This document contains a federal wage determination applicable to federal construction contracts in Hampton, Virginia.

The wage determination sets the minimum wages to be paid to various classifications of workers involved in building construction projects for the federal government in Hampton. Covered classifications include asbestos workers, boilermakers, bricklayers, carpenters, electricians, elevator mechanics, ironworkers, laborers, operating engineers, painters, pipefitters, plumbers and truck drivers. For each classification, the wage determination provides the required minimum hourly wage as well as any fringe benefit amounts. The wage determination is effective until superseded and includes three modifications with the most recent dated December 15, 2023. Additional details are provided on coverage under various executive orders setting minimum wage rates for federal contractors.

View the file

Other files

File Type Posted
36C24624B0004 0002.docx DOCX document
36C24624B0004 0001.docx DOCX document
36C24624B0004 IFB.docx DOCX document
100pct Construction Drawing.pdf PDF
100 pct Combined Specs install OR Isolation power.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: VA20230022 12/15/2023Superseded General Decision Number: VA20220022State: VirginiaConstruction Type: BuildingCounty: Hampton* County in Virginia.

* INDEPENDENT CITY

BUILDING CONSTRUCTION PROJECTS (does not include single familyhomes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generallyrequired to pay at least the applicable minimum wage raterequired under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to coveredcontracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply tocontracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least |

|30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. | The applicable Executive Order minimum wage rate will beadjusted annually. If this contract is covered by one of theExecutive Orders and a classification considered necessary forperformance of work on the contract does not appear on thiswage determination, the contractor must still submit aconformance request.

Additional information on contractor requirements and workerprotections under the Executive Orders is available athttp://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 12/15/2023

ASBE0024-006 04/01/2021

Rates FringesASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2021

Rates FringesBOILERMAKER......................$ 42.62 24.81----------------------------------------------------------------

BRVA0008-001 05/01/2022

Rates FringesBRICKLAYER.......................$ 22.44 10.23----------------------------------------------------------------

ELEC1340-001 12/01/2022

Rates FringesELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 31.30 8.5%+6.35----------------------------------------------------------------

ELEV0052-005 01/01/2023

Rates FringesELEVATOR MECHANIC................$ 47.72 37.335+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 05/01/2022

Rates FringesPOWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12

IRON0079-012 05/01/2022

Rates FringesIRONWORKER, STRUCTURAL AND ORNAMENTAL.......................$ 28.87 11%+14.24----------------------------------------------------------------

IRON0079-013 05/01/2022

Rates FringesIRONWORKER, RIGGER...............$ 28.87 11%+14.24----------------------------------------------------------------

* PLUM0110-008 11/01/2023

Rates FringesPIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 33.67 17.50PLUMBER..........................$ 33.67 17.50----------------------------------------------------------------

* SUVA2013-037 01/11/2016

Rates FringesCARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 18.50 0.00

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 17.48 0.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 13.48 ** 3.27 LABORER: Mason Tender -

Cement/Concrete..................$ 12.96 ** 3.12 LABORER: Pipelayer..............$ 12.40 ** 1.96 LABORER: Common or General, Including Demolition.............$ 12.14 ** 1.60

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.69 1.35 OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03 OPERATOR: Bulldozer.............$ 18.07 3.50 OPERATOR: Forklift..............$ 19.40 7.00 OPERATOR: Loader................$ 21.28 3.17 OPERATOR: Roller................$ 16.25 4.88 PAINTER (Brush and Roller).......$ 16.87 0.00 PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80 SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performingoperation to which welding is incidental.

** Workers in this classification may be entitled to a higherminimum wage under Executive Order 14026 ($16.20) or 13658($12.15). Please see the Note at the top of the wagedetermination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leavefor Federal Contractors applies to all contracts subject to theDavis-Bacon Act for which the contract is awarded (and anysolicitation was issued) on or after January 1, 2017. If thiscontract is covered by the EO, the contractor must provideemployees with 1 hour of paid sick leave for every 30 hoursthey work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for theirown illness, injury or other health-related needs, includingpreventive care; to assist a family member (or person who islike family to the employee) who is ill, injured, or has otherhealth-related needs, including preventive care; or for reasonsresulting from, or to assist a family member (or person who islike family to the employee) who is a victim of, domesticviolence, sexual assault, or stalking. Additional informationon contractor requirements and worker protections under the EOis available athttps://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included withinthe scope of the classifications listed may be added afteraward only as provided in the labor standards contract clauses(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classificationand wage rates that have been found to be prevailing for thecited type(s) of construction in the area covered by the wagedetermination. The classifications are listed in alphabeticalorder of ""identifiers"" that indicate whether the particularrate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate(weighted union average rate).

Union Rate IdentifiersA four letter classification abbreviation identifier enclosedin dotted lines beginning with characters other than ""SU"" or""UAVG"" denotes that the union classification and rate wereprevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier ofthe union which prevailed in the survey for thisclassification, which in this example would be Plumbers. 0198indicates the local union number or district council numberwhere applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processingthe wage determination. 07/01/2014 is the effective date of themost current negotiated rate, which in this example is July 1,2014.

Union prevailing wage rates are updated to reflect all ratechanges in the collective bargaining agreement (CBA) governingthis classification and rate.

Survey Rate IdentifiersClassifications listed under the ""SU"" identifier indicate thatno one rate prevailed for this classification in the survey andthe published rate is derived by computing a weighted averagerate based on all the rates reported in the survey for thatclassification. As this weighted average rate includes allrates reported in the survey, it may include both union andnon-union rates. Example: SULA2012-007 5/13/2014. SU indicatesthe rates are survey rates based on a weighted averagecalculation of rates and are not majority rates. LA indicatesthe State of Louisiana. 2012 is the year of survey on whichthese classifications and rates are based. The next number, 007in the example, is an internal number used in producing thewage determination. 5/13/2014 indicates the survey completiondate for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until anew survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicatethat no single majority rate prevailed for thoseclassifications; however, 100% of the data reported for theclassifications was union data. EXAMPLE: UAVG-OH-001008/29/2014. UAVG indicates that the rate is a weighted unionaverage rate. OH indicates the state. The next number, 0010 inthe example, is an internal number used in producing the wagedetermination. 08/29/2014 indicates the survey completion datefor the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January ofeach year, to reflect a weighted average of the currentnegotiated/CBA rate of the union locals from which the rate isbased.

WAGE DETERMINATION APPEALS PROCESS1.) Has there been an initial decision in the matter? This canbe:

* an existing published wage determination* a survey underlying a wage determination* a Wage and Hour Division letter setting forth a position on a wage determination matter* a conformance (additional classification and rate) rulingOn survey related matters, initial contact, including requestsfor summaries of surveys, should be with the Wage and HourNational Office because National Office has responsibility forthe Davis-Bacon survey program. If the response from thisinitial contact is not satisfactory, then the process describedin 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formalprocess described here, initial contact should be with theBranch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 202102.) If the answer to the question in 1.) is yes, then aninterested party (those affected by the action) can requestreview and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210The request should be accompanied by a full statement of theinterested party's position and by any information (wagepayment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, aninterested party may appeal directly to the AdministrativeReview Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 202104.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"