ATSSI II Services

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
FA8224-19-RFI-ATSSI(II)
Agency
Air Force Sustainment Center Air Force Materiel Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541512 Computer Systems Design Services
PSC
R401 Support- Professional: Personal Care (Non-Medical)
Place of performance
Hill AFB Hill Afb Ut 84056 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Air Force Sustainment Center seeks to award an indefinite-delivery, indefinite-quantity contract to provide automated test system sustainment services to the 309th Maintenance Wing at Hill Air Force Base. The services include test program set development and maintenance, engineering support, hardware and software maintenance, and coordination with original equipment manufacturers. Respondents are to demonstrate experience with test program sets, documentation, configuration control, organizational conflicts of interest, and failure analysis and repair. The evaluation will consider technical capability, past performance, and price. Responses to capability questions are due by specified dates.

There is no set-aside designated for this pre-solicitation notice. The NAICS code is 541512 and PSC code D308. The incumbent contractor is CACI, Inc. under the previous ATSSI I contract. The contract value is estimated between $350-500 million over a five year base period and one six-month option period. Task orders will be of a fixed-price nature and average $4-5 million in value annually.

Notice text

7 versions

Update #7 · Latest ·

1 May 2020: INDUSTRY DAY Attendees List Posted - No response required.
     The actual sign in sheet is available with redeactions along with a typed list of attendees.

10 March 2020: INDUSTRAY DAY Q&As Posted - Please submit any additional questions by March 24, 2020 at 3:00 p.m. MDT. 

DRAFT RFP UPDATED: The estimated release of the Draft Request for Proposals (RFP) is 20 March 2020.  This date is subject to change.

28 October 2019: INDUSTRY DAY UPDATE 

Information for the ATSSI Industry Day has been attached to this FBO posting including the Industry Day Itinerary, Industry Day presentation charts, and a map to the building.

One on one meetings are limited to 30 minutes. Please come with technical questions from the draft PWS as opposed to a company history or capability presentation.

For the Industry Day tour please wear comfortable, closed toed shoes. There will be some walking between buildings so dress appropriately. No food or drink will be allowed on the tour.

INDUSTRY DAY NOTIFICATION
Industry Day will be held on October 30-31, 2019. 

The tentative schedule is as follows:

30 Oct 19
AM: Introduction, Site Visit, and Q&A Session
PM: One-on-Ones

31 Oct 19
AM: One-on-Ones


Industry Day participants are capped at two (2) individuals per company.  Please provide the names (first and last) of individuals attending and where they are traveling from.  The Government will try to reserve the first day of One-on-Ones for companies that are flying in for the Industry Day.  If individuals need Base Access, please provide their drivers license number and state it was issued in. 
To ensure a One-on-One session is allotted for you, please identify in your response, your desire for a session.

Maps and Instructions will be provided at a later date.

Responses need to be submitted by October 15, 2019 at 8:00 a.m. (MT).
If you do not receive an email confirming receipt of your response by 3:00 p.m. (MT) on October 15, 2019, please contact us by phone no later than October 16, 2019 or your company will not be included as attending for the Industry Day.

___________________________________________________________________


A PWS has been added as well as Questions.  Please provide your responses NLT 3 October 2019 at 12:00 PM MDT.
An Industry Day is planned for the end of October and more information will be posted at a later date.

UPDATED QUESTIONS: (The government is seeking more clarity to the questions below).

1. Section 3.6.4.1 in the Draft PWS refers to an "OCI Mitigation Plan". How would your company comply with this requirement? This example highlights the Government's concern. If Company X is awarded the ATSSI 2 Contract, they will be in a position to research, identify requirements, and suggest solutions to the Government. If Company X develops test equipment that can fulfill the Government's requirements, the perceived OCI would occur, particularly if Company X identifies their own solutions to the problem. Company Y, who offers competitive products to Company X, would then perceive an unfair advantage to Company X in influencing the Government's decisions. Additionally, if Company Y's solution were selected, Company X would be in a position to have access to proprietary information from Company X.

a. The two issues that need to be addressed in an answer is:
i. How would you mitigate the first situation's perceived OCI?
ii. How would you mitigate the second situation's OCI to protect proprietary data?

2. Subcontracting plan: As the ATSSI Prime, there will be many instances of subcontracting work to other companies. How would your company protect the Government from unfair and/or excessive pass-through costs? See Section 3.6.4.2 of the Draft PWS. 

Please send responses to the POC's listed below.

 END OF UPDATE_______________________________________________________ 

•1.   
The Government is seeking potential sources to support a follow-on contract for its AUTOMATED TEST SYSTEM SUSTAINMENT INITIATIVE (ATSSI).

BACKGROUND
The 309 Maintenance Wing at Hill AFB (309 MXW) has a large volume of Automated Test Systems (ATS) that support end items from several different Original Equipment Manufacturers (OEMs), incorporate ancillary equipment from various vendors in the build/design, and require coordination with multiple OEMs/vendors when such systems are modified, repaired, or replaced. Many of these systems are unique to 309 MXW and as such, have no commercial equivalent.

309 MXW is facing operation, maintenance, performance, and infrastructure support issues for a growing number of computer-based test stations. Many of these systems are obsolete, duplicative, do not properly interface with Units Under Test (UUT), require unique/costly repair solutions, and/or require specialized sustainment in order to remain operable. 309 MXW established the original ATSSI contract to integrate, update, and consolidate ATS, test fixtures, TPS, database repositories, analytical software tools, and network infrastructures.

SCOPE
The follow-on ATSSI program is referred to as ATSSI II. Under ATSSI II the contractor shall serve as a complete ATS integrator and be fully capable of supporting design, manufacture, validation/verification, delivery, installation, drafting, Technical Order (TO) changes/updates, software, hardware, OEM coordination, System Program Office (SPO) coordination, test program sets, trouble shooting, government data rights concerns, and any other requirements identified throughout the pre-solicitation phase for this program.
A draft PWS with additional information will be posted at a later date.
Action
Please review and respond to the RFI questions below. Your responses are a critical part of the market research process and will aid the Government in determining industry capability and acquisition strategy.

RFI QUESTIONS
1. Please provide your Company Name, Cage Code and size under NAICS 541512
2. Please identify any recent & relevant DoD/commercial contracts

Capability Survey
1. Describe your company's history with the development & implementation of Test Program Sets (TPSs) for the DoD Standard Families of Testers.

2. Describe your company's experience with developing and implementing documentation for Test Program Sets for (ATS) utilized by the USAF to include standards, format types, and stakeholders involved. Provide examples.

3. Describe your company's experience with developing engineering drawings and submitting them to USAF document repositories.

4. What are your company's configuration control standards or protocols?

5. What is your company's experience working with organizational conflict of interest (OCI) issues? Has your company developed an OCI mitigation plan in the past?

6. What is your company's experience with government data rights requirements and clauses?

7. Does your company maintain close relationships with any major manufacturers or suppliers of widely-used ATS COTS components?

a. What is the basis of, or how formal are these relationships?
b. How long have these relationships been maintained?
c. Provide examples of specific relationships

8. Does your company have the resources available to quickly analyze ATS failures, perform root cause analysis, and repair or quickly subcontract the repair of typical ATS?

a. Provide two examples of situations where your company has provided this service

9. Provide a brief overview of your company's capability for developing, maintaining and repairing both software and hardware for ATS and all associated documentation updates.

10. This effort will require purchasing large value (multi-million dollar) equipment, materials and services. In many instances, payment will take months after invoicing. Describe your company's financial capacity to make these purchases and wait until payment is made by the USAF. Progress payments or government financing is not available at this time.

11. Under ATSSI II the contractor will be required to negotiate Task Order/Delivery Order pricing with the Government. Describe your company's experience with and capability to rapidly develop cost proposals, submit cost and pricing data as applicable, and negotiate with the Government Contracting Officer IAW FAR Part 15 requirements.

Send responses/questions to the following individuals
Sarah Hatch, Contracting Officer sarah.hatch@us.af.mil, 801-777-8407
Bradley Conroy, Contract Specialist bradley.conroy@us.af.mil, 801-775-2381
Emily McCollaum, Contract Specialist emily.mccollaum.2@us.af.mil, 801-586-0647

Update #6 ·

10 March 2020: INDUSTRAY DAY Q&As Posted - Please submit any additional questions by March 24, 2020 at 3:00 p.m. MDT. 

DRAFT RFP UPDATED: The estimated release of the Draft Request for Proposals (RFP) is 20 March 2020.  This date is subject to change.

28 October 2019: INDUSTRY DAY UPDATE 

Information for the ATSSI Industry Day has been attached to this FBO posting including the Industry Day Itinerary, Industry Day presentation charts, and a map to the building.

One on one meetings are limited to 30 minutes. Please come with technical questions from the draft PWS as opposed to a company history or capability presentation.

For the Industry Day tour please wear comfortable, closed toed shoes. There will be some walking between buildings so dress appropriately. No food or drink will be allowed on the tour.

INDUSTRY DAY NOTIFICATION
Industry Day will be held on October 30-31, 2019. 

The tentative schedule is as follows:

30 Oct 19
AM: Introduction, Site Visit, and Q&A Session
PM: One-on-Ones

31 Oct 19
AM: One-on-Ones


Industry Day participants are capped at two (2) individuals per company.  Please provide the names (first and last) of individuals attending and where they are traveling from.  The Government will try to reserve the first day of One-on-Ones for companies that are flying in for the Industry Day.  If individuals need Base Access, please provide their drivers license number and state it was issued in. 
To ensure a One-on-One session is allotted for you, please identify in your response, your desire for a session.

Maps and Instructions will be provided at a later date.

Responses need to be submitted by October 15, 2019 at 8:00 a.m. (MT).
If you do not receive an email confirming receipt of your response by 3:00 p.m. (MT) on October 15, 2019, please contact us by phone no later than October 16, 2019 or your company will not be included as attending for the Industry Day.

___________________________________________________________________


A PWS has been added as well as Questions.  Please provide your responses NLT 3 October 2019 at 12:00 PM MDT.
An Industry Day is planned for the end of October and more information will be posted at a later date.

UPDATED QUESTIONS: (The government is seeking more clarity to the questions below).

1. Section 3.6.4.1 in the Draft PWS refers to an "OCI Mitigation Plan". How would your company comply with this requirement? This example highlights the Government's concern. If Company X is awarded the ATSSI 2 Contract, they will be in a position to research, identify requirements, and suggest solutions to the Government. If Company X develops test equipment that can fulfill the Government's requirements, the perceived OCI would occur, particularly if Company X identifies their own solutions to the problem. Company Y, who offers competitive products to Company X, would then perceive an unfair advantage to Company X in influencing the Government's decisions. Additionally, if Company Y's solution were selected, Company X would be in a position to have access to proprietary information from Company X.

a. The two issues that need to be addressed in an answer is:
i. How would you mitigate the first situation's perceived OCI?
ii. How would you mitigate the second situation's OCI to protect proprietary data?

2. Subcontracting plan: As the ATSSI Prime, there will be many instances of subcontracting work to other companies. How would your company protect the Government from unfair and/or excessive pass-through costs? See Section 3.6.4.2 of the Draft PWS. 

Please send responses to the POC's listed below.

 END OF UPDATE_______________________________________________________ 

•1.   
The Government is seeking potential sources to support a follow-on contract for its AUTOMATED TEST SYSTEM SUSTAINMENT INITIATIVE (ATSSI).

BACKGROUND
The 309 Maintenance Wing at Hill AFB (309 MXW) has a large volume of Automated Test Systems (ATS) that support end items from several different Original Equipment Manufacturers (OEMs), incorporate ancillary equipment from various vendors in the build/design, and require coordination with multiple OEMs/vendors when such systems are modified, repaired, or replaced. Many of these systems are unique to 309 MXW and as such, have no commercial equivalent.

309 MXW is facing operation, maintenance, performance, and infrastructure support issues for a growing number of computer-based test stations. Many of these systems are obsolete, duplicative, do not properly interface with Units Under Test (UUT), require unique/costly repair solutions, and/or require specialized sustainment in order to remain operable. 309 MXW established the original ATSSI contract to integrate, update, and consolidate ATS, test fixtures, TPS, database repositories, analytical software tools, and network infrastructures.

SCOPE
The follow-on ATSSI program is referred to as ATSSI II. Under ATSSI II the contractor shall serve as a complete ATS integrator and be fully capable of supporting design, manufacture, validation/verification, delivery, installation, drafting, Technical Order (TO) changes/updates, software, hardware, OEM coordination, System Program Office (SPO) coordination, test program sets, trouble shooting, government data rights concerns, and any other requirements identified throughout the pre-solicitation phase for this program.
A draft PWS with additional information will be posted at a later date.
Action
Please review and respond to the RFI questions below. Your responses are a critical part of the market research process and will aid the Government in determining industry capability and acquisition strategy.

RFI QUESTIONS
1. Please provide your Company Name, Cage Code and size under NAICS 541512
2. Please identify any recent & relevant DoD/commercial contracts

Capability Survey
1. Describe your company's history with the development & implementation of Test Program Sets (TPSs) for the DoD Standard Families of Testers.

2. Describe your company's experience with developing and implementing documentation for Test Program Sets for (ATS) utilized by the USAF to include standards, format types, and stakeholders involved. Provide examples.

3. Describe your company's experience with developing engineering drawings and submitting them to USAF document repositories.

4. What are your company's configuration control standards or protocols?

5. What is your company's experience working with organizational conflict of interest (OCI) issues? Has your company developed an OCI mitigation plan in the past?

6. What is your company's experience with government data rights requirements and clauses?

7. Does your company maintain close relationships with any major manufacturers or suppliers of widely-used ATS COTS components?

a. What is the basis of, or how formal are these relationships?
b. How long have these relationships been maintained?
c. Provide examples of specific relationships

8. Does your company have the resources available to quickly analyze ATS failures, perform root cause analysis, and repair or quickly subcontract the repair of typical ATS?

a. Provide two examples of situations where your company has provided this service

9. Provide a brief overview of your company's capability for developing, maintaining and repairing both software and hardware for ATS and all associated documentation updates.

10. This effort will require purchasing large value (multi-million dollar) equipment, materials and services. In many instances, payment will take months after invoicing. Describe your company's financial capacity to make these purchases and wait until payment is made by the USAF. Progress payments or government financing is not available at this time.

11. Under ATSSI II the contractor will be required to negotiate Task Order/Delivery Order pricing with the Government. Describe your company's experience with and capability to rapidly develop cost proposals, submit cost and pricing data as applicable, and negotiate with the Government Contracting Officer IAW FAR Part 15 requirements.

Send responses/questions to the following individuals
Sarah Hatch, Contracting Officer sarah.hatch@us.af.mil, 801-777-8407
Bradley Conroy, Contract Specialist bradley.conroy@us.af.mil, 801-775-2381
Emily McCollaum, Contract Specialist emily.mccollaum.2@us.af.mil, 801-586-0647

Update #5 ·

28 October 2019: INDUSTRY DAY UPDATE 

Information for the ATSSI Industry Day has been attached to this FBO posting including the Industry Day Itinerary, Industry Day presentation charts, and a map to the building.

One on one meetings are limited to 30 minutes. Please come with technical questions from the draft PWS as opposed to a company history or capability presentation.

For the Industry Day tour please wear comfortable, closed toed shoes. There will be some walking between buildings so dress appropriately. No food or drink will be allowed on the tour.

INDUSTRY DAY NOTIFICATION
Industry Day will be held on October 30-31, 2019. 

The tentative schedule is as follows:

30 Oct 19
AM: Introduction, Site Visit, and Q&A Session
PM: One-on-Ones

31 Oct 19
AM: One-on-Ones


Industry Day participants are capped at two (2) individuals per company.  Please provide the names (first and last) of individuals attending and where they are traveling from.  The Government will try to reserve the first day of One-on-Ones for companies that are flying in for the Industry Day.  If individuals need Base Access, please provide their drivers license number and state it was issued in. 
To ensure a One-on-One session is allotted for you, please identify in your response, your desire for a session.

Maps and Instructions will be provided at a later date.

Responses need to be submitted by October 15, 2019 at 8:00 a.m. (MT).
If you do not receive an email confirming receipt of your response by 3:00 p.m. (MT) on October 15, 2019, please contact us by phone no later than October 16, 2019 or your company will not be included as attending for the Industry Day.

___________________________________________________________________


A PWS has been added as well as Questions.  Please provide your responses NLT 3 October 2019 at 12:00 PM MDT.
An Industry Day is planned for the end of October and more information will be posted at a later date.

UPDATED QUESTIONS: (The government is seeking more clarity to the questions below).

1. Section 3.6.4.1 in the Draft PWS refers to an "OCI Mitigation Plan". How would your company comply with this requirement? This example highlights the Government's concern. If Company X is awarded the ATSSI 2 Contract, they will be in a position to research, identify requirements, and suggest solutions to the Government. If Company X develops test equipment that can fulfill the Government's requirements, the perceived OCI would occur, particularly if Company X identifies their own solutions to the problem. Company Y, who offers competitive products to Company X, would then perceive an unfair advantage to Company X in influencing the Government's decisions. Additionally, if Company Y's solution were selected, Company X would be in a position to have access to proprietary information from Company X.

a. The two issues that need to be addressed in an answer is:
i. How would you mitigate the first situation's perceived OCI?
ii. How would you mitigate the second situation's OCI to protect proprietary data?

2. Subcontracting plan: As the ATSSI Prime, there will be many instances of subcontracting work to other companies. How would your company protect the Government from unfair and/or excessive pass-through costs? See Section 3.6.4.2 of the Draft PWS. 

Please send responses to the POC's listed below.

 END OF UPDATE_______________________________________________________ 

•1.   
The Government is seeking potential sources to support a follow-on contract for its AUTOMATED TEST SYSTEM SUSTAINMENT INITIATIVE (ATSSI).

BACKGROUND
The 309 Maintenance Wing at Hill AFB (309 MXW) has a large volume of Automated Test Systems (ATS) that support end items from several different Original Equipment Manufacturers (OEMs), incorporate ancillary equipment from various vendors in the build/design, and require coordination with multiple OEMs/vendors when such systems are modified, repaired, or replaced. Many of these systems are unique to 309 MXW and as such, have no commercial equivalent.

309 MXW is facing operation, maintenance, performance, and infrastructure support issues for a growing number of computer-based test stations. Many of these systems are obsolete, duplicative, do not properly interface with Units Under Test (UUT), require unique/costly repair solutions, and/or require specialized sustainment in order to remain operable. 309 MXW established the original ATSSI contract to integrate, update, and consolidate ATS, test fixtures, TPS, database repositories, analytical software tools, and network infrastructures.

SCOPE
The follow-on ATSSI program is referred to as ATSSI II. Under ATSSI II the contractor shall serve as a complete ATS integrator and be fully capable of supporting design, manufacture, validation/verification, delivery, installation, drafting, Technical Order (TO) changes/updates, software, hardware, OEM coordination, System Program Office (SPO) coordination, test program sets, trouble shooting, government data rights concerns, and any other requirements identified throughout the pre-solicitation phase for this program.
A draft PWS with additional information will be posted at a later date.
Action
Please review and respond to the RFI questions below. Your responses are a critical part of the market research process and will aid the Government in determining industry capability and acquisition strategy.

RFI QUESTIONS
1. Please provide your Company Name, Cage Code and size under NAICS 541512
2. Please identify any recent & relevant DoD/commercial contracts

Capability Survey
1. Describe your company's history with the development & implementation of Test Program Sets (TPSs) for the DoD Standard Families of Testers.

2. Describe your company's experience with developing and implementing documentation for Test Program Sets for (ATS) utilized by the USAF to include standards, format types, and stakeholders involved. Provide examples.

3. Describe your company's experience with developing engineering drawings and submitting them to USAF document repositories.

4. What are your company's configuration control standards or protocols?

5. What is your company's experience working with organizational conflict of interest (OCI) issues? Has your company developed an OCI mitigation plan in the past?

6. What is your company's experience with government data rights requirements and clauses?

7. Does your company maintain close relationships with any major manufacturers or suppliers of widely-used ATS COTS components?

a. What is the basis of, or how formal are these relationships?
b. How long have these relationships been maintained?
c. Provide examples of specific relationships

8. Does your company have the resources available to quickly analyze ATS failures, perform root cause analysis, and repair or quickly subcontract the repair of typical ATS?

a. Provide two examples of situations where your company has provided this service

9. Provide a brief overview of your company's capability for developing, maintaining and repairing both software and hardware for ATS and all associated documentation updates.

10. This effort will require purchasing large value (multi-million dollar) equipment, materials and services. In many instances, payment will take months after invoicing. Describe your company's financial capacity to make these purchases and wait until payment is made by the USAF. Progress payments or government financing is not available at this time.

11. Under ATSSI II the contractor will be required to negotiate Task Order/Delivery Order pricing with the Government. Describe your company's experience with and capability to rapidly develop cost proposals, submit cost and pricing data as applicable, and negotiate with the Government Contracting Officer IAW FAR Part 15 requirements.

Send responses/questions to the following individuals
Sarah Hatch, Contracting Officer sarah.hatch@us.af.mil, 801-777-8407
Bradley Conroy, Contract Specialist bradley.conroy@us.af.mil, 801-775-2381
Emily McCollaum, Contract Specialist emily.mccollaum.2@us.af.mil, 801-586-0647

Update #4 ·

Questions submitted on October 8, 2019 are attached with answers.

Update #3 ·

INDUSTRY DAY NOTIFICATION
Industry Day will be held on October 30-31, 2019. 

The tentative schedule is as follows:

30 Oct 19
AM: Introduction, Site Visit, and Q&A Session
PM: One-on-Ones

31 Oct 19
AM: One-on-Ones


Industry Day participants are capped at two (2) individuals per company.  Please provide the names (first and last) of individuals attending and where they are traveling from.  The Government will try to reserve the first day of One-on-Ones for companies that are flying in for the Industry Day.  If individuals need Base Access, please provide their drivers license number and state it was issued in. 
To ensure a One-on-One session is allotted for you, please identify in your response, your desire for a session.

Maps and Instructions will be provided at a later date.

Responses need to be submitted by October 15, 2019 at 8:00 a.m. (MT).
If you do not receive an email confirming receipt of your response by 3:00 p.m. (MT) on October 15, 2019, please contact us by phone no later than October 16, 2019 or your company will not be included as attending for the Industry Day.

___________________________________________________________________


A PWS has been added as well as Questions.  Please provide your responses NLT 3 October 2019 at 12:00 PM MDT.
An Industry Day is planned for the end of October and more information will be posted at a later date.

UPDATED QUESTIONS: (The government is seeking more clarity to the questions below).

1. Section 3.6.4.1 in the Draft PWS refers to an "OCI Mitigation Plan". How would your company comply with this requirement? This example highlights the Government's concern. If Company X is awarded the ATSSI 2 Contract, they will be in a position to research, identify requirements, and suggest solutions to the Government. If Company X develops test equipment that can fulfill the Government's requirements, the perceived OCI would occur, particularly if Company X identifies their own solutions to the problem. Company Y, who offers competitive products to Company X, would then perceive an unfair advantage to Company X in influencing the Government's decisions. Additionally, if Company Y's solution were selected, Company X would be in a position to have access to proprietary information from Company X.

a. The two issues that need to be addressed in an answer is:
i. How would you mitigate the first situation's perceived OCI?
ii. How would you mitigate the second situation's OCI to protect proprietary data?

2. Subcontracting plan: As the ATSSI Prime, there will be many instances of subcontracting work to other companies. How would your company protect the Government from unfair and/or excessive pass-through costs? See Section 3.6.4.2 of the Draft PWS. 

Please send responses to the POC's listed below.

 END OF UPDATE_______________________________________________________ 

•1.   
The Government is seeking potential sources to support a follow-on contract for its AUTOMATED TEST SYSTEM SUSTAINMENT INITIATIVE (ATSSI).

BACKGROUND
The 309 Maintenance Wing at Hill AFB (309 MXW) has a large volume of Automated Test Systems (ATS) that support end items from several different Original Equipment Manufacturers (OEMs), incorporate ancillary equipment from various vendors in the build/design, and require coordination with multiple OEMs/vendors when such systems are modified, repaired, or replaced. Many of these systems are unique to 309 MXW and as such, have no commercial equivalent.

309 MXW is facing operation, maintenance, performance, and infrastructure support issues for a growing number of computer-based test stations. Many of these systems are obsolete, duplicative, do not properly interface with Units Under Test (UUT), require unique/costly repair solutions, and/or require specialized sustainment in order to remain operable. 309 MXW established the original ATSSI contract to integrate, update, and consolidate ATS, test fixtures, TPS, database repositories, analytical software tools, and network infrastructures.

SCOPE
The follow-on ATSSI program is referred to as ATSSI II. Under ATSSI II the contractor shall serve as a complete ATS integrator and be fully capable of supporting design, manufacture, validation/verification, delivery, installation, drafting, Technical Order (TO) changes/updates, software, hardware, OEM coordination, System Program Office (SPO) coordination, test program sets, trouble shooting, government data rights concerns, and any other requirements identified throughout the pre-solicitation phase for this program.
A draft PWS with additional information will be posted at a later date.
Action
Please review and respond to the RFI questions below. Your responses are a critical part of the market research process and will aid the Government in determining industry capability and acquisition strategy.

RFI QUESTIONS
1. Please provide your Company Name, Cage Code and size under NAICS 541512
2. Please identify any recent & relevant DoD/commercial contracts

Capability Survey
1. Describe your company's history with the development & implementation of Test Program Sets (TPSs) for the DoD Standard Families of Testers.

2. Describe your company's experience with developing and implementing documentation for Test Program Sets for (ATS) utilized by the USAF to include standards, format types, and stakeholders involved. Provide examples.

3. Describe your company's experience with developing engineering drawings and submitting them to USAF document repositories.

4. What are your company's configuration control standards or protocols?

5. What is your company's experience working with organizational conflict of interest (OCI) issues? Has your company developed an OCI mitigation plan in the past?

6. What is your company's experience with government data rights requirements and clauses?

7. Does your company maintain close relationships with any major manufacturers or suppliers of widely-used ATS COTS components?

a. What is the basis of, or how formal are these relationships?
b. How long have these relationships been maintained?
c. Provide examples of specific relationships

8. Does your company have the resources available to quickly analyze ATS failures, perform root cause analysis, and repair or quickly subcontract the repair of typical ATS?

a. Provide two examples of situations where your company has provided this service

9. Provide a brief overview of your company's capability for developing, maintaining and repairing both software and hardware for ATS and all associated documentation updates.

10. This effort will require purchasing large value (multi-million dollar) equipment, materials and services. In many instances, payment will take months after invoicing. Describe your company's financial capacity to make these purchases and wait until payment is made by the USAF. Progress payments or government financing is not available at this time.

11. Under ATSSI II the contractor will be required to negotiate Task Order/Delivery Order pricing with the Government. Describe your company's experience with and capability to rapidly develop cost proposals, submit cost and pricing data as applicable, and negotiate with the Government Contracting Officer IAW FAR Part 15 requirements.

Send responses/questions to the following individuals
Sarah Hatch, Contracting Officer sarah.hatch@us.af.mil, 801-777-8407
Bradley Conroy, Contract Specialist bradley.conroy@us.af.mil, 801-775-2381
Emily McCollaum, Contract Specialist emily.mccollaum.2@us.af.mil, 801-586-0647

Update #2 ·

A PWS has been added as well as Questions.  Please provide your responses NLT 3 October 2019 at 12:00 PM MDT.
An Industry Day is planned for the end of October and more information will be posted at a later date.

UPDATED QUESTIONS: (The government is seeking more clarity to the questions below).

1. Section 3.6.4.1 in the Draft PWS refers to an "OCI Mitigation Plan". How would your company comply with this requirement? This example highlights the Government's concern. If Company X is awarded the ATSSI 2 Contract, they will be in a position to research, identify requirements, and suggest solutions to the Government. If Company X develops test equipment that can fulfill the Government's requirements, the perceived OCI would occur, particularly if Company X identifies their own solutions to the problem. Company Y, who offers competitive products to Company X, would then perceive an unfair advantage to Company X in influencing the Government's decisions. Additionally, if Company Y's solution were selected, Company X would be in a position to have access to proprietary information from Company X.

a. The two issues that need to be addressed in an answer is:
i. How would you mitigate the first situation's perceived OCI?
ii. How would you mitigate the second situation's OCI to protect proprietary data?

2. Subcontracting plan: As the ATSSI Prime, there will be many instances of subcontracting work to other companies. How would your company protect the Government from unfair and/or excessive pass-through costs? See Section 3.6.4.2 of the Draft PWS. 

Please send responses to the POC's listed below.

 END OF UPDATE_______________________________________________________ 

•1.   
The Government is seeking potential sources to support a follow-on contract for its AUTOMATED TEST SYSTEM SUSTAINMENT INITIATIVE (ATSSI).

BACKGROUND
The 309 Maintenance Wing at Hill AFB (309 MXW) has a large volume of Automated Test Systems (ATS) that support end items from several different Original Equipment Manufacturers (OEMs), incorporate ancillary equipment from various vendors in the build/design, and require coordination with multiple OEMs/vendors when such systems are modified, repaired, or replaced. Many of these systems are unique to 309 MXW and as such, have no commercial equivalent.

309 MXW is facing operation, maintenance, performance, and infrastructure support issues for a growing number of computer-based test stations. Many of these systems are obsolete, duplicative, do not properly interface with Units Under Test (UUT), require unique/costly repair solutions, and/or require specialized sustainment in order to remain operable. 309 MXW established the original ATSSI contract to integrate, update, and consolidate ATS, test fixtures, TPS, database repositories, analytical software tools, and network infrastructures.

SCOPE
The follow-on ATSSI program is referred to as ATSSI II. Under ATSSI II the contractor shall serve as a complete ATS integrator and be fully capable of supporting design, manufacture, validation/verification, delivery, installation, drafting, Technical Order (TO) changes/updates, software, hardware, OEM coordination, System Program Office (SPO) coordination, test program sets, trouble shooting, government data rights concerns, and any other requirements identified throughout the pre-solicitation phase for this program.
A draft PWS with additional information will be posted at a later date.
Action
Please review and respond to the RFI questions below. Your responses are a critical part of the market research process and will aid the Government in determining industry capability and acquisition strategy.

RFI QUESTIONS
1. Please provide your Company Name, Cage Code and size under NAICS 541512
2. Please identify any recent & relevant DoD/commercial contracts

Capability Survey
1. Describe your company's history with the development & implementation of Test Program Sets (TPSs) for the DoD Standard Families of Testers.

2. Describe your company's experience with developing and implementing documentation for Test Program Sets for (ATS) utilized by the USAF to include standards, format types, and stakeholders involved. Provide examples.

3. Describe your company's experience with developing engineering drawings and submitting them to USAF document repositories.

4. What are your company's configuration control standards or protocols?

5. What is your company's experience working with organizational conflict of interest (OCI) issues? Has your company developed an OCI mitigation plan in the past?

6. What is your company's experience with government data rights requirements and clauses?

7. Does your company maintain close relationships with any major manufacturers or suppliers of widely-used ATS COTS components?

a. What is the basis of, or how formal are these relationships?
b. How long have these relationships been maintained?
c. Provide examples of specific relationships

8. Does your company have the resources available to quickly analyze ATS failures, perform root cause analysis, and repair or quickly subcontract the repair of typical ATS?

a. Provide two examples of situations where your company has provided this service

9. Provide a brief overview of your company's capability for developing, maintaining and repairing both software and hardware for ATS and all associated documentation updates.

10. This effort will require purchasing large value (multi-million dollar) equipment, materials and services. In many instances, payment will take months after invoicing. Describe your company's financial capacity to make these purchases and wait until payment is made by the USAF. Progress payments or government financing is not available at this time.

11. Under ATSSI II the contractor will be required to negotiate Task Order/Delivery Order pricing with the Government. Describe your company's experience with and capability to rapidly develop cost proposals, submit cost and pricing data as applicable, and negotiate with the Government Contracting Officer IAW FAR Part 15 requirements.

Send responses/questions to the following individuals
Sarah Hatch, Contracting Officer sarah.hatch@us.af.mil, 801-777-8407
Bradley Conroy, Contract Specialist bradley.conroy@us.af.mil, 801-775-2381
Emily McCollaum, Contract Specialist emily.mccollaum.2@us.af.mil, 801-586-0647

Update #1 ·

A PWS will be posted at a later date.
Information for an Industry Day will be posted at a later date.


The Government is seeking potential sources to support a follow-on contract for its AUTOMATED TEST SYSTEM SUSTAINMENT INITIATIVE (ATSSI).

BACKGROUND
The 309 Maintenance Wing at Hill AFB (309 MXW) has a large volume of Automated Test Systems (ATS) that support end items from several different Original Equipment Manufacturers (OEMs), incorporate ancillary equipment from various vendors in the build/design, and require coordination with multiple OEMs/vendors when such systems are modified, repaired, or replaced. Many of these systems are unique to 309 MXW and as such, have no commercial equivalent.

309 MXW is facing operation, maintenance, performance, and infrastructure support issues for a growing number of computer-based test stations. Many of these systems are obsolete, duplicative, do not properly interface with Units Under Test (UUT), require unique/costly repair solutions, and/or require specialized sustainment in order to remain operable. 309 MXW established the original ATSSI contract to integrate, update, and consolidate ATS, test fixtures, TPS, database repositories, analytical software tools, and network infrastructures.

SCOPE
The follow-on ATSSI program is referred to as ATSSI II. Under ATSSI II the contractor shall serve as a complete ATS integrator and be fully capable of supporting design, manufacture, validation/verification, delivery, installation, drafting, Technical Order (TO) changes/updates, software, hardware, OEM coordination, System Program Office (SPO) coordination, test program sets, trouble shooting, government data rights concerns, and any other requirements identified throughout the pre-solicitation phase for this program.
A draft PWS with additional information will be posted at a later date.
Action
Please review and respond to the RFI questions below. Your responses are a critical part of the market research process and will aid the Government in determining industry capability and acquisition strategy.

RFI QUESTIONS
1. Please provide your Company Name, Cage Code and size under NAICS 541512
2. Please identify any recent & relevant DoD/commercial contracts

Capability Survey
1. Describe your company's history with the development & implementation of Test Program Sets (TPSs) for the DoD Standard Families of Testers.

2. Describe your company's experience with developing and implementing documentation for Test Program Sets for (ATS) utilized by the USAF to include standards, format types, and stakeholders involved. Provide examples.

3. Describe your company's experience with developing engineering drawings and submitting them to USAF document repositories.

4. What are your company's configuration control standards or protocols?

5. What is your company's experience working with organizational conflict of interest (OCI) issues? Has your company developed an OCI mitigation plan in the past?

6. What is your company's experience with government data rights requirements and clauses?

7. Does your company maintain close relationships with any major manufacturers or suppliers of widely-used ATS COTS components?

a. What is the basis of, or how formal are these relationships?
b. How long have these relationships been maintained?
c. Provide examples of specific relationships

8. Does your company have the resources available to quickly analyze ATS failures, perform root cause analysis, and repair or quickly subcontract the repair of typical ATS?

a. Provide two examples of situations where your company has provided this service

9. Provide a brief overview of your company's capability for developing, maintaining and repairing both software and hardware for ATS and all associated documentation updates.

10. This effort will require purchasing large value (multi-million dollar) equipment, materials and services. In many instances, payment will take months after invoicing. Describe your company's financial capacity to make these purchases and wait until payment is made by the USAF. Progress payments or government financing is not available at this time.

11. Under ATSSI II the contractor will be required to negotiate Task Order/Delivery Order pricing with the Government. Describe your company's experience with and capability to rapidly develop cost proposals, submit cost and pricing data as applicable, and negotiate with the Government Contracting Officer IAW FAR Part 15 requirements.

Send responses/questions to the following individuals
Sarah Hatch, Contracting Officer sarah.hatch@us.af.mil, 801-777-8407
Bradley Conroy, Contract Specialist brad.conroy@us.af.mil, 801-775-2381
Emily McCollaum, Contract Specialist emily.mccollaum.2@us.af.mil, 801-586-0647

Attachments

Files attached to this notice, newest first
File Type Posted
Industry Day Attendees List.pdf PDF
Industry Day Sign-In Sheet - 30 Oct 19_Redacted.pdf PDF
ATSSI_II_Industry_Day_QandAs.pdf PDF
ATSSI_II_Industry_Day_Charts_Final.ppt PPT presentation
Industry_Day_Itinerary_Final.doc DOC document
South_Gate_to_Bldg_849.pptx PPTX presentation
Q&A_-_16_Oct_19.docx DOCX document
ATSSI_2_Draft_PWS_Rev_11Sep19.docx DOCX document
ATSSI_II_Sources_Sought__RFI_Questions.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Automated Test System Sustainment Initiative II (ATSSI II) Award Award Notice
Automated Test System Sustainment Initiative II (ATSSI II) Latest solicitation Solicitation
ATSSI II Services Pre-Solicitation
ATSSI II Services This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity