
.9
F
IR
E R
IN
G
.1
X
I
N C
M P
.1
WOOD A
RCH W
AY
.3
WOOD RAIL
2 I N S
TEEL
I
N C
M P
T
.9
B H
T E L E
20157
71207120
71257125
.2
.3
I
N C
M P
.4
.3
I
N C
M P
.7
I
N C
M P
.6
T
TE
LE
OLD ROAD BED
T
P T
.0
P C
.7
P T
.3
P T
.0
P C
.7
P T
.3
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
C5
STATIONS 215+00 TO 243+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-18
PI 228+41.06
D
R = 1,002.50'
T = 148.12'
L = 294.11' e = 5.4% 3
A
Curve = MAIN-19
PI 241+89.20
D
R = 2,000.00'
T = 196.41'
L = 391.56' e = 4.0%
Add 18" FES
Extend 18" CMP 11'
232+16 Rt.
Add 18" FES
Extend 18" CMP 12'
232+72 Rt.
Add 30" FES
Extend 30" CMP 1'
237+80 Rt.
A
1. Stations 239+00 -246+00 potential material source.
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
5 7140 7145
BW
T T
.3
I
N C
M P
.5
I
N C
M P
.9
.1
T T
N O P
A S
S I N
G Z
O N
E
P T
.3
P T
.3
71407145
7155 7155
E R
O S I O
N
.7
.7
I
N C
M P
.8
IN
C
M P
.7
.7
IN
C
M P
BOULDERS
.1
.5
I
N C
M P
I
N C
M P
.9
.5T T
.1
T
C U
R V
E
N O P
A S
S I N
G Z
O N
E
90N
BH
7156.4
P C
.0
P C
.0
C6
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 243+00 TO 270+00
PLAN SHEET
MORMON LAKE ROAD
Add 24" FES
Extend 24" CMP 12.5'
246+23 Lt.
Add 24" FES
Extend 24" CMP 5.5'
255+22 Lt.
Curve = MAIN-20
PI 267+97.72
D
R = 2,333.00'
T = 532.67'
L = 1,047.38' e = 3.6%
Add 36" FES
Extend 36" CMP 4'
258+41 Lt.
A
Add 24" FES
Extend 24" CMP 20.5'
266+94 Lt.
NOTE:
1.
1.
NOTE:
Stations 239+00 -246+00 potential material source.
Stations 260+50 - 268+50 potential material source.
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
5 7135 7135
7145 7145
7145 714
5 7150
T
.2
T
BW
T
T
I
N C
M P
.0
BW
.7
T
T BWSTEEL7
.7
.7
T
.8
IN
C
M P
.9
C U
R V
E
IN
C
M P
.7
.7
IN
C
M P
.2
I
N C
M P
.8 F
T H I G
H
P T
.4
P C
.5
P T
.0
P T
.4
P C
.5
P T
.0
.7
IN
C
M P
.5
T
T
T
.5
.6 F
T H
IG
H
.0
B H
I
N C
M P
.7
T
LARGE STONES
R O
W O
F R
O C
K S
P T
.0
P C
.8
P T
.0
P C
.8
C7
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 270+00 TO 298+00
PLAN SHEET
MORMON LAKE ROAD
Add 24" FES
Extend 24" CMP 7.5'
271+12 Lt.
Add 24" FES
Extend 24" CMP 4.5'
272+58 Lt.
A
D
Curve = MAIN-21
PI 280+59.66
R = 1,439.50'
T = 450.14'
L = 872.54' e = 4.6%
Add 36" FES
Extend 36" CMP 2.5'
279+57 Lt.
Add 36" FES
Extend 36" CMP 3'
298+37 Rt.
A
A
A
1. Stations 292+50 - 296+00 potential material source.
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7160 7165
.5
T E
L E
C
A B
L E
I
N C
M P
.7
T
LARGE STONES
T
P C
.8
P T
.0
P C
.9
P C
.8
P T
.0
P C
.9
.0
.0
I
N C
M P
T
IN
C
M P
.3
.1
B H
.9
7172.3
18 IN CMP SILTED
7173.4
T
X T
E L E
P T
.2
P C
.2
P T
.3
P T
.2
P C
.2
P T
.3
C8
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 298+00 TO 327+00
PLAN SHEET
MORMON LAKE ROAD
Curve = MAIN-22
PI 301+40.47
D
R = 1,102.50'
T = 331.59'
L = 644.20' e = 5.2%
PI 312+52.76
D
R = 671.50'
T = 704.79'
L = 1,087.27'
Curve = MAIN-23 e = 6.0%
Curve = MAIN-24
PI 323+75.74
D
R = 977.50'
T = 336.45'
L = 648.07' e = 5.6%
Add 24" FES
Extend 24" CMP 2.5'
316+42 Rt.
Add 18" FES
Extend 18" CMP 3'
324+73 Rt.
A
A
A
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
71707170
T
.6
B W
.7
I
N C
M P
B H
.1
T
T
P T
.3
P C
.6
P T
.3
P C
.5
P T
.3
P C
.6
P T
.3
P C
.5
W A
T E
R
W A
T E
R
T
S T
O P
X
X
X
X
X
X
T
X
X
X
X 2 2
X
X
T
STOP
X
X
X
X
T
X
X
X V
A U
L T
T
X
T
X
X
X
X
X 3 3
X
O/H APPROX 18'
P T
.0
P C
.9
P T
.4
P C
.2
P C
C
.7
P T
.8
P C
.6
P T
.0
P C
.9
P T
.4
P C
.2
P C
C
.7
P T
.8
P C
.6
C9
STATIONS 327+00 TO 355+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-25
PI 332+76.28
D
R = 1,497.50'
T = 205.66'
L = 408.76' e = 4.6%
Curve = MAIN-26
PI 339+37.39
D
R = 815.00'
T = 291.85'
L = 560.50'
Curve = MAIN-27
PI 344+30.78
D
R = 5,000.00'
T = 157.81'
L = 315.52'
Curve = MAIN-28
PI 348+79.67
D
R = 566.50' T = 105.46' L = 208.52'
Curve = MAIN-29
PI 351+13.27
D
R = 599.50'
T = 130.54'
L = 257.06' e = 5.8% e = 2.0% e = 6.0% e = 6.0%
Extend 2'x3' squashed CMP 1'
344+12 Lt.
Add 24" FES
Extend 24" CMP 1.5'
352+20 Lt.
A
A
A
Shdr_Outside_Layer1_L
Shdr_Subgrade_L
Pvmt_ETW_LayerTop_L
Shdr_EOP_Layer1_L
Shdr_Wedge_Layer2_R
Shdr_Outside_Layer41_L
Shdr_Outside_Layer31_L
Slope_Stake_Fill_L
Pvmt_ETW_Layer1_L
Shdr_EOP_LayerTop_L
Shdr_Outside_Layer1_R
Shdr_EOP_Layer41_L
Shdr_EOP_Layer1_R
Pvmt_ETW_LayerTop_R
Shdr_EOP_Layer31_L
Shdr_ETW_Layer2_L
Shdr_ETW_Layer3_L
Shdr_EOP_LayerTop_R
Pvmt_ETW_Layer1_RShdr_ETW_Layer4_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer1
Shdr_Wedge_Layer2_L
Shdr_Subgrade1_L
Shdr_Outside_Layer1_L
Shdr_Subgrade_L
Pvmt_ETW_LayerTop_L
Shdr_EOP_Layer1_L
Shdr_Wedge_Layer2_R
Shdr_Outside_Layer41_L
Shdr_Outside_Layer31_L
Slope_Stake_Fill_L
Pvmt_ETW_Layer1_L
Shdr_EOP_LayerTop_L
Shdr_Outside_Layer1_R
Shdr_EOP_Layer41_L
Shdr_EOP_Layer1_R
Pvmt_ETW_LayerTop_R
Shdr_EOP_Layer31_L
Shdr_ETW_Layer2_L
Shdr_ETW_Layer3_L
Shdr_EOP_LayerTop_R
Pvmt_ETW_Layer1_RShdr_ETW_Layer4_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer1
Shdr_Wedge_Layer2_L
Shdr_Subgrade1_L
9'
14'10'
.5 m in
1:2
Placed class 4 riprap.
(non-woven), type C
Earthwork geotextile, Class 1 extension details.
pay item. See 602 Specials A-I for considered subsidiary to 6022-0350 box culvert 9'. Headwall and wingwall
350+05 Lt. Extend existing box 8'x4'
350+05 Box Culvert Extension and Riprap at culvert outlet.
See cross section below for riprap detail
350+05 Rt.
A
A
A
A
A
A
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
.7
.7
I
N C
M P
.6
T
I
N C
M P
.1
T
B W
TT
P
O S T
.6
B H
STO
P
BO
TTO
M O
F PO
O L
BO
TTO
M O
F PO
O L
T P
O S T
T P
O S T
T P
O S T
.8
IN
C
M P
W A T E R
7141.5 7141.5
W A T E R
12 IN
STEEL TO
P O
F PIPE
STE
EL R
ETAIN
ING
C O
N C
B W
.7
STOP
I
N P
V C
S T E
E L R
E T
A
IN
IN
G
T S T O P
X
X
X
X
X
X
T
X
X
X
X
X
X
PCC 349+
82.74
P T
.8
P C
.6
5+
PT 365+
20.93PCC 349+
82.74
P T
.8
P C
.6
5+
PT 365+
20.93
O ffs e t=
' L
T
S ta
.0
7140 7140
7145 7145
.4
IN
C
M P
.7
.7
I
N C
M P
.1
B U
R
IE
D C
A B
L E
B U
R I E
D C
A B
L E
T
B U
R
IE
D C
A B
L E
N O P
A S
S Z
O N
E
T
C U
R V
E
N O P
A S
S I N
G Z
O N
E C
U R
V E
TB
U
R I E
D C
A B
L E
D I R
E C
T I O
N S
7133.6
BH11
STONE
P T
.9
P C
.7
PT
.8
P T
.9
P C
.7
PT
.8
C10
STATIONS 355+00 TO 379+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-30
PI 361+11.17
D
R = 718.00'
T = 728.54'
L = 1,138.29' e = 6.0%
A
A
A
Add 36" FES
Extend 36" CMP 2'
361+22 Lt.
Curve = MAIN-31
PI 376+23.50
D
R = 800.00'
T = 379.73'
L = 709.08' e = 6.0%
Add 18" FES
Extend 18" CMP 9'
377+75 Lt.
Stations 369+00 - 376+50 potential material source.1.
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7190 7190
5 7220
.9
I
N C
M P
IN
C
M P
.4
IN
C
M P
.8
B U R
IE
D C
A B
LE
.9
.1
B U
R
IE
D C
A B L E
B U
R I E
D C
A B
L E
C U
R V
E
.2
B H
T
T
C U
R V
E
P T
.8
P C
.2
P T .0
PO
T .0
PC
.3
P C
C
.6
P C C
.1
PT 1003+
44.27
POT 1003+78.91
P T
.8
P C
.2
P T .0
7130713
0 7
.4
.0
I
N C
M P
.8
.9
I
N C
M P
B U
R I E
D C
A B
L E
B U
R I E
D C
A B
L E
C U
R V
E
N O P
A S
S I N
G
X
P T
.0
P C
.2
P T
.2
P C
.2
P T
.2
PT
.2
PO
T .9
P T
.0
P C
.2
P T
.2
P C
.2
P T
.2
C11
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 379+00 TO 407+00
PLAN SHEET
MORMON LAKE ROAD
Curve = MAIN-32
PI 390+43.19
D
R = 814.50'
T = 432.90'
L = 795.80' e =5.8%
Add 24" FES
Extend 24" CMP 3'
393+68 Lt.
PI 400+38.26
D
R = 1,250.00'
T = 192.98'
L = 382.93'
Curve = MAIN-33 Curve = MAIN-34
PI 404+68.16
D
R = 1,000.00'
T = 107.91'
L = 214.98' e = 5.0% e = 4%
Add 24" FES
Extend 24" CMP 3'
384+98 Lt.
See Sheet D1
Stations 379+50 - 397+00 potential material source.1.
NOTE:
Stations 379+50 - 397+00 potential material source.1.
P
M c fl c a d d .c fl h d .l o c a l\ p r o je c ts A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
71257125
7140 7
.8
I
N C
M P
.8
I
N C
M P
.5
T
T
18 IN CM
P
.5
7128.4
DIR ONLY
D I R O
N L
Y
T
B H
.0
.5
I
N C
M P
3 2 1
.3
X S
Q U
A S
H P I P
E
.9
STOP
T
P T
.2
P C
.2
P T
.3
P T
.2
P C
.2
P T
.3
7140 7140
.2
IN
C
M P
.8
.1
I
N C
M P
.87137.0
BW
.3
I
N C
M P
.5
.6
7137.6
24 IN CMP SILTED IN
X S
Q U
A S
H P
IP
E
.9
I
N C
M P
.1
7138.1
7138.9
12 IN CM
P
W O
O D
T E
L T
T
T
W O
O D
W O
O D
T
T
X
STOP
P C
.2
P C
.2
407+00 TO 434+00
PLAN SHEET
MORMON LAKE ROAD
C12
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-35
PI 411+78.74
D
R = 3,800.50'
T = 346.47'
L = 691.03' e = 2.4%
A
Curve = MAIN-36
PI 430+90.22
D
R = 1,622.00'
T = 689.99'
L = 1,304.75' e = 4.4%
A
A
A
A
Add 24" FES
Extend 24" CMP 16'
427+94 Rt.
Add 24" FES
Extend 24" CMP 4.5'
431+97 Rt.
Add 36" FES
Extend 36" CMP 9'
424+27 Rt.
existing pump house
Do not disturb
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7130 7135
I
N C
M P
.8
.9
W A
T E
R
F L E
X I B
L E W
A T
E R L I N
E V
A L
V E
T
T
TT
X
.3
B H
7156.0
IN
C
M P
.6
18 IN CMP
7157.6
.7
S I L T
E D
X V
A U
L T T
E L T
D S
T
.0
I
N C
M P
.2
7164.6
18 IN CM
P
7165.0
T
STOP
T
P T
.9
P C
.3
P T
.8
P T
.9
P C
.3
P T
.8
O ffs e t=
' R
T
S ta
.8
07180
7164.6
18 IN CMP
7165.0
I
N C
M P
.8
T
7168.0
.6
7169.0 18 IN CMP POOR
.8
S A
T D
I S
H
T
I
N C
M P
.9
.8
.8
IN
B
O X
V70744
D I R O
N L
Y
.3
I
N C
M P
T
T
T E
L E
C O
M
X
BENCH MARK
A D
O T B
M E
L E V
.0
.5
W I R
E H
T
.0
P T
.8
P C
.6
P T
.7
P T
.8
P C
.6
P T
.7
C13
STATIONS 434+00 TO 463+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-37
PI 444+35.25
D
R = 1,138.00'
T = 468.89'
L = 889.53' e = 5.2%
A 3
A
Add 24" FES
Extend 24" CMP 8'
443+61 Rt.
A
A
A
A
A
Curve = MAIN-38
PI 458+78.45
D
R = 962.00' T = 474.85' L = 882.20' e = 5.6%
Add 24" FES
Extend 24" CMP 16'
458+10 Rt.
A
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
.8
.8
IN
B
O X
W O
O D
T P
O S
T
DUP115
DUP52
T P
O S
T
T
T
T E
L E
C O
M
X
T P
O S
T
W O
O D
3 2 1
BW
BW
BENCH MARK
A D
O T B
M E
L E
V
.0
.5
.1
B H
P T
.7
P C
.2
P T
.8
P T
.7
P C
.2
P T
.8
H .E .S N o . 3
E n d U
S F S P a rc e l 7
S ta
.5
BW
W O
O D
6 T P
O S
T
T P
O S
T
BW
7210.3
7212.2
18 IN CMPSTOP
P C
.1
P T
.4
P C
.1
P T
.4
B e g in U
S F S P a r c e l 8
S ta
.4
C14
STATIONS 463+00 TO 492+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-39
PI 466+78.51
D
R = 1,103.00'
T = 266.30'
L = 522.59' e = 5.2%
A
A
Curve = MAIN-40
PI 480+99.48
D
R = 6,997.00'
T = 303.35'
L = 606.33'
A
602 Specials A-I for extension details.
subsidary to pay item 60221-0350. See
Headwall and wingwalls are considered culvert 9'. Install headwalls and wingwalls.
463+12 Rt. Extend existing 8'x4' box e = 2.0%
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7230 7230
.1
I
N C
M P H
A L F S I L T E
D
.1
B U
R I E
D
BENCH MARK
I
N C
M P
.1
.6
B H
.0
P C
.3
P T
.1
P C
.3
P T
.1
.7
I
N C
M P H
A L F S I L T
E D
.8
132STOP
.3
B H
P T
.1
P C
.6
P T
.3
P T
.1
P C
.6
P T
.3
C15
STATIONS 492+00 to 522+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-41
PI 505+06.37
D
R = 2,427.00'
T = 132.07'
L = 263.88' e = 3.4%
Add 24" FES
Extend 24" CMP 10'
496+12 Rt.
Install 36' cattle guard
Remove existing cattle guard
503+58
Add 18" FES
Extend 18" CMP 7.5'
505+03 Rt.
A
Add 18" FES
Extend 18" CMP 10.5'
Clean CMP
512+22 Rt.
Curve = MAIN-42
PI 515+15.24
D
R = 8,997.00'
T = 401.65'
L = 802.76'
A
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
U S F S N
O V
E H
IC
L E S
T P
O S
T
IN
C
M P B
U R
IE
D
.1
.2
I
N C
M P H
A L F S I L T
E D
.8
U S
F S N
O M
O T
O R V
E H
IC
L E S
U S
F S
F
C U
R V
E
P C
.3
P T
.8
P C
.3
P T
.8
71857190
7187.6
BH18
A N
G L E I
R O
N R
O W
U
SF
S
E
U S F S N
O V
E H
IC
L E S
A N
G L E
IR
O N R
O W
IN
A
C C
O C
O N
IN
O C
O U
N T
Y
P T
.8
P C
.7
P T
.8
P T
.8
P C
.7
P T
.8
C16
STATIONS 522+00 TO 552+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-43
PI 532+56.65
D
R = 1,187.00'
T = 447.31'
L = 855.55' e = 5.2%
Add 18" FES
Extend 18" CMP 16'
529+74 Rt.
Add 18"FES
Extend 18" CMP 13'
533+76 Rt.
Curve = MAIN-44
PI 543+98.27
D
R = 2,282.00'
T = 315.56'
L = 627.15' e = 3.6%
A
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
.1
.6
I
N C
M P
.8
I
N C
M P
.4
P C
.4
P T
.4
P C
.4
P T
.4
57190
ROCKS AVG 3X3
WOOD
BH19
9.0
C17
STATIONS 552+00 TO 580+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-45
PI 561+75.41
D
R = 1,612.00'
T = 301.96'
L = 597.00'
L = 597.00'
Add 18"FES
Extend 18" CMP 16.5'
554+00 Rt.
Add 18" FES
Extend 18" CMP 12.5'
563+91 Rt.
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
71457145
.5
ELEC V
AULT
#PB2
- 2 .5X4
.2
I
N C
M P
.1
I
N C
M P
.1
STOP
ROCKS AVG 3X3
P C
.1
P T
.8
P C
.1
P T
.8
.5
.2
I
N C
M P
RO
W A
N G
LE
I
RO
N
R O
W A
N G
L E I
R O
N
.1
7156.3
24 IN
CM
P
7156.3
USFS AREA CLOSED
.1
.0
I
N C
M P
WIRE HT 24.3
U S
F S R
D
F
P C
.1
P T
.8
P C
.1
P T
.8
C18
STATIONS 580+00 TO 603+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Curve = MAIN-46
PI 591+26.32
D
R = 1,638.00'
T = 301.17'
L = 595.68' e = 4.4%
Add 30" FES
Extend 30" CMP 14.5'
584+68 Lt.
Add 18" FES
Extend 18" CMP 14'
590+48 Lt.
A
Add 24" FES
Extend 24" CMP 22.5'
600+41 Lt.
A
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts C
M L P
P S c o p in g P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7180 7185
.3
IN
C
M P
.3
.1
.0
I
N C
M P
ROW
A
NGLE
IR
ON
P C
.0
P T .0
P C
.0
P T .0
C19
STATIONS 603+00 TO 614+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
Station 613+09.03
Mormon Lake Road
End AZ FLAP 237(1)
Curve = MAIN-47
PI 611+30.29
D
R = 500.00'
T = 237.25'
L = 443.04' e = 6.0%
Add 30" FES
Extend 30" CMP 9.5'
604+76 Lt.
Install new cattle guard
Remove existing cattle guard
613+09
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts D
M in o r P
P P a r k in g P P .d g n
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7125 71
7155 71
657170
7170 71
7190 7190
A N
G L E
IR
O N R
O W
A D
O T M
O N P
C .4
A N
G L E
IR
O N R
O W
.9
IN
C
M P
.0
IN
C
M P
A D
O T A
N G
L E
IR
O N R
O W P
T .1
.8
A D
O T M
O N P
T
B U
R
IE
D C
A B
L E
.9
B U
R
IE
D C
A B
L E
C U
R V
E
.2
B H
T
A D
O T B
C P
C .4
A N
G L E
IR
O N R
O W
X
P C
.2
P T
.0
POT
+00
.0
+00
PC
+18
.3
P C
C
.6
P C
C
.1
9 PT
+44
.27
POT 1
3+
.91
P C
.2
P T
.0
V P I
E L
,1
.1
+4.
0%
-1.375%
,1
.1
V P I
E L
,1
.9
-1.375% +1.119%
42' VC
V P I
E L
,1
.9
+1.119% -0.000%
,1
.9
Curve = PARKING-2
PI 1002+08.53
D
R = 326.51'
T = 120.87'
L = 231.52'
Curve = PARKING-3
PI 1003+32.40
D
R = 32.33'
T = 13.21'
L = 25.08'
Curve = PARKING-1
PI 1000+55.27
D
R = 81.16'
T = 36.95'
L = 69.34'
1000+00 1001+00 1002+00 1003+00 1004+00
200'100'0
Scale in Feet
Station 1000+00.00
Begin Parking Area
Station 1003+78.91
End Parking
Pvmt_EOP_Layer3_L
Pvmt_ETW_LayerTop_L
Shdr_Wedge_Layer2_RPvmt_EOP_Layer1_R
Slope_Stake_Fill_L
Pvmt_ETW_Layer1_L
Pvmt_EOP_Layer3_R
Pvmt_ETW_Layer2_L
Pvmt_ETW_Layer3_L
Pvmt_ETW_LayerTop_R
Pvmt_ETW_Layer1_R
Slope_Stake_Fill_R
Pvmt_ETW_Layer2_R
Pvmt_CL_LayerTop
Pvmt_ETW_Layer3_R
Pvmt_CL_Layer1
Shdr_Wedge_Layer2_L
Pvmt_CL_Layer2
Pvmt_EOP_Layer1_L
Pvmt_CL_Layer3
Exterior Boundary
Exterior Boundary
A
A
2%2%
3" Asphalt concrete pavement.
Placed in two lifts
6" Aggregate base
Varies (34' max)
Construction and Staking Limits limit stake
Slope
5'
1:6 1:41:4
1:2
PARKING AREA PLAN AND PROFILE
Parking Station 1000+00
Main Station 388+24.48 =
Parking Station 1003+78.81
Main Station 391+40.61=
D1
SECTION A-A
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts D
M in o r P
P L o d g e .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
2X2
2X2
2X2
2X2
.1
I
N C
M P
12 IN CMP
7124.8
2X4
T
T
W
ATE
R
FAUCET
T
VENT
T
STONE LANDSCAPING
G
AS
LI
G
HT
G
AS
LI
G
HT
15' Rt.
201+45
R = 55'
31.5' Rt.
201+85
104.9' Rt.
202+56
R = 74'
119.6' Rt.
203+41
34' Rt.
203+4134' Rt.
204+09
27' Rt.
204+90
27' Rt.
205+17
36' Rt.
205+17
36' Rt.
206+38
15' Rt.
206+38
R = 10' 42.1' Rt.
207+33
52.2' Ft.
207+45
49.4' Rt.
207+64
34' Rt.
207+61
29.8' Rt.
209+04
113.3' Rt.
209+25
125.7' Rt.
208+71
72' Rt.
208+54
81.1' Rt.
207+54
R = 10'
77.3' Rt.
207+32
71.1' Lt.
203+59
R = 26'
109.7' Lt.
201+77
88' Lt.
201+37
R =25'
64.8' Lt.
201+84
R = 186'
15' Lt.
202+90
100'50'0
Scale in Feet
PARKING AREA LAYOUTS
MORMON LAKE LODGE
Traveled WayTraveled Way
Match existing Match existing
11'11'
SECTION A-A
for structural section
See typical section
Existing boardwalk
Do not disturb
Concrete curb and gutter
Concrete curb and gutter
6' tie edge timber or railroad
8" x 8" treated Unpaved path
Hitching post rail
Hitching post railHitching post rail
D2
R = 20'
43' Rt.
206+52
93.8'
206+56
93.3' Rt.
207+11
35.7' Rt.
207+10
32.4' Rt.
206+68
R = 9'
Begin hitching post fence.
curb and gutter.
Begin concrete
204+09 Rt.
End hitching post fence curb and gutter.
End concrete
204+78 Rt.
Begin timber curb.
Begin aggregate path.
Begin hitching post fence.
curb and gutter.
Begin concrete
203+60 Lt.
End timber curb.
End aggregate path.
End hitching post fence.
curb and gutter.
End concrete
204+78 Lt.
Begin hitching post fence curb and gutter.
Begin concrete
202+80 Rt.
End hitching post fence.
curb and gutter.
End concerte
203+16 Rt.
area
Existing paved
Remove existing fence
1:4 first asphalt lift)
(applied prior to
Prime coat asphalt lifts)
(applied between
Tack coat
1:4
Placed in two lifts concrete pavement
3" Asphalt
Parking Area Typical Section
Varies
Tie into existing ground ground existing
Tie into
Grade to drain
6.
5.
4.
3.
2.
1.
NOTES:
in aggregate base.
Use waste material from job to grade parking areas before bringing
Do not distrub exsiting ashpalt swale or concrete swale in front of lodge.
All call outs for parking areas are stations and offsets from centerline.
Grade parking lots to drain.
to design and layout parking areas.
for approval by the CO. Use hired techincal services pay item
Layout all parking areas before construction activities begin
Do not remove any trees for parking area construction.
Varies concrete in front of lodge
Remove existing existing concrete
Remove gas pumps
Do not disturb concrete around
Shldr
4'
Shldr
4'
6" Roadway Aggregate
6" Roadway Aggregate Path
.3
.0
I
N C
M P
I
N C
M P
.4
.9
.1
IN
C
M P
P C
.6
P T
.0
P C
.6
P T
.0
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
.1
IN
C
M P
.7
STONE
.3
S
IL
T E
D3029
.6
IN
C M
P
T T
W W
B W
807285
E1
STATIONS 100+00 TO 128+00
EROSION CONTROL SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
26.5 F
T HIG
H
T
7196.9
BH2
71307130
.0
.0
H X
W B
O X
.5
.5
H X
W B
O X
BENCH MARK
ADOT BC "7122.91"
7126.657
BENCH MARK
7128.390 ADOT BC "7124.91"
FLAG POLE
7139.6
7141.5
18 IN
CM
P
7167.37169.4
18 IN CMP
20100
20118
71807
E2
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 128+00 TO 158+00
EROSION CONTROL SHEET
MORMON LAKE ROAD
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d g n
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
7125 7125 7125
71257125
7125 7125
B W
B W
BW
T P
O S
T
T P
O S
T
T P
O S
T
T
BWT POST
R R T I E
BENCH MARK BH3
7126.8
CONC
BENCH MARK
7128.390
ADOT BC "7124.91"
STONE
WOOD
STONE
STONE
S T
O N
E
20099
20100
7125 7125 7125 7125
W A T E R
W A T E R
W A T E R M
E T E R
.2
B H 4 4163
X
X
X
X
X
20201
20302
20303
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
E3
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 158+00 TO 187+00
EROSION CONTROL SHEET
MORMON LAKE ROAD
71257125
7125 7125 7125
7125 7125
T
W
ATER
IRRIGATION
W
ATER
IRRIGATION
W
ATER
W
ATER
IRRIGATION
W
ATER
IRRIGATION
VENT
4 IN
20139
20140
20168
P. C.
X
20183
20184
P. C.
X
20186
20187
20188 20189
20190
20196
P. C.
X
20308
20309
P. C.
X
20323
P. C.
X
.0
X
X
X .8
I
N C
M P
X
.3
.9
I
N C
M P
.1
I
N C
M
P12 IN CMP
7124.8
.1
T
X
T
F
IR
E P L
A C
E
T
T
W A T E R F
A U
C E T
T
V E N T
T
STONE LANDSCAPING
G A S L
IG
H T
E V
E
G A S L
IG
H T
0 2
0 2
20137
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
E4
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 187+00 TO 215+00
57125
I
N C
M P
.6
BW
I
N S
T E
E L P I P
E U
P I
N
.9
I
N C
M P
.9
.9
F
IR
E R
IN
G
.1
X
I
N C
M P
.1
WOOD A
RCH W
AY
.3
WOOD RAIL
2 I N S
TEEL
I
N C
M P
T
.9
B H
T E L E
20157
71207120
71257125
.2
.3
I
N C
M P
.4
.3
I
N C
M P
.7
I
N C
M P
.6
T
TE
LE
OLD ROAD BED
T2
71207120
7125 7125
712571257125
STATE PROJECT
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
E5
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 215+00 TO 243+00
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
5 7140 7145
BW
T T
.3
I
N C
M P
.5
I
N C
M P
.9
.1
T T
P T
.3
P T
.3
71407145
7155 7155
E R
O S I O
N
.7
.7
I
N C
M P
.8
IN
C
M P
.7
.7
IN
C
M P
.1
.5
I
N C
M P
I
N C
M P
.9
.5T T
.1
T
7155 7155
E6
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 243+00 TO 270+00
E7
STATIONS 270+00 TO 298+00
PLAN SHEET
MORMON LAKE ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATE PROJECT
P
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
5 7135 7135
7145 7145
7145 714
5 7150
T
.2
T
T
T
I
N C
M P
.0
.7
T
T
.7
.7
T
.8
IN
C
M P
.9
IN
C
M P
.7
.7
IN
C
M P
.2
I
N C
M P
.8 F
T H I G
H
7145 7145 7145
7145 7145
.7
IN
C
M P
.5
T
T
T
.5
.6 F
T H
IG
H
.0
B H
I
N C
M P
.7
T
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
7160 7165
.5
I
N C
M P
.7
T
LARGE STONES
T
.0
.0
I
N C
M P
T
IN
C
M P
.3
.1
B H
.9
7172.3
18 IN CMP SILTED
7173.4
T
X T
E L E
E8
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 298+00 TO 327+00
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r in .j e s s e e
NUMBER
SHEET
AZ
Mormon Lake
AZ FLAP 237(1)
71707170
T
.6
B W
.7
I
N C
M P
T
T
7150 7150
7155 7155
W A
T E
R
W A
T E
R
T
X
X
X
X
X
X
T
X
X
X
X 2 2
X
X
T
X
X
X
X
T
X
X
X V
A U
L T
T
X
T
X
X
X
X
X 3 3
X
O/H APPROX 18'
E9
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATIONS 327+00 TO 355+00
EROSION CONTROL
A
M N A
Z a z R o a d w a y C
A D
D S h e e ts E E r o s io n P P .d
U s e r e r…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.