AATTC Trailer Reconfiguration
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S7G26RA005
- Agency
- Army National Guard Department of the Army, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Saint Joseph, Missouri 64503, United States
- Points of contact
-
- Adam D. Danner adam.danner.1@us.af.mil (816) 236-3256
- MSgt Amanda Glise amanda.glise@us.af.mil (816) 236-3032
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army National Guard, specifically the Missouri Air National Guard's 139th Airlift Wing, is soliciting proposals for the AATTC (Air Aircrew Training and Tactics Center) North and South Trailer Reconfiguration project (Solicitation Number W50S7G26RA0050002). The procurement encompasses a three-phase construction and facility upgrade project consisting of Phase 1 interior facility upgrades to AATTC South trailers, Phase 2 exterior facility upgrades to AATTC South trailers, and Phase 3 decommissioning and removal of the North trailer group along with decking repairs, new guardrail and stair construction, and removal of associated infrastructure. Key contract requirements include SAM registration, REAL ID-compliant identification for all personnel, completion of background checks, OSHA compliance, submission of completed Standard Form 1442 with pricing, a one-page capability statement demonstrating relevant experience, and acknowledgment of all solicitation amendments (two amendments issued as of January 28, 2026). The government will evaluate proposals based on technical risk and price without priced tradeoffs under FAR 13.106-2, with award to the responsible offeror whose proposal is most advantageous to the Government. The proposal deadline is January 30, 2026, at 10:00 AM local time, with a mandatory site visit that occurred on January 27, 2026.
This procurement is designated as a Total Small Business Set-Aside (100% small business), with no identified incumbents or current contractors referenced in the solicitation documents. The estimated contract magnitude ranges between $25,000 and $100,000, utilizing a Firm Fixed Price contract type with a single award anticipated. The project timeline requires contractors to commence work within 10 calendar days of receiving notice to proceed and complete all work within 50 calendar days, with Phase 1 completion required by March 20, 2026, and Phases 2 and 3 completion required by April 28, 2026. Work will be performed Monday through Friday from 7:00 AM to 4:00 PM at Rosecrans Memorial Airport in St. Joseph, Missouri (64503), requiring compliance with Missouri prevailing wage rates for various trades and minimum insurance requirements including Workers' Compensation ($100,000), Comprehensive General Liability ($500,000 per occurrence), and Comprehensive Automobile Liability ($200,000 per person/$500,000 per accident).
Notice text
6 versions
Update #6 · Latest ·
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group.
09 Jan 2026 - Added missing document.
21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time.
22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work.
Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026.
28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.***
29 Jan 2026 - Uploaded Sign-in sheet from the Site Visit held on January 27th, 2026. Uploaded an informational drawing for the south trailer group, "ULYB262003 South Trailer Group First Floor Plan"
Update #5 ·
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group.
09 Jan 2026 - Added missing document.
21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time.
22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work.
Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026.
28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.***
Update #4 ·
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group.
09 Jan 2026 - Added missing document.
21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time.
22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work.
Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026.
Update #3 ·
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.
09 Jan 2026 - Added missing document.
21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time.
Update #2 ·
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.
09 Jan 2026 - Added missing document.
Update #1 ·
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.
Attachments
Show all 16
Notice history
| Notice | Type | Posted |
|---|---|---|
| AATTC Trailer Reconfiguration | Award Notice | |
| AATTC Trailer Reconfiguration | Solicitation | |
| AATTC Trailer Reconfiguration | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity