A/E Electrification Study
Closed Solicitation Posted
- Solicitation number
- ISD-349281-SCM
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541330 Engineering Services
- Place of performance
- Batavia, Illinois 60510, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory seeks a qualified firm to conduct a planning level study analyzing the feasibility and opportunities for transitioning the laboratory campus in Batavia, Illinois to fully electric systems. The study will evaluate replacing natural gas systems with electric and introducing EV infrastructure to optimize energy consumption, efficiency, and achieve net-zero emissions. Proposals will be evaluated based on project approach, experience, team composition, and cost. The response deadline is March 8, 2024.
There is no set-aside designation. The place of performance is the Fermi National Accelerator Laboratory campus in Batavia, Illinois. The selected firm will analyze electrifying two buildings initially and has the optional scope to include six additional buildings. The work is expected to commence upon award and be completed within two to three months.
Notice text
3 versions
Update #3 · Latest ·
FRA is seeking a qualified firm to conduct a planning level study for the laboratory campus of Fermilab in Batavia, aimed at transitioning its energy infrastructure to fully electric systems. The study will focus on analyzing the feasibility, challenges, and opportunities associated with electrifying the campus, including the replacement of natural gas systems. The study will also evaluate the impact of introducing EV infrastructure. The overall goal is to optimize energy consumption, enhance energy efficiency, promote energy conservation, and achieve a sustainable, net-zero emissions operation. Please see the attached RFP for more details.
AMENDMENT 01 (02/19/2024)
The purpose of this amendment is to upload the Terms and Conditions (see attached doc). No other changes were made.
AMENDMENT 02 (02/26/2024)
The purpose of this modification is to:
1. Remove all language requesting price proposals. This is a request for qualifications.
2. Answer all RFI’s received. See attached Amendment 02 file.
Update #2 ·
FRA is seeking a qualified firm to conduct a planning level study for the laboratory campus of Fermilab in Batavia, aimed at transitioning its energy infrastructure to fully electric systems. The study will focus on analyzing the feasibility, challenges, and opportunities associated with electrifying the campus, including the replacement of natural gas systems. The study will also evaluate the impact of introducing EV infrastructure. The overall goal is to optimize energy consumption, enhance energy efficiency, promote energy conservation, and achieve a sustainable, net-zero emissions operation. Please see the attached RFP for more details.
AMENDMENT 01 (02/19/2024)
The purpose of this amendment is to upload the Terms and Conditions (see attached doc). No other changes were made.
Update #1 ·
FRA is seeking a qualified firm to conduct a planning level study for the laboratory campus of Fermilab in Batavia, aimed at transitioning its energy infrastructure to fully electric systems. The study will focus on analyzing the feasibility, challenges, and opportunities associated with electrifying the campus, including the replacement of natural gas systems. The study will also evaluate the impact of introducing EV infrastructure. The overall goal is to optimize energy consumption, enhance energy efficiency, promote energy conservation, and achieve a sustainable, net-zero emissions operation. Please see the attached RFP for more details.
Files
| File | Type | Posted |
|---|---|---|
| Electrification Study RFP Amendment 02.pdf | ||
| Amendment 02.pdf | ||
| General Terms and Conditions for Services (05.2023).pdf | ||
| Amendment 01.doc | DOC document | |
| SARC_Subcontractor Annual RepsCerts Rev 3.pdf | ||
| 2022 AE Insurance Requirements.pdf | ||
| Electrification Study RFP.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity