100pct Construction Drawing.pdf

PDF 5 MB Posted

Attached to
6145--Install OR Isolation Power and Upgrade Critical (VA-24-00006336)
Solicitation number
36C24624B0004
Issued by

About this file

This document package includes 100% construction drawings and specifications for upgrades to electrical panels and installation of isolation power at the Hampton VA Medical Center in Hampton, Virginia. The scope of work involves upgrading critical panels and installing operating room isolation power in Building 110A according to the plans. Drawings provide demolition plans, floor plans, reflected ceiling plans, details, schedules and notes for electrical and architectural work.

The related federal contract opportunity is a solicitation to provide construction services for the upgrades. Solicitation number 36C24624B0004 was issued by the Department of Veterans Affairs Veterans Health Administration VISN 6 for work at the Hampton VA Medical Center. The estimated value is $6,145 for installing isolation power and upgrading critical panels in Building 110A per the included plans and specifications. The response due date is not provided.

View the file

Other files

File Type Posted
36C24624B0004 0002.docx DOCX document
36C24624B0004 0001.docx DOCX document
WAGE-RATES.docx DOCX document
36C24624B0004 IFB.docx DOCX document
100 pct Combined Specs install OR Isolation power.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALL OR ISOLATION POWER AND UPGRADE

CRITICAL PANELS BLDG 110A

100% CONSTRUCTION DOCUMENTS

AT VAMC HAMPTON

100 EMANCIPATION DRIVE, HAMPTON, VA 23667

PROJECT

LOCATION

DRAWING TITLEDWG

NO.

Index of Drawings

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

COVER SHEET

G001

ARCHITECTURAL LEGEND

ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL ABBREVIATIONS

1.

2.

3.

4.

5.

6.

7.

9.

10.

a.

b.

c.

GENERAL SAFETY NOTES

MATERIAL LEGEND

COVID-19 PROTOCOL

NOTES ABBREVIATIONS AND

LEGENDS

GOO2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08-06-2021 TS PFRevisions: Date:

PHASING PLAN

GENERAL DEMOLITION NOTES

DEMOLITION KEY NOTES

DEMOLITION PLAN LEGEND

DEMOLITION PLAN

AD101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

LEGEND

FLOOR PLAN GENERAL NOTES

FLOOR PLAN KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08-06-2021 TS PFRevisions: Date:

THIRD FLOOR - BLDG 110A

A101

REFLECTED CEILING PLAN

GENERAL NOTES

LEGEND

KEY NOTES

PARTIAL 3RD FLOOR RCP

A201

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A

DETAIL GENERAL NOTES

DETAILS

A501

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A

LEGEND

ANTEROOM GENERAL NOTES

FLOOR PLAN KEY NOTES

ANTEROOM PLANS

A502

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A

RAM

PS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

LEGEND, NOTES, AND RISER -

ELECTRICAL

E001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

DEMOLITION PLAN -

POWER

ED101

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

NEW WORK PLAN -

E101

TEL/COMM

GC-108

GC-107

ELEC RM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

NEW WORK PLAN - B.110 GROUND FL -

E102

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

PANELBOARD SCHEDULES

E601

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Install OR Isolation Power and Upgrade Critical Panels Building 110A

Hampton VA Medical Center

590-20-102

110A Project Director

08/06/2021 RBP WDERevisions: Date:

PANELBOARD SCHEDULES

E602

File details come from the government source that posted it. Updated .