5-Ton Electric Arc Furnace Project

Closed Solicitation Posted

Solicitation number
W519TC26RA0530001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Rock Island, Illinois 61299, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Contracting Command – Rock Island (ACC-RI) seeks detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training, and procurement of one 5-ton Electric Arc Furnace, modernization of one 5-ton Electric Arc Furnace and one 5-ton AOD system, with proposals due July 31, 2026. This is a sole-source, firm-fixed-price procurement under FAR Parts 12 and 15, intended for Tenova.

Place of performance is Rock Island, Illinois (Building 299, Gillespie Avenue and Beck Lane). The NAICS code is 333994, Industrial Process Furnace and Oven Manufacturing, with a 500-employee small business size standard; PSC is 4430.

Scope includes three primary options: upgrade and modernization of the existing 5-ton EAF with electrode regulation, hydraulic, and automation/control system upgrades; demolition of the existing 3-ton EAF and installation of a replacement 5-ton EAF with full electrical, mechanical, hydraulic, electrode regulation, and automation components; and installation of a new 5-ton AOD system with traveling platform, process control rack, oxygen lance, fume hood, and refractory materials. All equipment must be new, unused, and manufactured to OSHA, ASTM, ASME, ANSI, NEMA, NFPA, IEEE, and AWS standards. The contractor must coordinate utility connections (460V/60Hz/3-phase electrical, 80-psi compressed air, 65-psi water, 1.5-inch natural gas), provide site inspection, installation supervision, performance testing, and final acceptance. Training must cover five operators, two programmers, two maintenance personnel, and four methods division personnel, conducted on-site no later than 6:30 a.m. CST through 2:15 p.m. CST. Post-delivery service requires staffed English-speaking personnel, telephone consultation during RIA working hours (8:00 a.m. to 3:00 p.m. CST Monday–Friday), on-site response within 48 hours, and stocked maintenance parts.

Estimated delivery dates are September 30, 2027 (base item), March 30, 2028 (first option), and September 29, 2028 (second option). FOB Destination applies; contractor bears transportation costs. All personnel must comply with Rock Island Arsenal security requirements, including background checks, anti-terrorism training, RAMP participation, personal identity verification, and facility access screening.

Notice text

U.S. Army Contracting Command - Rock Island (ACC-RI) has a requirement to provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc Furnace, modernization of (1) 5-Ton Electric Arc Furnace and (1) 5-ton AOD system.

Files

File Type Posted
Attachment 0001 RIPD Foundry EAF _AOD.pdf PDF
Solicitation- W519TC26RA0530001.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Deep Pit Furnace Rock Island, Illinois 61299, United States · NAICS 333994 ACC Rock Island Total Small Business
NG SEW-electrical components Rock Island, Illinois 61299, United States · NAICS 335999 ACC Rock Island Total Small Business
Custom R&D Industrial Furnace Illinois 60439, United States · NAICS 333994 Office of Science No set-aside
Automated Fluidized Bed Mixer Facility Modernization for end use at Pine Bluff Arsenal – CSO Pine Bluff, Arkansas, United States · NAICS 333248 ACC Rock Island No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors