6530--Project 405 CLC Activation; Patient Lifts
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C26221Q1195
- Agency
-
Veterans Integrated Service Network 22
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 339113 Surgical Appliance and Supplies Manufacturing
Notice details come from SAM.gov. Updated .
About this opportunity
The solicitation seeks proposals to supply patient lift equipment and related installation services for the Department of Veterans Affairs (VA) Long Beach Healthcare System located in Long Beach, California. The VA requires 74 ceiling lifts for patient bedrooms and bathrooms, 10 lifts for bathing suites, 10 bariatric lifts, 94 sling kits, and additional materials. Proposals are due by August 25, 2021. The successful bidder must deliver all equipment between October 1, 2021 and November 1, 2021, and will be responsible for on-site installation, assembly, training, and waste removal in accordance with the specified requirements and safety protocols.
The solicitation is a 100% Service-Disabled Veteran-Owned Small Business set-aside requiring vendors to be certified in VETBIZ.GOV. The goods and services include 74 ceiling lifts, 10 lifts for bathing suites, 10 bariatric lifts, 94 sling kits, and additional materials with a total place of performance at the VA Long Beach Healthcare System located in Long Beach, California. Installation must be completed by November 1, 2021 to support construction timelines. The solicitation incorporates salient technical standards for the patient lift equipment.
Notice text
3 versions
Update #3 · Latest ·
See attached SF-30 and Attachment entitled Questions and Answers
Update #2 ·
The VA Long Beach Healthcare System has a requirement to purchase with an authorized vendor to supply and deliver Patient Lifts for the VA Long Beach.
This is 100% SDVOSB Set-Aside, Must be registered in VETBIZ.GOV.
This Amendment adds proper formatting of the SOW and Salient Characteristics.
Update #1 ·
Page 6 of 6
Attachment A: SOW
VA Long Beach Healthcare System
Project 405 CLC
Equipment Package-Basis of Design (BOD)
Statement of Work/Salient Characteristics
Introduction
The VA Long Beach Healthcare System has a requirement to purchase with an authorized vendor to supply and deliver the item(s) identified in Table 1 below. This requirement is in support of a brand name or equal requirement. See VAAR Clause 852.211-73 Brand Name or Equal (JAN 2008) for additional information. See attachments for salient characteristics. This requirement is in support of the activation of the VA Long Beach Healthcare System Project. Item(s) are to be delivered to the location specified in section 2.4.1.
Table 1 Package Items Summary
Item Number
Item Description
Quantity
A1205
Ceiling lift, pt bedroom & bathroom
74
A1205A
Ceiling lift, Bathing Suite
10
A1203
Overhead ceiling lift, bariatric, pt bedroom and bath
10
A1205B
Patient lift materials
94
A1205 C
Sling kit
94
Training
94
A1205D
Approved Engineering & drawings
1
General Conditions
Site Address
The address of the VA Long Beach Healthcare System is listed below. Additional information on delivery is located in section 2.4.
VA Long Beach Healthcare System
5901 E. 7th Street
Building 149
Long Beach, CA 90822
Delivery Schedule
Items shall be delivered no earlier than the estimated delivery start date and no later than the delivery end date listed in Table 2 below.
Table 2 Anticipated Building Outfitting Schedule
Building Name
Building # & Letter
Acronym
Est. Delivery Start Date
Est. Delivery End Date
VA Long Beach Healthcare System
Bldg 170
VALB CLC
10/1/2021
11/1/2021
Schedule and Order Management
The above delivery schedule is based upon the current construction schedule. The vendor shall not increase prices for a change in delivery date for up to 30+ days due to construction delays.
The awardees actual delivery dates will be confirmed by VA upon award.
Post-award the vendor will coordinate delivery prior to beginning any work (see section 2.4). Once the dates have been confirmed, modifications to the schedule are subject to written approval by the COR and the vendor. Schedule changes that are beyond the dates specified in the contract will require approval by the Contracting Officer and a contract modification.
Delivery and Receiving
Delivery and receipt of the proposed items is anticipated to be directed to the location identified below. Confirmation of delivery location will be provided post-award. To coordinate delivery, contact Brian Fleenor Brian.Fleenor@va.gov 563-7 43-9263 or Vickie Orloff at (714) 904-8850, Victoria.Orloff@va.gov
VA Long Beach Healthcare System (VALBHCS) Direct Delivery to address detailed in paragraph 2.1.1)
IOT&A Contractor-Provided Warehouse Local to the VALBHCS
Delivery shall be freight on board (FOB) Destination.
The vendor is required to define the need for a staging area to accommodate item delivery, if needed. Post-award, this information will be confirmed with the vendor.
The delivery of items identified in this document shall take place during normal business hours which are defined as: 0800 to 1630 (i.e.: 8:00am to 4:30pm Pacific Standard Time), Monday through Friday, and excluding Federal Holidays.
Delivery trucks will not be permitted to remain at the loading dock. Trucks shall be unloaded, moved from the dock, and then brought back to the dock if required to haul out any waste, tools, or excess materials.
Labeling of delivered items shall include the VA facilities contract number and VA purchase order number for identification and reference upon receipt of product.
Use of Warehouse
If the vendor requires the use of the Government s activation contractor s warehouse to meet the requirements of this contract the vendor must provide a certificate of insurance prior to the delivery and offloading of the item(s). This insurance certificate must be completed and presented to the activation contractor prior to delivery.
The vendor shall communicate through the VA POC any required coordination requirements.
Clean Up and Disposal
There are no dumpsters available for vendor use.
The removal of waste and/or excess material shall be conducted through the loading dock area. Delivery trucks and/or other vendor vehicles will not be permitted to remain at the loading dock. Vehicles will need to be brought back to the dock if required to remove any waste, tools, or excess materials.
Deliverables
The vendor shall perform a site walk provide CAD drawings (including shop drawings) and specifications for site prep for their product as required.
The vendor shall provide a completed VA Form 6550 with submittal documents for any and all item(s) that may connect to the VA network and medical devices that store sensitive patient information.
Assembly and Installation
The vendor is required to manage and coordinate installation at the VALB with the COR.On-site assembly and installation of items, and performance of services identified in this document shall take place during normal business hours which are defined as: 0800 to 1630 (i.e.: 8:00am to 4:30pm Pacific Standard Time), Monday through Friday, and excluding Federal Holidays.The vendor is required to define the need for a staging area to accommodate item assembly and installation, if needed. Post-award, this information will be confirmed with the vendor.The vendor is required to provide tools, labor and materials to complete assembly and installation of the items detailed in this document.
The vendor shall protect all finished spaces and surfaces as required from delivery and installation damage. The vendor shall use covering and protection to the extent necessary to prevent damage to finished spaces. Any damage occurred during delivery and installation is the responsibility of the vendor. The vendor will be responsible for paying for and repairing any damage or noted deficiencies to finished spaces and surfaces that occur as a result of the vendor s (or associated sub-contractors) installation.
The vendor shall protect all finished spaces and surfaces as required from delivery and installation damage. The vendor shall use covering and protection to the extent necessary to prevent damage to finished spaces. Any damage occurred during delivery and installation is the responsibility of the vendor. The vendor will be responsible for paying for and repairing any damage or noted deficiencies to finished spaces and surfaces that occur as a result of the vendor s (or associated sub-contractors) installation.
During the entire duration of assembly and installation, the vendor will have a competent representative on-site as the vendor s contact, and to serve as the interface between the vendor and VALB. On-site representative can be the installer. All instructions provided from COR to the representative will be binding as if given to the vendor s main contact. The COR may provide specific instructions, however, only the Contracting Officer may change the terms or conditions of the contract.
The vendor shall coordinate through the VA POC to provide a hands-on training session to staff selected by the VA. Training shall be completed within 45 days after final installation of equipment. The vendor will record the training and provide a copy of the training to the VA POC for VA to use to train additional personal at a future date. In addition, the vendor shall provide additional training documents to the VA POC for training additional persons at a future date.
2.87 COVID-19:
Vendors will wear face masks when on the VA Long Beach Campus and practice 6 feet social
distancing. Contractors will be required to enter the hospital through the designated entry
points and will be screened for CoVid 19
Use of Premises
During the performance of this contract, work will be carried out on VALB premises. The vendor will perform all work in such a manner that will cause a minimum interference with VALB operations and the operations of other contractors on the premises.
The vendor will communicate through the VA POC any required coordination requirements with the GC prior to and during delivery and installation activities.
The project may be an active construction site during delivery and installation. The vendor will take all necessary precautions to protect the premises and all persons and property therein from damage or injury. The vendor will assume responsibility for taking precautions for the vendor's (and associated subcontractors ) employees, agents, licensees, and permittees. The vendor shall abide by any safety requirements imposed by the GC (e.g. hard hats, safety vests).
VA Long Beach 405
A1205
5901 E. 7th Street
Long Beach, CA 90822
_
Project: VA Long Beach 405
_
Total Quantity: 74
Finish Sample Required if Checked Manufacturer Certified Installation Required if Checked
_
BMET Training Required if Checked End User Training Required if Checked
_
_
Item Name: Ceiling lift with traverse rail H pattern, to connect to H -pattern ceiling lift in Patient bathrooms
Include Scale
Brand Name or Equal: Guldmann GH3+ w 550 lb. capacity
Ceiling track System to be flush with ceiling in patient rooms:
Salient Characteristics:
The Ceiling Track shall be made from high strength extruded aluminum or VA approved equal
Provide anchor supports at ceiling substrate.
Installed rail shall be security tested for 1.5 times greater than the motor s weight capacity and maximum allowable deflection of a horizontal rail is no more than 1mm (1/16th inch) per 200mm (7.87 inch) of track length. (As per ISO 10535 standards.)
Top of traverse rail shall be 2 5/8 below ceiling in rooms with Avasure
Lift Battery: 24 V NiMH
- Max charge time: 4 hours
- Battery protection: At battery voltage
below 22 V the indicator light turns
orange. The hoist is stopped if the voltage
falls below 20 V
- Power supply: 33 V AC, 2.5 A
- Supply voltage, transformer: 100-240V AC
- Max. # of lift: 40/ 40 w/ 550 lb/ 40
- Intermittent: 10.90, 4 Hours
- Include hand control
- Include emergency brake, lowering device
and stopping device
- Include current limiter for circuit
protection in case of overload
- Charging time no more than 4 hours
A1205C
Straps & Sling:
- One lifting strap to meet ISO 10535,
Appendix A guidelines.
- The straps shall ensure the patient s
safety by preventing the patient from
falling out of the sling.
- The sling shall meet ISO 10535, Appendix
A guidelines.
- The sling shall cradle the body of the
patient.
Training: Included
Main Image:
VA Long Beach 405
A1025A
5901 E. 7th Street
Long Beach, CA 90822
_
Project: VA Long Beach 405
_
Total Quantity:10
Finish Sample Required if Checked Manufacturer Certified Installation Required if Checked
_
BMET Training Required if Checked End User Training Required if Checked
_
_
Item Name: Ceiling lift with traverse rail H pattern, full room All Bathing Suites
_
Brand Name or Equal: Guldmann GH3+
Ceiling track System to be flush with ceiling
Salient Characteristics:
The Ceiling Track shall be made from high strength extruded aluminum or VA approved equal
Provide anchor supports at ceiling substrate.
Installed rail shall be security tested for 1.5 times greater than the motor s weight capacity and maximum allowable deflection of a horizontal rail is no more than 1mm (1/16th inch) per 200mm (7.87 inch) of track length. (As per ISO 10535 standards.)
Top of traverse rail shall be 2 5/8 below ceiling in rooms with Avasure
Lift Battery: 24 V NiMH
- Max charge time: 4 hours
- Battery protection: At battery voltage
below 22 V the indicator light turns
orange. The hoist is stopped if the voltage
falls below 20 V
- Power supply: 33 V AC, 2.5 A
- Supply voltage, transformer: 100-240V AC
- Max. # of lift: 40/ 40 w/ 550 lb/ 40
- Intermittent: 10.90, 4 Hours
- Include hand control
- Include emergency brake, lowering device
and stopping device
- Include current limiter for circuit
protection in case of overload
- Charging time no more than 4 hours
A1205C
Straps & Sling:
- One lifting strap to meet ISO 10535,
Appendix A guidelines.
- The straps shall ensure the patient s
safety by preventing the patient from
falling out of the sling.
- The sling shall meet ISO 10535, Appendix
A guidelines.
- The sling shall cradle the body of the
patient.
Training: Included
Main Image:
VA Long Beach 405
A1203
35901 E. 7th Street
Long Beach, CA 90822
_
Project: VA Long Beach 405
_
Total Quantity: 10
Finish Sample Required if Checked Manufacturer Certified Installation Required if Checked
_
BMET Training Required if Checked End User Training Required if Checked
_
_
Item Name: Ceiling lifts, Bariatric : Ceiling lift with traverse rail H pattern, to connect to H -pattern ceiling lift in Patient bariatric bathrooms
_
Brand Name or Equal: Guldmann GH3 twin
Ceiling track System with dual track and twin motors to be flush with ceiling in patient rooms:
Salient Characteristics:
_
The Ceiling Track shall be made from high strength extruded aluminum or VA approved equal. Provide anchor supports at ceiling substrate.
Installed dual rail shall be security tested for 1.5 times greater than the motor s weight capacity and maximum allowable deflection of a horizontal rail is no more than 1mm (1/16th inch) per 200mm (7.87 inch) of track length. (As per ISO 10535 standards.)
Lift Battery: 2X 24 V NiMH
- Max charge time: 4 hours
- Battery protection: At battery voltage
below 22 V the indicator light turns
orange. The hoist is stopped if the
voltage falls below 20 V
- Power supply: 33 V AC, 2.5 A
- Supply voltage, transformer: 100-240V
AC
- Max. # of lift: 40/ 40 w/ 1100 lb/ 40
- Intermittent: 10.90, 4 Hours
- Include hand control
- Include emergency brake, lowering
Device and stopping device
- Include current limiter for circuit
protection in case of overload
- Charging time no more than 4 hours
Top of traverse rail shall be 2 5/8 below ceiling in rooms with Avasure.
A1205C
Straps & Sling:
- One lifting strap to meet ISO 10535,
Appendix A guidelines.
- The straps shall ensure the patient s
safety by preventing the patient from
falling out of the sling.
- The sling shall meet ISO 10535, Appendix
A guidelines.
- The sling shall cradle the body of the
patient.
Main Image:
Training: Included
VA Long Beach 405 A1205B
5901 E. 7th Street
Long Beach, CA 90822
_
Project: VA Long Beach 405
_
Total Quantity: 10
Finish Sample Required if Checked Manufacturer Certified Installation Required if Checked
_
BMET Training Required if Checked End User Training Required if Checked
_
_
Item Name: Ceiling lift additional materials:Miscellaneous flush ceiling profile, Spring plates, Rosettes
Salient Characteristics: Parts and pieces necessary to install lifts as designed.
VA Long Beach 405
A1025C
5901 E. 7th Street
Long Beach, CA 90822
_
Project: VA Long Beach 405
_
Total Quantity: 94
Finish Sample Required if Checked Manufacturer Certified Installation Required if Checked
_
BMET Training Required if Checked End User Training Required if Checked
_
_
Item name: Sling kit
Salent Characteristics:
-Sling must have a lifting capacity of up to 560 lbs
-Sling must be of a breathable material, like polyester/mesh or cotton
Files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| S0236C26221Q1195 0001.docx | DOCX document | |
| 36C26221Q1195_2.docx | DOCX document | |
| S02-Soliciation .pdf | ||
| ATTACHMENT A SOW.pdf | ||
| 36C26221Q1195_1.docx | DOCX document | |
| S02.pdf | ||
| 36C26221Q1195.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 6530--600-21-3-392-0314 Attn: Shavon Bogan, Project 405 CLC Activation; Patient Lifts (VA-21-00062918) VA Long Beach Activation; Patient Lifts | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| V999--Equipment Transportation Services | Veterans Integrated Service Network 22 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity