ASHE_15-1063_MATERIAL_APPROVAL_SUBMITTALS.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- FA5682-16-R-0034
About this file
Schedule of Material Submittals ASHE 15-1063
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_151065_MATERIAL_APPROVAL_SUBMITTALS.pdf | ||
| ASHE_151063_MATERIAL_APPROVAL_SUBMITTALS.pdf | ||
| ASHE_15_1063_SOW_Revision_2.pdf | ||
| ASHE_15_1065_BLANK_Cost_Estimate_REVISION_1.xlsx | XLSX spreadsheet | |
| Amendment_FA5682-16-R-0034-0001.pdf | ||
| ASHE_15-1063_BLANK_Estimate__Revision_2.xls | XLS spreadsheet | |
| ASHE_15_1065_SOW_Revision_1.pdf | ||
| ADDITIONAL_REQUIREMENTS_12_Aug_2016.doc | DOC document | |
| Solicitation.pdf | ||
| Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| ASHE_15_1063_SOW_REVISION__1_July_2016.pdf | ||
| ASHE_15-1063_CNS_Cost_Estimate_Breakdown_blank.xls | XLS spreadsheet | |
| ASHE_15_1065_SOW_JULY_2016.doc | DOC document | |
| ASHE_15_1065_BLANK_Construction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet | |
| ASHE_15_1063_SOW_June_2016.doc | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | ||||||||||||||
| ASHE 15-1063 | SUSTAIN HVAC SYSTEM bldg 1173 | ||||||||||||||||
| (To be completed by Project Architect or Engineer) | |||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | DESIGN | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| BOILER & VENTILATION RMs | ||||||||
| 1 | 3.1.b CHILLER 700 KW | 3 | 3 | 3 | 3 | 30 | ||
| 2 | 3.1.d HYDRONIC GROUP | 3 | 3 | 3 | 3 | 30 | ||
| 3 | 3.2.b HYDRONIC GROUP | 3 | 3 | 3 | 3 | 30 | ||
| 4 | 3.3.b SCHEME OF CIRCUIT Vent. Room | 3 | 3 | 30 | ||||
| 5 | 3.3.c PLASTIC PIPE and accessories | 3 | 3 | 3 | 3 | 3 | 30 | |
| 6 | 3.3.f VALVES. | 3 | 3 | 30 | ||||
| 7 | 3.3.g TEMPER. & PRESSURE GAUGES | 3 | 3 | 30 | ||||
| 8 | 3.4.d SCHEME FAN COIL PIPELINE | 3 | 30 | |||||
| 9 | 3.4.e FAN-COIL | 3 | 3 | 3 | 30 | |||
| 10 | 3.5 ROOM THERMOSTAT | 3 | 3 | 3 | 30 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
File details come from the government source that posted it. Updated .