ASHE_15_1065_BLANK_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
ASHE 15-1063 Sustain HVAC System, Bldg 1173, Area F, Aviano AB, Italy & ASHE 15-1065 Sustain HVAC Fac. 1472, Area F, AViano AB, Italy
Solicitation number
FA5682-16-R-0034
Issued by

About this file

Construction Cost Estimate Breakdown ASHE 15-1065

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimativo

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC Bldg 1472
PURCHASE REQUEST NUMBERPROJECT NUMBER ASHE 15-1065WORK LOCATION Area F fac# 1472
MATERIAL PLUS LABOR COST
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
3.1 REMOVALS
1FANCOIL REMOVALIT. No. Art. n.3.1aEA28
3.2 NEW FANCOIL UNITS
2FANCOIL UNITSIT. No. Art. n.3.2aEA27
3NEW PIPELINE CONNECTIONSIT. No. Art. n.3.2bL.S.1
4CONDENSE DRAIN PIPELINEIT. No. Art. n.3.2cEA27
3.3 AIR DUCT REMOVAL
5AIR DUCT REMOVALIT. No. Art. n.3.3aL.S.1
3.4 GENERAL CLEANING/MAINTENANCE
15GENERAL CLEANING/MAINTENANCEIT. No. Art. n.3.4aL.S.1
0
TOTAL COST

PREVIOUS EDITION IS OBSOLETE