This document is a project description for the AK PFH 58(1), Neck Lake Road Reconstruction project. The work consists of roadway excavation, embankment construction, grading, rock blasting, drainage, guardrail installation, erosion control, and other related work. There are three bid schedules ranging from 1.6 miles to 2.4 miles of road reconstruction. The project is tentatively scheduled to be solicited in Winter 2024-2025 with a fixed completion date in Fall 2026. The estimated price range is between $10 million and $20 million. The project will be fully and openly competed. The solicitation, when issued, will be posted on SAM.gov, and interested vendors can follow the opportunity to receive notification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AK PFH 58(1) Neck Lake Rd_Prelim Letter 2024.pdf | ||
| AK PFH 58(1) Neck Lake Ph 1 -PreAd Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK PFH 58(1), Neck Lake Rd. Reconstruction: NPOWI Hwy.to Marine
Access Facility Jct.
Tongass National Forest, Prince of Wales Island- Hyder Census Area, Alaska
The work consists of roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery, drainage (including large Aquatic Organism Pipes), embankment
(including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment.
There are 3 bid schedules; only 1 schedule will be awarded.
Project length:
Schedule A – 1.6 miles of road reconstruction
Schedule B – 2.0 miles of road reconstruction
Schedule C – 2.4 miles of road reconstruction
Tentative Solicitation Date: Winter 2024-2025
Tentative Fixed Completion Date: Fall 2026
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $10 million to $20 million
Location: 45 miles NW of Coffman Cove, Hyder Census Area, Prince of Wales
Island, Alaska
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O n e S ch ed u le
S ch
N am e
_A
A d d it io n al
N am e
B
A d d it io n al
N am e
_C
DIVISION 150 – Project Requirements
152 Construction Survey & Staking Yes Yes Yes
153 Contractor Quality Control and Assurance Yes Yes Yes
154 Contractor Sampling & Testing Yes Yes Yes
155 Schedules for Construction Contracts (construction schedules) Yes Yes Yes
157 Soil Erosion Control, Turbidity Monitoring LPSM LPSM LPSM
157 Soil Erosion Control, Temporary Turf Establishment 10 ACRE 12 ACRE 15 ACRE
157 Soil Erosion Control, Silt Fence 8,800 LNFT 8,800 LNFT 9,800 LNFT
157 Soil Erosion Control, Temporary 36-Inch Culvert Pipe 1,725 LNFT 2,050 LNFT 2,050 LNFT
157 Soil Erosion Control, Temporary Diverson Channel 350 LNFT 450 LNFT 450 LNFT
O n e S ch ed
N am e
_A d it io n al
N am e
B
A d d it io n al
N am e
_C
157 Soil Erosion Control, Fiber Roll 2,500 LNFT 3,750 LNFT 7,150 LNFT
157 Soil Erosion Control, Filter Berm 325 LNFT 925 LNFT 925 LNFT
157 Soil Erosion Control, Floating Turbidity Curtain 850 LNFT 850 LNFT 1,150 LNFT
158 Watering for Dust Control 3,320 MGAL 3,600 MGAL 3,780 MGAL
DIVISION 200 – Earthwork
201 Clearing & Grubbing 12.9 ACRE 15.1 ACRE 18.7 ACRE
203 Removal of Pipe Culvert 21 EACH 25 EACH 28 EACH
203 Removal of Structures & Obstructions (Fish Hatchery Bulkhead) 1 EACH 1 EACH 1 EACH
204 Roadway Excavation 95,762 CUYD 103,591 CUYD 126,006 CUYD
204 Roadway Excavation (Surcharge Removal) 8,126 CUYD 11,194 CUYD 13,720 CUYD
204 Subexcavation 13,750 CUYD 14,000 CUYD 22,000 CUYD
204 Select Borrow 27,000 TON 27,500 TON 43,350 TON
204 Backfill, Permeable (Limestone) 5,100 CUYD 5,100 CUYD 5,100 CUYD
204 Waste (PAG Rock) 18,000 CUYD 18,000 CUYD 18,000 CUYD
205 Blasting Consultant (Consultant/Engineering Services) Yes Yes Yes
207 Separation-Stabilization Geotextile, Class 1, Type C (Nonwoven) 21,000 SQYD 22,500 SQYD 32,000 SQYD
207 Geogrid, Stabilization 3,750 SQYD 4,500 SQYD 5,050 SQYD
207 Geomembrane 4,000 SQYD 4,000 SQYD 4,000 SQYD
208 Dewatering LPSM LPSM LPSM
211 Roadway Obliteration, Method 2 965 SQYD 965 SQYD 4,302 SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Placed Riprap, Method A, Class 2 (Riprap Blanket) 315 CUYD 315 CUYD 450 CUYD
251 Placed Riprap, Method A, Class 2 (Energy Dissipator) 30 CUYD 35 CUYD 35 CUYD
251 Placed Riprap, Method A, Class 3 (Riprap Headwall) 335 CUYD 440 CUYD 515 CUYD
251 Placed Riprap, Method A, Class 4 (Roadway Revetment) 7,075 CUYD 7,075 CUYD 7,454 CUYD
251 Riprap Ditch, Method A, Class 1 600 LNFT 1,050 LNFT 1,775 LNFT
252 Rock Buttress (Limestone) 500 CUYD 500 CUYD 500 CUYD
252 Rockery 1,000 SQFT 1,000 SQFT 1,000 SQFT
254 Precast Concrete Block Retaining Wall (Fish Hatchery Bulkhead) 120 SQFT 120 SQFT 120 SQFT
257 Contractor Furnished Wall Design (Fish Hatchery Bulkhead) LPSM LPSM LPSM
260 Rock Dowel 1,085 LNFT 1,085 LNFT 1,200 LNFT
271 Geotechnical Instrumentation, Piezometer 8 EACH 12 EACH 13 EACH
271 Geotechnical Instrumentation, Piezometer (With Data Logger) 2 EACH 2 EACH 2 EACH
DIVISION 300 – Aggregate and Base Courses
301 Aggregate Surface Course 9,900 TON 12,000 TON 14,450 TON
302 Roadway Aggregate, Method 2 675 TON 900 TON 1,150 TON
302 Bedding and Backfill Aggregate (Limestone) 900 CUYD 900 CUYD 900 CUYD e S ch ed
N d it io n al
N am e
B
A d d it io n al
N am e
_C
DIVISION 600 – Incidental Construction
602 18-inch Pipe Culvert 52 LNFT
602 24-inch Pipe Culvert 740 LNFT 875 LNFT 930 LNFT
602 30-inch Pipe Culvert 166 LNFT 210 LNFT 210 LNFT
602 36-inch Pipe Culvert 60 LNFT 60 LNFT 60 LNFT
602 60-inch Pipe Culvert 74 LNFT 74 LNFT 74 LNFT
602 72-inch Pipe Culvert 100 LNFT 100 LNFT 100 LNFT
602 72-inch Pipe Culvert (Simulated Stream) 66 LNFT 132 LNFT 132 LNFT
602 96-inch Pipe Culvert 120 LNFT 120 LNFT 120 LNFT
602 108-inch Pipe Culvert (Simulated Stream) 74 LNFT 74 LNFT
602 120-inch Pipe Culvert 110 LNFT
602 36-inch Equivalent Diameter Arch or Elliptical Pipe Culvert 110 LNFT 110 LNFT 110 LNFT
602 End Section for 18-inch Pipe Culvert 2 EACH
602 End Section for 24-inch Pipe Culvert 10 EACH 11 EACH 12 EACH
602 End Section for 30-inch Pipe Culvert 3 EACH 4 EACH 4 EACH
602 End Section for 36-inch Pipe Culvert 1 EACH 1 EACH 1 EACH
602 End Section for 36-inch Equivalent Diameter Arch or Pipe Culvert 2 EACH 2 EACH 2 EACH
603 Structural Plate Pipe-Arch (96-inch Equivalent, Simulated Stream) 64 LNFT 64 LNFT 64 LNFT
610 Horizontal Drain Pipe 2,100 LNFT 2,100 LNFT 2,320 LNFT
617 Guardrail System MGS, Type 2, Class A Steel Posts 5,363 LNFT 5,688 LNFT 6,150 LNFT
617 Terminal Section (Alaska End Terminal) 15 EACH 16 EACH 19 EACH
617 Terminal Section (Type MGS Tangent) 3 EACH 4 EACH 7 EACH
621 Monument (Settlement Plate) 6 EACH 10 EACH 11 EACH
622 Rental Equipment Yes Yes Yes
623 General Labor Yes Yes Yes
623 Special Labor, Hired Technical Services (PAG Rock Monitoring) LPSM LPSM LPSM
624 Placing Conserved Topsoil (6-inch Depth) 9 ACRE 11 ACRE 14.1 ACRE
625 Turf Establishment (Hydraulic Method, Type 1) 46 SLRY 54 SLRY 64 SLRY
625 Turf Establishment (Hydraulic Method Type 2) 1 SLRY 1 SLRY 4 SLRY
633 Sign System 3 SQFT 5 SQFT 68 SQFT
635 Temporary Traffic Control – Barricade Type 3 6 EACH 6 EACH 6 EACH
635 Temporary Traffic Control – Cone, Type 36-inch 120 EACH 120 EACH 120 EACH
635 Temporary Traffic Control – Drum 60 EACH 60 EACH 60 EACH
635 Temporary Traffic Control – Vertical Panel 60 EACH 60 EACH 60 EACH
635 Temporary Traffic Control – Concrete Barrier 1,200 LNFT 1,200 LNFT 1,200 LNFT
635 Temporary Traffic Control – Plastic Fence 1,650 LNFT 3,300 LNFT 5,450 LNFT
635 Temporary Traffic Control – Construction Sign 445 SQFT 445 SQFT 445 SQFT
635 Temporary Traffic Control - Flagger 100 HOUR 100 HOUR 400 HOUR
637 Field Office 1 EACH 1 EACH 1 EACH e S ch ed
N d it io n al
N am e
B
A d d it io n al
N am e
_C
637 Field Office (Storage Container) 1 EACH 1 EACH 1 EACH
637 Vehicle 4 EACH 4 EACH 4 EACH
647 Mitigation, Rock Weir 2 EACH 2 EACH 2 EACH
647 Mitigation, Rock Weir (Bedrock) 3 EACH 3 EACH 3 EACH
647 Mitigation, Root Wad 2 EACH 2 EACH
647 Mitigation, Streambed Channel Realignment 160 CUYD 160 CUYD 160 CUYD
647 Mitigation, Streambed Channel Reconstruction (Bedrock) 45 CUYD 45 CUYD 45 CUYD