ASHE 15-1063 Sustain HVAC System, Bldg 1173, Area F, Aviano AB, Italy & ASHE 15-1065 Sustain HVAC Fac. 1472, Area F, AViano AB, Italy
Award Notice Posted
- Solicitation number
- FA5682-16-R-0034
- Agency
-
Air Forces Europe and Africa
Air Force, Department of Defense
- Awarded
- to Balsamini Impianti SRL
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA568216C0052 Federal contract award
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Not on record
- Place of performance
- Aviano Air Base, Italy Aviano , 33081 Italy
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
AMENDMENT 0001 TO THE SOLICITATION HAS BEEN POSTED. CLSOING DATE FOR RECEIPT OF OFFERS HAS BEEN CHANGED TO 26 SEP 2016 BY 02:00PM.
Update #3 ·
AN AMENDMENT WILL BE ISSUED SHORTLY TO REPLACE SOLICITATION TECHNICAL SPECIFICATIONS, CONSTRUCTION COST ESTIMATE BREAKDOWN FOR BOTH PROJECTS ASHE 15-1063 & ASHE 15-1065 AND CHANGE THE DATE FOR RECEIPT OF OFFERS.
Update #2 ·
THIS WORK WILL BE PERFORMED ENTIRELY IN ITALY AND THEREFORE IN ACCORDANCE WITH DFARS 225.1103(3) PROVISION 252.225-7042 AS LISTED IN PROVISION 252.204-7007 ALTERNATE A SHALL APPLY.
SOA FOR PROJECT WORK:
CATEGORY: OG11 and/or OS28 - INTERESTED VENDORS SHALL BE IN POSSESSION OF A CURRENT SOA CERTIFICATION FOR THE CITED CATEGORY.
CLASSIFICATION - ADEQUATE TO COVER VENDOR'S PROPOSED AMOUNT FOR PROJECT PERFORMANCE.
MAGNITUDE OF CONSTRUCTION IN ACCORDANCE WITH FAR 36.204:
BETWEEN $100,000 AND $250,000.
SCOPE OF PROJECT
ASHE 15-1063 SUSTAIN HVAC SYSTEM, BLDG 1173, AREA F, AVIANO AB, ITALY DATED JUNE 2016
& ASHE 15-1065 SUSTAIN HVAC SYSTEM, FAC. 1472, AREA F, AVIANO AB, ITALY DATED JULY 2016
A DETAILED SUMMARY OF THE PRINCIPAL ITEMS OF WORK CAN BE OBTAINED BY CONSULTING THE PROJECT TECHNICAL SPECIFICATIONS.
NOTE: ALL QUANTITIES INDICATED IN THE PROJECT DOCUMENTS FURNISHED BY THE GOVERNMENT, INCLUDING THE CONSTRUCTION COST BREAKDOWN, ARE ESTIMATES AND THE GOVERNMENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE CONTRACT SHALL REQUIRE A COMPLETED PROJECT ON A LUMP SUM BASIS. IT IS THE RESPONSIBILITY OF THE OFFEROR TO CALCULATE, FORESEE AND PERFORM ALL QUANTITIES OF WORK MANIFESTLY NECESSARY TO DELIVER A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
SITE VISIT:
AN ORGANIZED SITE VISIT IS SCHEDULED AT THE DATE AND MEETING POINT SPECIFIED IN THE SOLICITATION. NORMALLY PARTICIPANTS WILL MEET IN THE PARKING AREA OF LVIS GATE (CONTRACTOR GATE) AREA F FLIGHTLINE, AVIANO AIR BASE.
ADDRESS: VIA LOCALITA' TORNIELLI 18, ROVEREDO IN PIANO, PORDENONE.
NOTICE TO OFFERORS:
IT IS THE OFFEROR'S RESPONSIBILITY TO ENSURE THAT THE OFFER REACHES THE OFFICE DESIGNATED FOR RECEIPT OF PROPOSALS WITHIN THE TIME ESTABLISHED IN THE SOLICITATION, AS AMENDED.
IF YOU ELECT TO USE THE HOST NATION POSTAL SERVICE BE ADVISED THAT THE LOCAL POST OFFICE DOES NOT HAND DELIVER MAIL TO THE OFFICE DESIGNATED TO RECEIVE THE PROPOSALS IDENTIFIED IN THE STANDARD FORM 1442, BLOCK No. 7.
IMPORTANT: INTERESTED FIRMS SHOULD USE THE "ADD ME TO THE WATCH LIST" WEB SITE FEATURE TO BE AUTOMATICALLY NOTIFIED OF ALL CHANGES TO THIS SOLICITATION
Update #1 ·
THIS WORK WILL BE PERFORMED ENTIRELY IN ITALY AND THEREFORE IN ACCORDANCE WITH DFARS 225.1103(3) PROVISION 252.225-7042 AS LISTED IN PROVISION 252.204-7007 ALTERNATE A SHALL APPLY.
SOA FOR PROJECT WORK:
CATEGORY: OG11 and/or OS28 - INTERESTED VENDORS SHALL BE IN POSSESSION OF A CURRENT SOA CERTIFICATION FOR THE CITED CATEGORY.
CLASSIFICATION - ADEQUATE TO COVER VENDOR'S PROPOSED AMOUNT FOR PROJECT PERFORMANCE.
MAGNITUDE OF CONSTRUCTION IN ACCORDANCE WITH FAR 36.204:
BETWEEN $100,000 AND $250,000.
SCOPE OF PROJECT
ASHE 15-1063 SUSTAIN HVAC SYSTEM, BLDG 1173, AREA F, AVIANO AB, ITALY DATED JUNE 2016
& ASHE 15-1065 SUSTAIN HVAC SYSTEM, FAC. 1472, AREA F, AVIANO AB, ITALY DATED JULY 2016
A DETAILED SUMMARY OF THE PRINCIPAL ITEMS OF WORK CAN BE OBTAINED BY CONSULTING THE PROJECT TECHNICAL SPECIFICATIONS.
NOTE: ALL QUANTITIES INDICATED IN THE PROJECT DOCUMENTS FURNISHED BY THE GOVERNMENT, INCLUDING THE CONSTRUCTION COST BREAKDOWN, ARE ESTIMATES AND THE GOVERNMENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE CONTRACT SHALL REQUIRE A COMPLETED PROJECT ON A LUMP SUM BASIS. IT IS THE RESPONSIBILITY OF THE OFFEROR TO CALCULATE, FORESEE AND PERFORM ALL QUANTITIES OF WORK MANIFESTLY NECESSARY TO DELIVER A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
SITE VISIT:
AN ORGANIZED SITE VISIT WILL BE SCHEDULED AT THE DATE AND MEETING POINT SPECIFIED IN THE SOLICITATION. NORMALLY PARTICIPANTS WILL MEET IN THE PARKING AREA OF LVIS GATE (CONTRACTOR GATE) AREA F FLIGHTLINE, AVIANO AIR BASE.
ADDRESS: VIA LOCALITA' TORNIELLI 18, ROVEREDO IN PIANO, PORDENONE.
NOTICE TO OFFERORS:
IT IS THE OFFEROR'S RESPONSIBILITY TO ENSURE THAT THE OFFER REACHES THE OFFICE DESIGNATED FOR RECEIPT OF PROPOSALS WITHIN THE TIME ESTABLISHED IN THE SOLICITATION, AS AMENDED.
IF YOU ELECT TO USE THE HOST NATION POSTAL SERVICE BE ADVISED THAT THE LOCAL POST OFFICE DOES NOT HAND DELIVER MAIL TO THE OFFICE DESIGNATED TO RECEIVE THE PROPOSALS IDENTIFIED IN THE STANDARD FORM 1442, BLOCK No. 7.
IMPORTANT: INTERESTED FIRMS SHOULD USE THE "ADD ME TO THE WATCH LIST" WEB SITE FEATURE TO BE AUTOMATICALLY NOTIFIED OF ALL CHANGES TO THIS SOLICITATION
TENTATIVE DATE FOR ISSUANCE OF SUBJECT SOLICITATION: AUGUST 2016.
Files
| File | Type | Posted |
|---|---|---|
| ASHE_151065_MATERIAL_APPROVAL_SUBMITTALS.pdf | ||
| ASHE_151063_MATERIAL_APPROVAL_SUBMITTALS.pdf | ||
| ASHE_15_1065_BLANK_Cost_Estimate_REVISION_1.xlsx | XLSX spreadsheet | |
| Amendment_FA5682-16-R-0034-0001.pdf | ||
| ASHE_15-1063_BLANK_Estimate__Revision_2.xls | XLS spreadsheet | |
| ASHE_15_1065_SOW_Revision_1.pdf | ||
| ASHE_15_1063_SOW_Revision_2.pdf | ||
| Solicitation.pdf | ||
| Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| ADDITIONAL_REQUIREMENTS_12_Aug_2016.doc | DOC document | |
| ASHE_15_1063_SOW_REVISION__1_July_2016.pdf | ||
| ASHE_15-1063_MATERIAL_APPROVAL_SUBMITTALS.xlsx | XLSX spreadsheet | |
| ASHE_15_1065_SOW_JULY_2016.doc | DOC document | |
| ASHE_15_1065_BLANK_Construction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet | |
| ASHE_15_1063_SOW_June_2016.doc | DOC document | |
| ASHE_15-1063_CNS_Cost_Estimate_Breakdown_blank.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity