zS02 St Pete Perimeter Fence - PAST OR PRESENT PERFORMANCE SURVEY.pdf
PDF 83 KB Posted
- Solicitation number
- 36C10D23R0006
- Issued by
-
Department of Veterans Affairs
About this file
This document outlines requirements for a federal contract to install a perimeter fence at the St. Petersburg VA Regional Office. The contractor will be responsible for removing an existing vinyl fence and installing approximately 500 linear feet of new fencing and pedestrian gates around buildings 46 and 47. The fence must be installed to withstand hurricane force winds in accordance with local and federal guidelines. The contractor must submit shop drawings and an as-built documentation package following completion of the work. The contract will require adherence to all applicable safety, security and environmental regulations. The work must be completed by March 15, 2023 and is subject to quality assurance oversight by the contracting officer's representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 323119DecoMetalFencesGates.docx | DOCX document | |
| Detail.docx | DOCX document | |
| 36C10D23R0006 0005.docx | DOCX document | |
| SOW.pdf | ||
| Fence Layout 0005.pdf | ||
| 36C10D23R0006 0004.docx | DOCX document | |
| Fence Layout.pdf | ||
| 36C10D23R0006 0003.docx | DOCX document | |
| Revised RFIs 36C10D23R0006 0002.pdf | ||
| Statement of Work SOW.pdf | ||
| 36C10D23R0006 0002.docx | DOCX document | |
| S04 Sign in Roster 36D10D23R006.pdf | ||
| 36C10D23R0006 0001.docx | DOCX document | |
| AMIGUARD 5000 Brochure.pdf | ||
| AE Drawings Perimeter Fence.pdf | ||
| SOW Perimeter Fence 3-24-23 Final.docx | DOCX document | |
| S02 P07 WD FL20230222 SAM.pdf | ||
| AMIGUARD 6000 _ 7000 Meshes.pdf | ||
| 36C10D23R0006_1.docx | DOCX document | |
| Specs AE Perimeter Fence.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST OR PRESENT PERFORMANCE SURVEY – 36C10D23R0006
Your Company Name:__________________________________________________________________
Street Address:________________________________________________________________________
City, State, and Zip code:________________________________________________________________
1. GENERAL BUSINESS INFORMATION
Date Firm Organized/Established:___________________________
Company President:__________________________ Vice President:_____________________________
Unique Entity ID (UEI):_________________
Is company a: Partnership [ ] Separate Entity [ ] Division [ ] N/A [ ]
2. CONTRACTS/SUBCONTRACTS COMPLETED OR IN PROGRESS
Complete and submit the information requested on pages 2-4 below on prime contracts or subcontracts completed or in progress. Government contracts are preferred; but, if you have not performed Government contracts, indicate any other contracts completed or in progress.
a. First Contract:
Contracting Agency or Company:_________________________________________________________
Point of Contact:______________________________ Telephone Number:_______________________
Contract Number:____________________________ Contract/Subcontract Amount:$______________
Project Title and Location:_______________________________________________________________
General Scope of Project:________________________________________________________________
Your Role (Prime[ ], Joint Venture[ ] , or Subcontractor[ ]) and the work your firm performed:
Describe any work you subcontracted to others:______________________________________________
Total Amount of Subcontract(s):$___________________________
Period of Performance:_____________days
Scheduled Completion Date:___________________ Actual Completion Date:____________________
Percentage of Work Completed:_______________% Were you terminated?:_____________________
Did you use a Quality Control Plan?:________________ Did you use a Safety Plan?:______________
Quality Control or Safety Problems encountered (if any):_______________________________________
How was the problem resolved?:__________________________________________________________
b. Second Contract:
Point of Contact:______________________________ Telephone Number:_______________________
Contract Number:____________________________ Contract/Subcontract Amount:$______________
Project Title and Location:_______________________________________________________________
General Scope of Project:________________________________________________________________
Your Role (Prime[ ], Joint Venture[ ] , or Subcontractor[ ]) and the work your firm performed:
Describe any work you subcontracted to others:______________________________________________
Total Amount of Subcontract(s):$___________________________
Period of Performance:_____________days
Scheduled Completion Date:___________________ Actual Completion Date:____________________
Percentage of Work Completed:_______________% Were you terminated?:_____________________
Did you use a Quality Control Plan?:________________ Did you use a Safety Plan?:______________
c. Third Contract:
Point of Contact:______________________________ Telephone Number:_______________________
Contract Number:____________________________ Contract/Subcontract Amount:$______________
Project Title and Location:_______________________________________________________________
General Scope of Project:________________________________________________________________
Your Role (Prime[ ], Joint Venture[ ] , or Subcontractor[ ]) and the work your firm performed:
Describe any work you subcontracted to others:______________________________________________
Total Amount of Subcontract(s):$___________________________
Period of Performance:_____________days
Scheduled Completion Date:___________________ Actual Completion Date:____________________
Percentage of Work Completed:_______________% Were you terminated?:_____________________
Did you use a Quality Control Plan?:________________ Did you use a Safety Plan?:______________