6145--Install OR Isolation Power and Upgrade Critical (VA-24-00006336)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24624B0004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to provide construction services for the installation of operating room isolation power and upgrading of critical panels at the Hampton VA Medical Center in Hampton, Virginia. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 will evaluate proposals submitted in response to plans and specifications included with the solicitation notice. Electronic bids are due by February 27, 2024 at 5:00PM EST, with bid opening to be held virtually on February 29, 2024 at 11:00AM.

The opportunity is set aside 100% for total service-disabled veteran-owned small businesses. The projected award value is between $1 million and $5 million. Work will involve installing isolation power and upgrading critical panels in Building 110A of the Hampton VA Medical Center according to included drawings and specifications, with an estimated value of $6,145. The NAICS code is 238210 and PSC code R499. The period of performance involves alterations, construction and electrical upgrades with all work to be completed by December 2024.

Notice text

3 versions

Update #3 · Latest ·

The purpose of this amendment is to extend the hour and date for the bid submission date specified on the RFP to March 12th, 2024 at 5:00 PM EST.

Update #2 ·

Is this project sales tax exempt? If the project is sales tax exempt, can the Government provide a sales tax exemption certificate?

A: The tax exemption for this is not authorized. You will have to pay sales tax.

Can the required SSHO and QA/QC positions be fulfilled by the qualified superintendent?

A: There is a reason for having SSHO, QA and a Site Superintendent as individuals. If there is a safety issue, the Super would have to write himself up and it usually is not very effective. Same goes for QA. If he finds the wrong material being used, he d have to write himself up for allowing that to happen.

The Project requires hard ICRA barriers but cannot tie into existing duct work for neg air/hepa ventilation. Is the Government going to specify where we can vent?

A: The way you ll vent is up to you in your proposed solutions. The Gov t will not specify where to vent.

Can the VA clarify requirements to work in the OR? For example, will the workers have to wear operating room clothing covers, head covers, and shoe covers during work.

A: The OR space given to the contractor to work nights/weekends will be the contractor s space. You will not need to gown up once inside this area to get the panels/receptacles installed.

Will the Owner accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project?

A: We have no issue with ProCore. We use Submittal Exchange and ProCore for managing other projects.

How soon after the award is NTP expected to be issued?

A: We are aiming for a post-award meeting, to include issuing the NTP, no later than two weeks after the bid opening date of 2/29/24.

The SF 1442, page 1, states that electronic bids are due by 2/27/24 at 5 pm, however, RFP page 7, #3 states that electronic bids are due no later than 5 pm EDT one (1) day prior to the established Bid Opening Date identified. Please confirm the correct due date and time for electronic bids.

A: Electronic bids are due by 2/27.24 at 5PM EST.

RFP, page 3, Supplement B Statement of Work references Bid Item 1 and Bid Item 2 (Deduct Alternate 1), however, the specs on pages 3-4 reference Bid Items I and II, and Alternates Deducts 1, 2 and 3. Please confirm the correct Bid Items and Alternate Deducts

A: The correct bid items are references Bid Item 1 and Bid Item 2 (Deduct Alternate 1), as referenced in the SOW in Supplement B.

Please provide the Microsoft Teams information for the virtual bid opening on 2/29/24 at 11 am.

A: A meeting invite will be sent to all parties who submit a proposal on time. Expect an invite the morning of 2/28/24.

Since the proposed work schedule has been changed to primarily weekday night hours, is there a corresponding change for this NOTE? Are these two barriers even still necessary?

A: The detail showing temporary dust barriers near stairway 7 are only there for doing work to install the panel for the isolation power for the laser receptacles yes they re required. If this work is finished in one weekend, the walls can come down.  If this cannot be done on one shift, they would remove them at the end of the shift. If this were me doing the work, I d plan it for starting on a Friday and finishing the work over a weekend and then the dust barriers are removed for the rest of the contract.

Who is responsible for providing clean room apparel, such as suits, shoe covers, etcetera?

A: The VA will not provide gowns. They need to be properly gowned to get into their workspace each day. Once inside, they don t have to stay gowned.

Is the use a self-contained dust collection system an acceptable alternative to utilizing exhaust ducting out of the building?

A: We must have negative air scrubbing machines in the work environment. This can only be done w/ hepafiltered exhaust fans. They will exhaust this filtered air to the outside.

Update #1 ·

Scope: Provide construction services, alterations necessary for the installation of Operating Rooms isolation power and upgrading of critical panels in Bldg. 110A per included plans and specifications at Hampton, Hampton, VA Veterans Affair Center.

Files

File Type Posted
36C24624B0004 0002.docx DOCX document
36C24624B0004 0001.docx DOCX document
WAGE-RATES.docx DOCX document
100pct Construction Drawing.pdf PDF
100 pct Combined Specs install OR Isolation power.pdf PDF
36C24624B0004 IFB.docx DOCX document

Notice history

Notice Type Posted
Z1DA--Install OR Isolation Power Award Award Notice
This notice Latest solicitation Solicitation
6145--Install OR Isolation Power and Upgrade Critical (VA-24-00006336) Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z1DA--Sources Sought Notice/Market Research Project: Renovate SPS Phase 3 Central Virginia VA Healthcare System Cvhcs Richmond Virginia 23249 · NAICS 236220 Veterans Integrated Service Network 6 No set-aside
Y1DA--590-27-120 Replace Pneumatic Tube System Department of Veterans Affairs Hampton, Virginia 23667, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B East Orange, New Jersey 07018, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Durham, North Carolina 27705, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
N048-- B41 Isolation Valve Installation Department of Veterans Affairs Veterans Health Administration North Little Rock AR 72114 · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors