Addition/Repair Medical Training Facility, B3120, Eglin Air Force Base, FL
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR-51061297
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Eglin AFB, Florida 32542, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Louisville is seeking construction services for the addition and repair of a Medical Training Facility (B3120) at Eglin Air Force Base, Florida. The project will construct a new addition including concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units and brick veneer, metal stud and gypsum board interior walls, plus complete HVAC, electrical, and communications systems to provide conditioned indoor space for SOMDS training and administrative functions. The work also includes enclosing a covered drive area with minor room reconfigurations and adding a 40-car parking area southeast of the existing building. The solicitation is restricted to pre-qualified Southeast Region Multiple Award Task Order Contract (MATOC) pool holders with contract numbers W912QR21D0049 through W912QR21D0055, and evaluation will be based on the lowest evaluated price. After multiple amendments extending deadlines, the current proposal submission deadline is July 23, 2025, at 2:00 PM ET.
This solicitation does not utilize any set-aside designations and is exclusively available to seven specific MATOC contractors: Bill W. Jarrett Construction Company, Butts Construction Company, Howard W. Pence, PEM-Jarkins JV LLP, Southeastern Industrial Barlovento JV-2, Zodiac-Poetiker HBZ Joint Venture, and ESA South, Inc. The estimated contract value falls between $1,000,000 and $5,000,000 for this design-build project. The construction will add approximately 1,778 square feet of new space and convert 975 square feet of covered drive space, totaling about 3,700 square feet of facility improvements. Performance and payment bonds will be required, and contractors must use binding rates from their existing MATOC contracts. The work will be performed at Eglin Air Force Base in Florida, supporting medical training operations for U.S. Army Reserves, U.S. Air Force Reserves, and related military programs in the Southeast Region.
Notice text
14 versions
Update #14 · Latest ·
****Amendment 0009 extending the due date to 23 July @ 2 PM ET.
****Amendment 0008 providing certified final plans and specs and extending the due date to 18 July @ 2 PM ET.
****Amendment 0007 extending the due date to 16 July @ 10 AM ET.
****Amendment 0006 extending the due date to 9 July @ 10 AM ET.
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET.
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #13 ·
****Amendment 0008 providing certified final plans and specs and extending the due date to 18 July @ 2 PM ET.
****Amendment 0007 extending the due date to 16 July @ 10 AM ET.
****Amendment 0006 extending the due date to 9 July @ 10 AM ET.
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET.
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #12 ·
****Amendment 0007 extending the due date to 16 July @ 10 AM ET.
****Amendment 0006 extending the due date to 9 July @ 10 AM ET.
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET.
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #11 ·
****Amendment 0006 extending the due date to 9 July @ 10 AM ET.
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET.
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #10 ·
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET.
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #9 ·
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET. Documents will be uploaded by COB.*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET ***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule ***** Uploaded Site Visit Sign-In Sheet *********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #8 ·
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. .
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #7 ·
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #6 ·
*******Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET ********
********Amendment 0003: Extend due date to 9 JUNE @ 10AM ET *********
******** Amendment 0002: Extend due date to 30 MAY @ 10AM ET**********
******** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule *********
****** Uploaded Site Visit Sign-In Sheet ***********
THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #5 ·
********Amendment 0003: Extend due date to 9 JUNE @ 10AM ET *********
******** Amendment 0002: Extend due date to 30 MAY @ 10AM ET**********
******** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule *********
****** Uploaded Site Visit Sign-In Sheet ***********
THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #4 ·
******** Amendment 0002: Extend due date to 30 MAY @ 10AM ET**********
******** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule *********
****** Uploaded Site Visit Sign-In Sheet ***********
THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #3 ·
******** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule *********
****** Uploaded Site Visit Sign-In Sheet ***********
THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #2 ·
THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:
W912QR21D0049
W912QR21D0050
W912QR21D0051
W912QR21D0052
W912QR21D0053
W912QR21D0054
W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
Update #1 ·
THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS.The solicitation and specifications documents will be available by close of business 24 April 2025.
Files
Show all 21
Notice history
| Notice | Type | Posted |
|---|---|---|
| Addition/Repair Medical Training Facility, B3120, Eglin Air Force Base, FL | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Market Intelligence - Progressive Design-Build - SRM Campaign for the 96th Medical Group | ENDIST Mobile | No set-aside | |
| Small Business D/B Military Construction MATOC | ENDIST Louisville | Total Small Business |