About this opportunity
The U.S. Army Corps of Engineers Savannah District intends to issue a request for proposal for an 8(a) Small Business Set-Aside Design-Build Construction Single Award Task Order Contract to provide general construction services including new construction, rehabilitation, maintenance and repair of government facilities located in Georgia, South Carolina, and North Carolina. The contract will have a maximum value of $95 million over a five-year period including options, with task orders ranging between $500,000 to $5 million. Proposals will be evaluated using a two-phase design-build selection process, first evaluating past performance and design experience, then technical approach and price. The anticipated release of phase one is June 26, 2019, with proposals due July 30, 2019.
The solicitation is an 8(a) small business set-aside, with North American Industry Classification System code 236220 - Commercial and Institutional Building Construction and a size standard of $36.5 million. The contract is a firm-fixed price indefinite delivery contract with a period of performance not exceeding five years. Task orders will be placed for work at locations including Fort Benning, with services to be performed within the three-state region. Up to five offerors will be selected from phase one to participate in phase two evaluations for the potential award.
Notice text
8 versions
Update #8 · Latest ·
Amendment 08:
A. CONTRACT CHANGES:
1. The following attachment is hereby added into and made a part of the solicitation:
a. Attachment 25, Pierce Range, Pierce Range, RCW Habitat, 19R3000
2. TECHNICAL SPECIFICATION CHANGES:
a. Solicitation section 00 10 00, Proposal Submission Requirements and Instructions Notes, is hereby
changed as follows:
FROM:
Proposal Due Date and Time: April 30, 2020
Request For Proposal No: W912HN-19-R-3000
Due Date of Proposal: 30 April 2020
Time by which Proposals are due: 1:00 PM EST
TO:
Proposal Due Date and Time:
Request For Proposal No: W912HN-19-R-3000
Due Date of Proposal: 7 May 2020
Time by which Proposals are due: 1:00 PM EST
b. Appendix A, Phase II, Seed Task Order Project, Section 1, is hereby changed as follows:
FROM:
Your proposal should be signed by a duly authorized official of your company and is required no later
than April 30, 2020 at 1:00 p.m. Local Time.
TO:
Your proposal should be signed by a duly authorized official of your company and is required no later
than 7 May 2020 at 1:00 p.m. Local Time.
c. Appendix A, Phase II Seed Task Order Project, Section 3, is hereby changed as follows:
FROM:
Proposal Due Date and Time:
Request For Proposal No: W912HN-19-R-3000
Due Date of Proposal: 30 April 2020
Time by which Proposals are due: 1:00 PM EST
d. Section 00 21 00 – Instructions, Additional Notes to Offerors, Appendix A, Section 19 Technical
Requirements changes are incorporated into and made a part of the solicitation as follows:
From: A. Attachments 1-24
To: A. Attachments 1-25
B. CONTRACT DRAWINGS: There are no contract drawings changes with this Amendment.
All other terms and conditions remain unchanged.
Amendment 07: Non-existent due to system issues.
Amendment 06:
The purpose of Amendment 0006 is to:
A. CONTRACT CHANGES:
1. TECHNICAL SPECIFICATION CHANGES:
a. Appendix A, Phase II Seed Task Order Project, Section 16 – Contractor Requirements, subparagraph
A is changed as follows:
FROM:
A. ☐ Project Involves Handling of Asbestos or Lead Base Paint.
☐ Record of Survey
☒ REC provided
TO:
A. ☒ Project Involves Handling of Asbestos or Lead Base Paint.
☐ Record of Survey
☐ REC provided
(Note: There is a potential (only) that the Project Involves Handling of Asbestos or Lead Base
Paint.)
b. Section 00 21 00, Appendix A, section 1, paragraph 4 is changed as follows:
FROM:
A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA.
The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions
shall be submitted NLT, Friday, April 17, 2020 at 1:00 p.m. Local Time. All questions shall be
submitted through ProjNet.
TO:
A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA.
The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions
shall be submitted NLT, Monday, April 27, 2020 at 1:00 p.m. Local Time. All questions shall be
submitted through ProjNet.
B. CONTRACT DRAWINGS: The following drawing (Attachments 12-24) clarifications are hereby
incorporated into and made a part of the solicitation:
a. Young Range Drawing clarifications:
i. Attachments 12-22 are Young Range drawings and are renamed to add “Young Range” to the
file names as follows:
1. Attachment 12, Young Range Control Tower, Small Arms, 44047-E1, 19R3000
2. Attachment 13, Young Range Control Tower, Small Arms, 44047-E2, 19R3000
3. Attachment 14, Young Range Control Tower, Small Arms, 44047-E3, 19R3000
4. Attachment 15, Young Range Control Tower, Small Arms, 44047-E4, 19R3000
5. Attachment 16, Young Range Control Tower, Small Arms, 44047-E5, 19R3000
6. Attachment 17, Young Range Control Tower, Small Arms, 44047-E6, 19R3000
7. Attachment 18, Young Range Control Tower, Small Arms, 44047-E7, 19R3000
8. Attachment 19, Young Range Control Tower, Small Arms, 44047-E8, 19R3000
9. Attachment 20, Young Range, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
10. Attachment 21, Young Range Control Tower, Small Arms, ST-M2, 19R3000
11. Attachment 22, Young Range, Mtl Tower, Structural & Shop Drawings, 19R3000
ii. All Young Range drawings are provided for reference only
b. Pierce Range Drawing/Topo clarifications:
i. Attachment 24 is a Pierce Range drawing and is renamed to add “Pierce Range” to the file
name as follows:
1. Attachment 24, Pierce Range, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000
ii. All Pierce Range drawings and topo are provided for reference only
All other terms and conditions remain unchanged.
Amendment 05:
A. CONTRACT CHANGES:
1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and
made a part of the solicitation.
a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000
b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000
2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission
Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made
a part of the solicitation as follows:
From:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project
utilizing R.S. Means Cost Works.
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction
Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
To:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the
sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on
Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out,
non-priced items, etc.). Offeror’s proposal shall be prepared and meet the requirements as stated in Notes
To Offeror.
9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home
Office Overhead for the base period to the SEED project
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the
applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
Offerors will also be evaluated on how well they understand the required application of the proposed
coefficient and mark-ups.
9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based
on the submission provided, the Government will evaluate the Offeror’s overall quantitative approach for
logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported
the approach is for the SEED project.
B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 – Instructions, Additional Notes to
Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part
of the solicitation as follows:
From: A. Attachments 1-9
To: A. Attachments 1-24
C. CONTRACT DRAWINGS: The following drawings (Attachments 12-22) are hereby incorporated into and
made a part of the solicitation:
a. Attachment 12, Range Control Tower, Small Arms, 44047-E1, 19R3000
b. Attachment 13, Range Control Tower, Small Arms, 44047-E2, 19R3000
c. Attachment 14, Range Control Tower, Small Arms, 44047-E3, 19R3000
d. Attachment 15, Range Control Tower, Small Arms, 44047-E4, 19R3000
e. Attachment 16, Range Control Tower, Small Arms, 44047-E5, 19R3000
f. Attachment 17, Range Control Tower, Small Arms, 44047-E6, 19R3000
g. Attachment 18, Range Control Tower, Small Arms, 44047-E7, 19R3000
h. Attachment 19, Range Control Tower, Small Arms, 44047-E8, 19R3000
i. Attachment 20, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
j. Attachment 21, Range Control Tower, Small Arms, ST-M2, 19R3000
k. Attachment 22, Mtl Tower, Structural & Shop Drawings, 19R3000
l. Attachment 23, Pierce Range Ammo Issue Point, 19R3000
m. Attachment 24, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000
Amendment 04:
A. CONTRACT CHANGES:
1. FAR Provision 52.228-1 is hereby replaced in its entirety.
2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical
specifications are changed as follows:
a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety
b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from
the main body of the seed project Task Order document and is included as a separate attachment.
c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the
solicitation.
d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added
to and made a part of the solicitation.
3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA
To: Pierce Range, Fort Benning, GA
4. Appendix A, Seed Task Order, “After Task Order Award” section is replaced in its entirety
B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 – Design After Award is hereby
added to and made a part of Appendix A, Seed Project, number 18.
Amendment 03-Phase II
Only those in the competitive range and selected for Phase II may submit a proposal.
Update #7 ·
Amendment 06:
The purpose of Amendment 0006 is to:
A. CONTRACT CHANGES:
1. TECHNICAL SPECIFICATION CHANGES:
a. Appendix A, Phase II Seed Task Order Project, Section 16 – Contractor Requirements, subparagraph
A is changed as follows:
FROM:
A. ☐ Project Involves Handling of Asbestos or Lead Base Paint.
☐ Record of Survey
☒ REC provided
TO:
A. ☒ Project Involves Handling of Asbestos or Lead Base Paint.
☐ Record of Survey
☐ REC provided
(Note: There is a potential (only) that the Project Involves Handling of Asbestos or Lead Base
Paint.)
b. Section 00 21 00, Appendix A, section 1, paragraph 4 is changed as follows:
FROM:
A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA.
The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions
shall be submitted NLT, Friday, April 17, 2020 at 1:00 p.m. Local Time. All questions shall be
submitted through ProjNet.
TO:
A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA.
The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions
shall be submitted NLT, Monday, April 27, 2020 at 1:00 p.m. Local Time. All questions shall be
submitted through ProjNet.
B. CONTRACT DRAWINGS: The following drawing (Attachments 12-24) clarifications are hereby
incorporated into and made a part of the solicitation:
a. Young Range Drawing clarifications:
i. Attachments 12-22 are Young Range drawings and are renamed to add “Young Range” to the
file names as follows:
1. Attachment 12, Young Range Control Tower, Small Arms, 44047-E1, 19R3000
2. Attachment 13, Young Range Control Tower, Small Arms, 44047-E2, 19R3000
3. Attachment 14, Young Range Control Tower, Small Arms, 44047-E3, 19R3000
4. Attachment 15, Young Range Control Tower, Small Arms, 44047-E4, 19R3000
5. Attachment 16, Young Range Control Tower, Small Arms, 44047-E5, 19R3000
6. Attachment 17, Young Range Control Tower, Small Arms, 44047-E6, 19R3000
7. Attachment 18, Young Range Control Tower, Small Arms, 44047-E7, 19R3000
8. Attachment 19, Young Range Control Tower, Small Arms, 44047-E8, 19R3000
9. Attachment 20, Young Range, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
10. Attachment 21, Young Range Control Tower, Small Arms, ST-M2, 19R3000
11. Attachment 22, Young Range, Mtl Tower, Structural & Shop Drawings, 19R3000
ii. All Young Range drawings are provided for reference only
b. Pierce Range Drawing/Topo clarifications:
i. Attachment 24 is a Pierce Range drawing and is renamed to add “Pierce Range” to the file
name as follows:
1. Attachment 24, Pierce Range, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000
ii. All Pierce Range drawings and topo are provided for reference only
All other terms and conditions remain unchanged.
Amendment 05:
A. CONTRACT CHANGES:
1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and
made a part of the solicitation.
a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000
b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000
2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission
Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made
a part of the solicitation as follows:
From:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project
utilizing R.S. Means Cost Works.
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction
Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
To:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the
sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on
Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out,
non-priced items, etc.). Offeror’s proposal shall be prepared and meet the requirements as stated in Notes
To Offeror.
9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home
Office Overhead for the base period to the SEED project
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the
applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
Offerors will also be evaluated on how well they understand the required application of the proposed
coefficient and mark-ups.
9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based
on the submission provided, the Government will evaluate the Offeror’s overall quantitative approach for
logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported
the approach is for the SEED project.
B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 – Instructions, Additional Notes to
Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part
of the solicitation as follows:
From: A. Attachments 1-9
To: A. Attachments 1-24
C. CONTRACT DRAWINGS: The following drawings (Attachments 12-22) are hereby incorporated into and
made a part of the solicitation:
a. Attachment 12, Range Control Tower, Small Arms, 44047-E1, 19R3000
b. Attachment 13, Range Control Tower, Small Arms, 44047-E2, 19R3000
c. Attachment 14, Range Control Tower, Small Arms, 44047-E3, 19R3000
d. Attachment 15, Range Control Tower, Small Arms, 44047-E4, 19R3000
e. Attachment 16, Range Control Tower, Small Arms, 44047-E5, 19R3000
f. Attachment 17, Range Control Tower, Small Arms, 44047-E6, 19R3000
g. Attachment 18, Range Control Tower, Small Arms, 44047-E7, 19R3000
h. Attachment 19, Range Control Tower, Small Arms, 44047-E8, 19R3000
i. Attachment 20, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
j. Attachment 21, Range Control Tower, Small Arms, ST-M2, 19R3000
k. Attachment 22, Mtl Tower, Structural & Shop Drawings, 19R3000
l. Attachment 23, Pierce Range Ammo Issue Point, 19R3000
m. Attachment 24, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000
Amendment 04:
A. CONTRACT CHANGES:
1. FAR Provision 52.228-1 is hereby replaced in its entirety.
2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical
specifications are changed as follows:
a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety
b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from
the main body of the seed project Task Order document and is included as a separate attachment.
c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the
solicitation.
d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added
to and made a part of the solicitation.
3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA
To: Pierce Range, Fort Benning, GA
4. Appendix A, Seed Task Order, “After Task Order Award” section is replaced in its entirety
B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 – Design After Award is hereby
added to and made a part of Appendix A, Seed Project, number 18.
Amendment 03-Phase II
Only those in the competitive range and selected for Phase II may submit a proposal.
Update #6 ·
Amendment 05:
A. CONTRACT CHANGES:
1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and
made a part of the solicitation.
a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000
b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000
2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission
Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made
a part of the solicitation as follows:
From:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project
utilizing R.S. Means Cost Works.
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction
Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
To:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the
sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on
Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out,
non-priced items, etc.). Offeror’s proposal shall be prepared and meet the requirements as stated in Notes
To Offeror.
9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home
Office Overhead for the base period to the SEED project
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the
applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
Offerors will also be evaluated on how well they understand the required application of the proposed
coefficient and mark-ups.
9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based
on the submission provided, the Government will evaluate the Offeror’s overall quantitative approach for
logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported
the approach is for the SEED project.
B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 – Instructions, Additional Notes to
Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part
of the solicitation as follows:
From: A. Attachments 1-9
To: A. Attachments 1-24
C. CONTRACT DRAWINGS: The following drawings (Attachments 12-22) are hereby incorporated into and
made a part of the solicitation:
a. Attachment 12, Range Control Tower, Small Arms, 44047-E1, 19R3000
b. Attachment 13, Range Control Tower, Small Arms, 44047-E2, 19R3000
c. Attachment 14, Range Control Tower, Small Arms, 44047-E3, 19R3000
d. Attachment 15, Range Control Tower, Small Arms, 44047-E4, 19R3000
e. Attachment 16, Range Control Tower, Small Arms, 44047-E5, 19R3000
f. Attachment 17, Range Control Tower, Small Arms, 44047-E6, 19R3000
g. Attachment 18, Range Control Tower, Small Arms, 44047-E7, 19R3000
h. Attachment 19, Range Control Tower, Small Arms, 44047-E8, 19R3000
i. Attachment 20, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
j. Attachment 21, Range Control Tower, Small Arms, ST-M2, 19R3000
k. Attachment 22, Mtl Tower, Structural & Shop Drawings, 19R3000
l. Attachment 23, Pierce Range Ammo Issue Point, 19R3000
m. Attachment 24, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000
Amendment 04:
A. CONTRACT CHANGES:
1. FAR Provision 52.228-1 is hereby replaced in its entirety.
2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical
specifications are changed as follows:
a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety
b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from
the main body of the seed project Task Order document and is included as a separate attachment.
c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the
solicitation.
d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added
to and made a part of the solicitation.
3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA
To: Pierce Range, Fort Benning, GA
4. Appendix A, Seed Task Order, “After Task Order Award” section is replaced in its entirety
B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 – Design After Award is hereby
added to and made a part of Appendix A, Seed Project, number 18.
Amendment 03-Phase II
Only those in the competitive range and selected for Phase II may submit a proposal.
Update #5 ·
Amendment 05:
A. CONTRACT CHANGES:
1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and
made a part of the solicitation.
a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000
b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000
2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission
Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made
a part of the solicitation as follows:
From:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project
utilizing R.S. Means Cost Works.
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction
Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
To:
9. PHASE TWO – TAB D – FACTOR 3 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the
sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on
Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out,
non-priced items, etc.). Offeror’s proposal shall be prepared and meet the requirements as stated in Notes
To Offeror.
9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home
Office Overhead for the base period to the SEED project
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the
applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
Offerors will also be evaluated on how well they understand the required application of the proposed
coefficient and mark-ups.
9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based
on the submission provided, the Government will evaluate the Offeror’s overall quantitative approach for
logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported
the approach is for the SEED project.
B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 – Instructions, Additional Notes to
Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part
of the solicitation as follows:
From: A. Attachments 1-9
To: A. Attachments 1-24
Amendment 04:
A. CONTRACT CHANGES:
1. FAR Provision 52.228-1 is hereby replaced in its entirety.
2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical
specifications are changed as follows:
a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety
b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from
the main body of the seed project Task Order document and is included as a separate attachment.
c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the
solicitation.
d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added
to and made a part of the solicitation.
3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA
To: Pierce Range, Fort Benning, GA
4. Appendix A, Seed Task Order, “After Task Order Award” section is replaced in its entirety
B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 – Design After Award is hereby
added to and made a part of Appendix A, Seed Project, number 18.
Amendment 03-Phase II
Only those in the competitive range and selected for Phase II may submit a proposal.
Update #4 ·
Amendment 04:
A. CONTRACT CHANGES:
1. FAR Provision 52.228-1 is hereby replaced in its entirety.
2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical
specifications are changed as follows:
a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety
b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from
the main body of the seed project Task Order document and is included as a separate attachment.
c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the
solicitation.
d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added
to and made a part of the solicitation.
3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA
To: Pierce Range, Fort Benning, GA
4. Appendix A, Seed Task Order, “After Task Order Award” section is replaced in its entirety
B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 – Design After Award is hereby
added to and made a part of Appendix A, Seed Project, number 18.
Amendment 03-Phase II
Only those in the competitive range and selected for Phase II may submit a proposal.
Update #3 ·
Amendment 03-Phase II
Only those in the competitive range and selected for Phase II may submit a proposal.
Update #2 ·
DESCRIPTION:
The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue a Request for Proposal (RFP) W912HN19R3000 for the Fort Benning (RP 12-03) 8(a) Small Business Set-Aside, Design-Build Construction Single Award Task Order Contract (SATOC) in support of the MILCON and SRM program. Task Orders issued under this SATOC will be for work within the three-state region of Georgia, South Carolina, and North Carolina.
This Design-Build SATOC is to provide rapid response for General Construction: new construction, rehabilitation, maintenance or repair of situations relating, but not limited to, site work, mechanical systems, plumbing, utility systems, structural, electrical, HVAC, instrumentation, security and safety areas of Government facilities in a cost effective manner. Work requiring the use of civil funds is not allowed. Task orders for design only or demolition only shall not be placed against the Contract. Work may include, but is not limited to: vertical construction, roofs, anti-terrorism force protection of new and existing facilities, horizontal construction, and incidental work.
TYPE OF CONTRACT AND NAICS:
This acquisition will be offered as an 8(a) set-aside competitive solicitation and will result in one (1) Firm Fixed Price Indefinite Delivery Contract (IDC) Contract. The contract period of performance will not exceed five years (two (2) year base period and three 1 year options periods) with a total contract capacity of $95M. The order limitation of task orders issued under this SATOC will range between $500k and $5M and will be firm fixed price.
The North American Industry Classification System (NAICS) code is 236220-Commercial and Institutional Building Construction, with size standard of $36,500,000.
TYPE OF SET-ASIDE: This acquisition will be an 8(a) Small Business Set-Aside
CONSTRUCTION MAGNITUDE: In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $100,000,000.
SELECTION PROCESS: The proposals will be evaluated using a Best Value source selection process. This is a two-phase Design-Build procurement process. Potential offerors are invited to submit their performance and capability information as will be described in Section 00 21 00 of the Solicitation, for review and consideration by the Government. The selection process for Phase One will evaluate such factors (not necessarily in order): Past Performance, and Design Experience. Following completion of the evaluation of Phase One, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase Two. An announcement with the expected date of issue of Phase Two will be placed on the Federal Business Opportunities (FedBizOps) website at https://www.fbo.gov. The selected offerors for Phase Two will be invited to submit additional information as will be described in Section 00 21 00 of the Solicitation, for review and evaluation by the Government. The selection process for Phase Two will evaluate such factors: Technical Approach and Price. Pro Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation.
DISCUSSIONS: The Government intends to award without discussions, but reserves the right to conduct discussion should it be deemed in the Government's best interest.
ANTICIPATED SOLICITATION RELEASE DATE:
The Government anticipates releasing the Phase One solicitation on or about 26 June 2019 and approximate closing date for Phase One is on or about 30 July 2019. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.
SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at Federal Business Opportunities website, http://www.fbo.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities website at http://www.fbo.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation.
REGISTRATIONS:
Offerors shall have and shall maintain an active registration in the following database:
System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.
POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist Tonja Dreke at tonja.j.dreke@usace.army.mil
Update #1 ·
DESCRIPTION:
The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue a Request for Proposal (RFP) W912HN19R3000 for the Fort Benning (RP 12-03) 8(a) Small Business Set-Aside, Design-Build Construction Single Award Task Order Contract (SATOC) in support of the MILCON and SRM program. Task Orders issued under this MATOC will be for work within the three-state region of Georgia, South Carolina, and North Carolina.
This Design-Build SATOC is to provide rapid response for General Construction: new construction, rehabilitation, maintenance or repair of situations relating, but not limited to, site work, mechanical systems, plumbing, utility systems, structural, electrical, HVAC, instrumentation, security and safety areas of Government facilities in a cost effective manner. Work requiring the use of civil funds is not allowed. Task orders for design only or demolition only shall not be placed against the Contract. Work may include, but is not limited to: vertical construction, roofs, anti-terrorism force protection of new and existing facilities, horizontal construction, and incidental work.
TYPE OF CONTRACT AND NAICS:
This acquisition will be offered as an 8(a) set-aside competitive solicitation and will result in one (1) Firm Fixed Price Indefinite Delivery Contract (IDC) Contract. The contract period of performance will not exceed five years (two (2) year base period and three 1 year options periods) with a total contract capacity of $95M. The order limitation of task orders issued under this SATOC will range between $500k and $5M and will be firm fixed price.
The North American Industry Classification System (NAICS) code is 236220-Commercial and Institutional Building Construction, with size standard of $36,500,000.
TYPE OF SET-ASIDE: This acquisition will be an 8(a) Small Business Set-Aside
CONSTRUCTION MAGNITUDE: In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $100,000,000.
SELECTION PROCESS: The proposals will be evaluated using a Best Value source selection process. This is a two-phase Design-Build procurement process. Potential offerors are invited to submit their performance and capability information as will be described in Section 00 21 00 of the Solicitation, for review and consideration by the Government. The selection process for Phase One will evaluate such factors (not necessarily in order): Past Performance, and Design Experience. Following completion of the evaluation of Phase One, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase Two. An announcement with the expected date of issue of Phase Two will be placed on the Federal Business Opportunities (FedBizOps) website at https://www.fbo.gov. The selected offerors for Phase Two will be invited to submit additional information as will be described in Section 00 21 00 of the Solicitation, for review and evaluation by the Government. The selection process for Phase Two will evaluate such factors: Technical Approach and Price. Pro Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation.
DISCUSSIONS: The Government intends to award without discussions, but reserves the right to conduct discussion should it be deemed in the Government's best interest.
ANTICIPATED SOLICITATION RELEASE DATE:
The Government anticipates releasing the Phase One solicitation on or about 26 June 2019 and approximate closing date for Phase One is on or about 30 July 2019. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.
SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at Federal Business Opportunities website, http://www.fbo.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities website at http://www.fbo.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation.
REGISTRATIONS:
Offerors shall have and shall maintain an active registration in the following database:
System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.
POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist Tonja Dreke at tonja.j.dreke@usace.army.mil
Files
| File | Type | Posted |
|---|---|---|
| B.08 Conformed 19R3000Ph2.pdf | ||
| B.08-MFR AMD 0007, 19R3000.pdf | ||
| B.08-AMD 0008 19R3000P2.pdf | ||
| B.08-AMD 0006 19R3000P2.pdf | ||
| B.08- 19R3000Ph2 Conformed Copy.pdf | ||
| B.08- AMD 0006 19R3000Ph2.pdf | ||
| 19R3000Ph2 Conformed Copy.pdf | ||
| B.08- AMD 0005 19R3000Ph2.pdf | ||
| amd2.pdf | ||
| 19R3000Ph1.PDF | ||
| Forms.docx | DOCX document | |
| amd1.pdf | ||
| 19R3000Ph1.PDF | ||
| 19R3000Ph1.PDF |
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| 8(a) Design-Build SATOC | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| $495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U. S. Army Corps of Engineers, Honolulu District | ENDIST Honolulu | Total Small Business | |
| Small Business D/B Military Construction MATOC | ENDIST Louisville | Total Small Business | |
| Vertical Construction MATOC | ENDIST Mobile | Total Small Business | |
| Fort Benning Job Order Contract | Department of the Army | Woman-Owned Small Business | |
| JB Charleston Multiple Award Construction Contract | Air Mobility Command | No set-aside |