About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center seeks design and construction of a 1,200 square foot (30' x 40') enclosed mezzanine with modular office spaces in Building 238 at Hill Air Force Base, Utah, with proposals due August 18, 2026, at 1500 Mountain Time. The procurement is set-aside for small business concerns under NAICS 236210, Industrial Building Construction.
Place of performance is Building 238, South Center, Hill AFB, UT 84056. The scope comprises three contract line items: design of the mezzanine, construction, and frame-and-finish work. The mezzanine will accommodate an office, break room with double-basin sink and kitchenette cabinetry, and a multi-purpose computer lab and meeting space. The design must prioritize a maximum of nine support columns bolted to existing concrete with no new footings preferred; if infeasible or cost-prohibitive, the contractor must propose reasonable alternatives or dual-option proposals. Minimum clear height of 11 feet below the mezzanine on the ground floor is required. All steel must be painted light grey using industrial-grade materials. Interior finishes include carpet tiles in the office area and luxury vinyl plank flooring in the break room. Electrical scope includes three dedicated circuits for refrigerators and four for microwaves, Cat6 data runs to designated computer locations, and LED lighting with dimmer switches throughout both levels. The contractor shall stub out plumbing supply and drain lines; the government will complete final plumbing connections and fire suppression systems. All work must comply with Unified Facility Criteria, Hill Air Force Base Facility Design Standards, and applicable local and national building, electrical, plumbing, mechanical, and fire safety codes. Delivery is due within 120 days after receipt of order, FOB Destination. The estimated project value ranges between $100,000 and $500,000; performance and payment bonds at 100% of contract price are required for awards exceeding $150,000. Davis-Bacon wage rates apply. A mandatory site visit was held July 14, 2026. Evaluation weighs technical adherence, price, and past performance. Offerors must maintain active SAM.gov registration and provide a CAGE code. Contractor access requires an escort pass.
Notice text
8 versions
Update #8 · Latest ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
9 June: Updated to include updated drawnings for the mezzanine site & extended due date to 25 June.
22 June: Updated to extend due to to 10 July & Questions period to 2 July to accomdate new questions.
7 July 2026: Updated to extend due date to 22 July 2026; Questions will now be accepted until 17 July. Update also includes date for new site visit on 14 July 2026 at 0900. RSVP NLT 1500 on 10 July. Further details will be provided upon RSVP. Update also includes question responses and updated SOW for the project.
17 July 2026: Extending due date to 3 August to allow time to answer RFIs received after 14 July site visit. Additional questions will not be accepted at this time.
05 August 2026: The most up to date questions and responses have been uploaded. New due date to submit quotes/updated quotes will be 18 August 2025 at 1500 Mountain Time.
Update #7 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
9 June: Updated to include updated drawnings for the mezzanine site & extended due date to 25 June.
22 June: Updated to extend due to to 10 July & Questions period to 2 July to accomdate new questions.
7 July 2026: Updated to extend due date to 22 July 2026; Questions will now be accepted until 17 July. Update also includes date for new site visit on 14 July 2026 at 0900. RSVP NLT 1500 on 10 July. Further details will be provided upon RSVP. Update also includes question responses and updated SOW for the project.
17 July 2026: Extending due date to 3 August to allow time to answer RFIs received after 14 July site visit. Additional questions will not be accepted at this time.
Update #6 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
9 June: Updated to include updated drawnings for the mezzanine site & extended due date to 25 June.
22 June: Updated to extend due to to 10 July & Questions period to 2 July to accomdate new questions.
7 July 2026: Updated to extend due date to 22 July 2026; Questions will now be accepted until 17 July. Update also includes date for new site visit on 14 July 2026 at 0900. RSVP NLT 1500 on 10 July. Further details will be provided upon RSVP. Update also includes question responses and updated SOW for the project.
Update #5 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
9 June: Updated to include updated drawnings for the mezzanine site & extended due date to 25 June.
22 June: Updated to extend due to to 10 July & Questions period to 2 July to accomdate new questions.
Update #4 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
9 June: Updated to include updated drawnings for the mezzanine site & extended due date to 25 June.
Update #3 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
9 June: Updated to include updated drawnings for the mezzanine site.
Update #2 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
5 June: Updated to solicitation to include photos from site & extend due date.
Update #1 ·
When sending email correspondance for this project to SSgt Ruano Gutierrez AND Hideo Mera please include the notice ID and project name in the subject line of the email.
Files
| File | Type | Posted |
|---|---|---|
| 15340 - Additional Contractor Questions n Answers.docx | DOCX document | |
| 15340 - Contractor Questions n Answers.pdf | ||
| 15340 - 238 Mezzanine and Modular Office SOW - Updated.pdf | ||
| 15340 - Updated Drawings.jpeg | JPEG file | |
| IMG_0607 2.jpg | JPG image | |
| IMG_0606.jpg | JPG image | |
| IMG_0608.jpg | JPG image | |
| 15340 - 238 Mezzanine Modular Office Combo.pdf | ||
| 15340 - 238 Mezzanine and Modular Office SOW.pdf | ||
| 15340 - 238 Mezzanine and Modular Office SOW.docx | DOCX document | |
| 15340 - 238 Mezzanine Modular Office Combo.docx | DOCX document |
Show all 11
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) | |
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business | |
| Winter Snow Removal Hill, AFB (309th SWEG) | Air Force Sustainment Center | Total Small Business | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity