About this opportunity
This solicitation seeks proposals for an indefinite-delivery/indefinite-quantity multiple award contract to provide research, development, testing, evaluation, prototyping, experimentation, and technology integration services to support the Army's modernization priorities through rapid technology insertion and disruptive innovation for multi-domain operations capabilities. Interested offerors must request a copy of the controlled unclassified performance work statement by November 11, 2022 and submit any questions in writing by November 30, 2022. Proposals are due through the DoD SAFE system by December 23, 2022 and will be evaluated based on technical approach, management, past performance, small business participation, and cost.
The solicitation has a total potential value of $900 million to be awarded over a one-year base period and four one-year options to approximately six to nine contractors. Two to three awards will be reserved for small businesses. Work will be performed at government and contractor facilities and involve research and development in applied sciences, advanced technology development, demonstration and validation, and operational systems development across ten essential programs in support of multi-domain operations. Pricing will be determined at the task order level under either cost-plus-fixed-fee or firm-fixed price contract line items, with a minimum $2,500 guarantee and maximum $100 million task order value.
Notice text
8 versions
Update #8 · Latest ·
**This final update serves as the synopsis of award. All offerors were notified of their selection status on 1 June 2023, with non-select notices provided that day as well. Debrieifings of those offerors not selected are currently under way. Award information in accordance with FAR 5.207 is as follows:
Twelve (12) Multiple Award IDIQ Contracts were awarded based on responses to the Army Modernization Priorities (PSC AJ13) RFP W911NF-22-R-0001 on 1 June 2023 by the Army Contracting Command - Aberdeen Proving Ground (RTP Division) located at 800 Park Office Drive, RTP, NC 27709. The Government accepted proposals received by the closing date of 23 December 2023. All contracts were awarded by Contracting Officer Christopher Justice in the amount of $900M each, with the place of performance to be determined at each individual task order level. The following are the contract numbers and contractors:
W911NF-23-D-0005 - Rockwell Collins Inc.
W911NF-23-D-0006 - Sierra Nevada Corp.
W911NF-23-D-0007 - Charles Stark Draper Laboratory
W911NF-23-D-0008 - Peraton Labs, Inc.
W911NF-23-D-0009 - Barbaricum
W911NF-23-D-0010 - Northrop Grumman
W911NF-23-D-0011 - By Light Professional IT Serivces LLC
W911NF-23-D-0012 - Parsons
W911NF-23-D-0013 - Enterprice Information Services, LLC
W911NF-23-D-0014 - Booz Allen Hamilton
W911NF-23-D-0015 - Alion Science & Technology
W911NF-23-D-0016 - Leidos
The Government appriecates the interest from industry in the Army Modernizaiton Priorities MAC IDIQ requirement.**
**This update serves as a reminder that interested Offerors shall send an email request no later than 4:00 PM Eastern Time TODAY (21 December 2022) to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil to request a DOD SAFE Government request to drop off files. EMAILS FOR A DOD SAFE DROP OFF REQUEST RECEIVED BEYOND THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE AND WILL NOT BE HONORED. Proposal submissions shall follow the updated instructions in the Q&A Amendment. The signed Q&A Document is re-attached to this update (no changes to actual answers or content).**
The Q&A Document posted at 10:39 AM on 13 December 2022 is updated to include Questions 175-180, which were ommitted from the previous version. The remaining content of the Q&A remains unchanged. PLEASE READ THE FULL UPDATE FROM 10:37 AM ON 13 DECMEBER 2022 AND REFERENCE THE Q&A DOCUMENT FOR UPDATED PROPOSAL SUBMISSION INSTRUCTIONS AND ANSWERS TO ALL QUESTIONS. THE INFORMATION CONTAINED IN THE Q&A DOCUMENT CONSTITUTES AN AMENDMENT TO THE RFP.
***CHANGE TO PROPOSAL SUBMISSION REQUIREMENTS - MUST READ IN FULL - UPDATE 13 DECEMBER 2023 - UPDATED WITH Q&A DOCUMENT POSTED AS AN ATTACHMENT TO SAM.GOV AND UPDATED PROPOSAL SUBMISSION INSTRUCTIONS REQUIRING SUBMISSION IN DOD SAFE:
The posted Q&A Document (and any subsequent revisions) constitutes an Amendment to the RFP. Any information contained in the this Q&A Document takes precedence over conflicting information from the RFP/PWS documents.
UPDATE TO PROPOSAL SUBMISSION INSTRUCTIONS IN SECTION L, GENERAL INSTRUCTIONS – ALL PROPOSALS SHALL BE SUBMITTED THROUGH DOD SAFE (NOT VIA EMAIL) PER INSTRUCTIONS BELOW:
There is a very high probability that proposals will contain CUI since any proposals containing content from the PWS should be marked CUI. Due to this, ALL proposals shall be submitted through DOD SAFE following a Government request to drop off files. Offerors shall send an email request no later than 4:00 PM Eastern Time on 21 December 2022 to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil to request a DOD SAFE Government request to drop off files. EMAILS FOR A DOD SAFE DROP OFF REQUEST RECEIVED BEYOND THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE AND WILL NOT BE HONORED. Following this required email request, the Government will initiate the DOD SAFE process by using the DOD SAFE “Request a Drop-Off” Function, which will provide a link for the Offeror to drop off Proposal files. Proposals shall be RECEIVED THROUGH DOD SAFE no later than 4:00 PM Eastern Time on 23 December 2022. OFFERORS SHOULD TAKE INTO ACCOUNT TIME FOR THE DOD SAFE SYSTEM TO PROCESS SUBMISSIONS. PROPOSALS NOT ACTUALLY “RECEIVED” IN DOD SAFE BY THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE. For proposals containing any CUI, the block for “Encrypt Files” should be checked in DOD SAFE and Offerors must send a separate email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil with an Offeror generated Passphrase to access the documents (this is different than the DOD SAFE generated “Claim Passcode” and you will be prompted in DOD SAFE to enter your CUI Passphrase during the submission process). In the email with the CUI Passphrase, the Government also requests that Offerors include a screen shot of the “Print Details” submission confirmation from DOD SAFE. Note: The Government recognizes there is a note regarding transmission of contract proposals on the DOD SAFE website and has confirmed this is a valid submission method.
END OF 13 DECEMBER 2022 UPDATE***
**UPDATE 9 DECEMBER 2022: The Government is finalizing answers to questions submitted in response to the RFP to ensure answers are complete and as beneficial as possible to industry and anticipates posting answers on 12 December 2022. Please be advised that the Government anticipates updating the proposal submission process to require proposal submissions through DOD SAFE rather than the email address listed in the RFP (detailed instructions will be provided as part of the Q&A Amendment) and extending the proposal submission deadline through 23 December 2022. Note that per the RFP the Q&A posting will be considered an Amendment to the RFP.**
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #7 ·
**This update serves as a reminder that interested Offerors shall send an email request no later than 4:00 PM Eastern Time TODAY (21 December 2022) to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil to request a DOD SAFE Government request to drop off files. EMAILS FOR A DOD SAFE DROP OFF REQUEST RECEIVED BEYOND THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE AND WILL NOT BE HONORED. Proposal submissions shall follow the updated instructions in the Q&A Amendment. The signed Q&A Document is re-attached to this update (no changes to actual answers or content).**
The Q&A Document posted at 10:39 AM on 13 December 2022 is updated to include Questions 175-180, which were ommitted from the previous version. The remaining content of the Q&A remains unchanged. PLEASE READ THE FULL UPDATE FROM 10:37 AM ON 13 DECMEBER 2022 AND REFERENCE THE Q&A DOCUMENT FOR UPDATED PROPOSAL SUBMISSION INSTRUCTIONS AND ANSWERS TO ALL QUESTIONS. THE INFORMATION CONTAINED IN THE Q&A DOCUMENT CONSTITUTES AN AMENDMENT TO THE RFP.
***CHANGE TO PROPOSAL SUBMISSION REQUIREMENTS - MUST READ IN FULL - UPDATE 13 DECEMBER 2023 - UPDATED WITH Q&A DOCUMENT POSTED AS AN ATTACHMENT TO SAM.GOV AND UPDATED PROPOSAL SUBMISSION INSTRUCTIONS REQUIRING SUBMISSION IN DOD SAFE:
The posted Q&A Document (and any subsequent revisions) constitutes an Amendment to the RFP. Any information contained in the this Q&A Document takes precedence over conflicting information from the RFP/PWS documents.
UPDATE TO PROPOSAL SUBMISSION INSTRUCTIONS IN SECTION L, GENERAL INSTRUCTIONS – ALL PROPOSALS SHALL BE SUBMITTED THROUGH DOD SAFE (NOT VIA EMAIL) PER INSTRUCTIONS BELOW:
There is a very high probability that proposals will contain CUI since any proposals containing content from the PWS should be marked CUI. Due to this, ALL proposals shall be submitted through DOD SAFE following a Government request to drop off files. Offerors shall send an email request no later than 4:00 PM Eastern Time on 21 December 2022 to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil to request a DOD SAFE Government request to drop off files. EMAILS FOR A DOD SAFE DROP OFF REQUEST RECEIVED BEYOND THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE AND WILL NOT BE HONORED. Following this required email request, the Government will initiate the DOD SAFE process by using the DOD SAFE “Request a Drop-Off” Function, which will provide a link for the Offeror to drop off Proposal files. Proposals shall be RECEIVED THROUGH DOD SAFE no later than 4:00 PM Eastern Time on 23 December 2022. OFFERORS SHOULD TAKE INTO ACCOUNT TIME FOR THE DOD SAFE SYSTEM TO PROCESS SUBMISSIONS. PROPOSALS NOT ACTUALLY “RECEIVED” IN DOD SAFE BY THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE. For proposals containing any CUI, the block for “Encrypt Files” should be checked in DOD SAFE and Offerors must send a separate email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil with an Offeror generated Passphrase to access the documents (this is different than the DOD SAFE generated “Claim Passcode” and you will be prompted in DOD SAFE to enter your CUI Passphrase during the submission process). In the email with the CUI Passphrase, the Government also requests that Offerors include a screen shot of the “Print Details” submission confirmation from DOD SAFE. Note: The Government recognizes there is a note regarding transmission of contract proposals on the DOD SAFE website and has confirmed this is a valid submission method.
END OF 13 DECEMBER 2022 UPDATE***
**UPDATE 9 DECEMBER 2022: The Government is finalizing answers to questions submitted in response to the RFP to ensure answers are complete and as beneficial as possible to industry and anticipates posting answers on 12 December 2022. Please be advised that the Government anticipates updating the proposal submission process to require proposal submissions through DOD SAFE rather than the email address listed in the RFP (detailed instructions will be provided as part of the Q&A Amendment) and extending the proposal submission deadline through 23 December 2022. Note that per the RFP the Q&A posting will be considered an Amendment to the RFP.**
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #6 ·
The Q&A Document posted at 10:39 AM on 13 December 2022 is updated to include Questions 175-180, which were ommitted from the previous version. The remaining content of the Q&A remains unchanged. PLEASE READ THE FULL UPDATE FROM 10:37 AM ON 13 DECMEBER 2022 AND REFERENCE THE Q&A DOCUMENT FOR UPDATED PROPOSAL SUBMISSION INSTRUCTIONS AND ANSWERS TO ALL QUESTIONS. THE INFORMATION CONTAINED IN THE Q&A DOCUMENT CONSTITUTES AN AMENDMENT TO THE RFP.
***CHANGE TO PROPOSAL SUBMISSION REQUIREMENTS - MUST READ IN FULL - UPDATE 13 DECEMBER 2023 - UPDATED WITH Q&A DOCUMENT POSTED AS AN ATTACHMENT TO SAM.GOV AND UPDATED PROPOSAL SUBMISSION INSTRUCTIONS REQUIRING SUBMISSION IN DOD SAFE:
The posted Q&A Document (and any subsequent revisions) constitutes an Amendment to the RFP. Any information contained in the this Q&A Document takes precedence over conflicting information from the RFP/PWS documents.
UPDATE TO PROPOSAL SUBMISSION INSTRUCTIONS IN SECTION L, GENERAL INSTRUCTIONS – ALL PROPOSALS SHALL BE SUBMITTED THROUGH DOD SAFE (NOT VIA EMAIL) PER INSTRUCTIONS BELOW:
There is a very high probability that proposals will contain CUI since any proposals containing content from the PWS should be marked CUI. Due to this, ALL proposals shall be submitted through DOD SAFE following a Government request to drop off files. Offerors shall send an email request no later than 4:00 PM Eastern Time on 21 December 2022 to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil to request a DOD SAFE Government request to drop off files. EMAILS FOR A DOD SAFE DROP OFF REQUEST RECEIVED BEYOND THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE AND WILL NOT BE HONORED. Following this required email request, the Government will initiate the DOD SAFE process by using the DOD SAFE “Request a Drop-Off” Function, which will provide a link for the Offeror to drop off Proposal files. Proposals shall be RECEIVED THROUGH DOD SAFE no later than 4:00 PM Eastern Time on 23 December 2022. OFFERORS SHOULD TAKE INTO ACCOUNT TIME FOR THE DOD SAFE SYSTEM TO PROCESS SUBMISSIONS. PROPOSALS NOT ACTUALLY “RECEIVED” IN DOD SAFE BY THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE. For proposals containing any CUI, the block for “Encrypt Files” should be checked in DOD SAFE and Offerors must send a separate email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil with an Offeror generated Passphrase to access the documents (this is different than the DOD SAFE generated “Claim Passcode” and you will be prompted in DOD SAFE to enter your CUI Passphrase during the submission process). In the email with the CUI Passphrase, the Government also requests that Offerors include a screen shot of the “Print Details” submission confirmation from DOD SAFE. Note: The Government recognizes there is a note regarding transmission of contract proposals on the DOD SAFE website and has confirmed this is a valid submission method.
END OF 13 DECEMBER 2022 UPDATE***
**UPDATE 9 DECEMBER 2022: The Government is finalizing answers to questions submitted in response to the RFP to ensure answers are complete and as beneficial as possible to industry and anticipates posting answers on 12 December 2022. Please be advised that the Government anticipates updating the proposal submission process to require proposal submissions through DOD SAFE rather than the email address listed in the RFP (detailed instructions will be provided as part of the Q&A Amendment) and extending the proposal submission deadline through 23 December 2022. Note that per the RFP the Q&A posting will be considered an Amendment to the RFP.**
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #5 ·
***CHANGE TO PROPOSAL SUBMISSION REQUIREMENTS - MUST READ IN FULL - UPDATE 13 DECEMBER 2023 - UPDATED WITH Q&A DOCUMENT POSTED AS AN ATTACHMENT TO SAM.GOV AND UPDATED PROPOSAL SUBMISSION INSTRUCTIONS REQUIRING SUBMISSION IN DOD SAFE:
The posted Q&A Document (and any subsequent revisions) constitutes an Amendment to the RFP. Any information contained in the this Q&A Document takes precedence over conflicting information from the RFP/PWS documents.
UPDATE TO PROPOSAL SUBMISSION INSTRUCTIONS IN SECTION L, GENERAL INSTRUCTIONS – ALL PROPOSALS SHALL BE SUBMITTED THROUGH DOD SAFE (NOT VIA EMAIL) PER INSTRUCTIONS BELOW:
There is a very high probability that proposals will contain CUI since any proposals containing content from the PWS should be marked CUI. Due to this, ALL proposals shall be submitted through DOD SAFE following a Government request to drop off files. Offerors shall send an email request no later than 4:00 PM Eastern Time on 21 December 2022 to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil to request a DOD SAFE Government request to drop off files. EMAILS FOR A DOD SAFE DROP OFF REQUEST RECEIVED BEYOND THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE AND WILL NOT BE HONORED. Following this required email request, the Government will initiate the DOD SAFE process by using the DOD SAFE “Request a Drop-Off” Function, which will provide a link for the Offeror to drop off Proposal files. Proposals shall be RECEIVED THROUGH DOD SAFE no later than 4:00 PM Eastern Time on 23 December 2022. OFFERORS SHOULD TAKE INTO ACCOUNT TIME FOR THE DOD SAFE SYSTEM TO PROCESS SUBMISSIONS. PROPOSALS NOT ACTUALLY “RECEIVED” IN DOD SAFE BY THIS DEADLINE WILL BE CONSIDERED NON-RESPONSIVE. For proposals containing any CUI, the block for “Encrypt Files” should be checked in DOD SAFE and Offerors must send a separate email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil with an Offeror generated Passphrase to access the documents (this is different than the DOD SAFE generated “Claim Passcode” and you will be prompted in DOD SAFE to enter your CUI Passphrase during the submission process). In the email with the CUI Passphrase, the Government also requests that Offerors include a screen shot of the “Print Details” submission confirmation from DOD SAFE. Note: The Government recognizes there is a note regarding transmission of contract proposals on the DOD SAFE website and has confirmed this is a valid submission method.
END OF 13 DECEMBER 2022 UPDATE***
**UPDATE 9 DECEMBER 2022: The Government is finalizing answers to questions submitted in response to the RFP to ensure answers are complete and as beneficial as possible to industry and anticipates posting answers on 12 December 2022. Please be advised that the Government anticipates updating the proposal submission process to require proposal submissions through DOD SAFE rather than the email address listed in the RFP (detailed instructions will be provided as part of the Q&A Amendment) and extending the proposal submission deadline through 23 December 2022. Note that per the RFP the Q&A posting will be considered an Amendment to the RFP.**
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #4 ·
**UPDATE 9 DECEMBER 2022: The Government is finalizing answers to questions submitted in response to the RFP to ensure answers are complete and as beneficial as possible to industry and anticipates posting answers on 12 December 2022. Please be advised that the Government anticipates updating the proposal submission process to require proposal submissions through DOD SAFE rather than the email address listed in the RFP (detailed instructions will be provided as part of the Q&A Amendment) and extending the proposal submission deadline through 23 December 2022. Note that per the RFP the Q&A posting will be considered an Amendment to the RFP.**
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #3 ·
**UPDATE 9 DECEMBER 2022: The Government is finalizing answers to questions submitted in response to the RFP to ensure answers are complete and as beneficial as possible to industry and anticipates posting answers on 12 December 2022. Please be advised that the Government anticipates updating the proposal submission process to require proposal submissions through DOD SAFE rather than the email address listed in the RFP (detailed instructions will be provided as part of the Q&A Amendment) and extending the proposal submission deadline through 23 December 2023. Note that per the RFP the Q&A posting will be considered an Amendment to the RFP.**
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #2 ·
**This note is to inform industry that the PWS marked as Controlled Unclassified Information (CUI) has been provided to the Data Custodian on record for each company who submitted a timely request for the PWS AND had an approved DD 2345 in place at the time requests were due per Section C of the RFP. Additionally, a discrepancy in the RFP has been clarified regarding submission of questions. Questions regarding the RFP are due on 30 November 2022 (one reference erroneously stated 23 November 2022).**
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Update #1 ·
This requirement is to provide the Army and other Joint Warfighter partners with a quickreaction contracting vehicle to enable & accelerate the realization of new Army Modernization transformational overmatch capabilities through rapid RDT&E prototyping, experimentation, testing, analytics, and technology insertion/integration – all aspects of operationalizing science through disruptive innovation for dominant Multi-Domain Operations (MDO) capabilities.
*** IMPORTANT INFORMATION*** Per the attached RFP, the PWS is considered Controlled Unclassified Information (CUI); therefore, interested vendors should request a copy of the Performance Work Statement (PWS) by submitting an email to usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil. Instructions for obtaining the CUI Attachment(s) are located in Section C of the RFP.
***The Government will accept PWS requests through 11 November 2022. Regardless of date of request, the PWS will be released to all approved entities on the same day (anticipated 18 November 2022). Requests received after 11 November 2022 will not be considered.***
This is the official Request for Proposals (RFP) under W911NF-22-R-0001. Industry questions or comments shall be submitted to Mr. Niko Georgakopoulos, Contracting Officer at usarmy.rtp.devcom-arl.mbx.baa3qa@army.mil . All questions and comments concerning this RFP must be submitted in writing. Verbal questions/comments will not be entertained. A cutoff date for receipt of industry written questions and comments on the RFP is 4:00 PM Eastern Time on 30 November 2022.
Attachments
Notice history
| Notice | Type | Posted |
|---|---|---|
| Army Modernization Priorities (AMP) MAC IDIQ | Solicitation | |
| Army Modernization Priorities (AMP) MAC IDIQ | Pre-Solicitation | |
| Army Modernization Priorities (AMP) MAC IDIQ | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity