This solicitation is for the removal and replacement of four bathrooms at the ZNY ARTCC facility in Ronkonkoma, New York. The work includes a complete demolition and renovation of the existing bathrooms, including new partitions, fixtures, finishes and mechanical and electrical systems. A mandatory site visit is scheduled for June 3, 2021 and interested contractors must submit attendee names in advance. Proposals are due by email to the point of contact by the specified date. The North American Industry Classification System code for this project is 238220 and it is set aside for small businesses with an estimated value of $16.5 million. The soliciting agency is the Department of Transportation Federal Aviation Administration New England Region. Amendments to the solicitation will be posted on the website and contractors should check periodically for updates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

NY

AS

06/04/2020 1706239

ZNY-1706239-A001

C O

N S

T R

U

IO

ENGINEERING SERVICES

SURV./WEATHER

ARTCC

BATHROOM PLAN

NEW YORK AIR ROUTE TRAFFIC CONTROL CENTER

RENOVATION OF TWO BATHROOMS IN THE ANNEX

NEW YORK CENTERRONKONKOMA

ML

PROJECT ENGINEER MGR: ENGINEERING - CENTER B

z n y -1

-a

.d g

DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

DT#18895

5'-0" 1" 2'-7" 2'-6" 5'-11"5" 6" 3'-2 1/2"

8"

5'-0" 1" 2'-7" 2'-6" 3'-2 1/2"

5"

2'-2" 3'-5"

A001

A001

3'-2 1/2" 5'-11" 5" 2'-6" 8"

A002

5'-0"

1" 4"

2'-7" 5" 2'-6" 2'-2" 3'-4" 3'-2"

WATER HEATER

NEW ELECTRIC

DISPENSOR

NAPKIN

SANITARY

DISPOSAL

NAPKIN

(TYP.)

HOLDERS

TOILET PAPER

MT 33" AFF.

EACH SIDE

48" GRAB BAR

MIRROR

TOILET

HANDICAPPED

TO CEILING GRID

TILE FROM FLOOR

EDGE OF WALL

TO CEILING ABOVE

TILE FROM FLOOR

EDGE OF WALL

MIRROR

TOILET

HANDICAPPED

A001 SCALE: 3/8" = 1'-0"

WALL ELEVATION

WALL ELEVATION

NOTES:

23.

22.

20.

19.

18.

17.

16.

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

E D

M

IS

F

INSTALL NEW HVAC REGISTERS AND DIFFUSERS. MATCH EXISTING TYPE.

USE EXISTING LIGHTING CIRCUITS FOR NEW LIGHTING.

LIGHTS WILL BE INSTALLED WITH PS1055CP FMC POWER SENTRY BATTERY PACKS.

LSS TRIM. 7 IN EACH BATHROOM COTR WILL DETERMINE LOCATIONS. 4 OF THE DOWN

INSTALL 14 LITHONIA LDN6 35/15 MVOLT GZ10 HSG LED DOWN LIGHTS WITH LO6AR

IN BOTH BATHROOMS.

TEGULAR 15/16 2" x 2" TILES WITH PRELUDE 15/16" SUSPENSION SYSTEM

INSTALL NEW CEILING GRID WITH NEW TILES ARMSTRONG DUNE ANGLED

MEETS WALL. PROPERLY PREP FLOOR TO RECEIVE NEW TILE.

COLOR WILL BE SELECTED BY COTR. PROVIDE FLOOR BULLNOSE WHERE TILE

TILE FOR WALLS SHALL BE DAL TILE SANDALO 6" x 6" GLAZED PORCELAIN TILE.

ACCENT TILE AT 5' HEIGHT. LAYOUT SHALL BE SUBMITTED FOR APPROVAL.

CORNERS AND OTHER TILE ACCESSORIES AS REQUIRED. PROVIDE A BORDER OF

COLOR WILL BE SELECTED BY COTR. PROVIDE BULL NOSE TILE AT OUTSIDE

TILE FOR WALLS SHALL BE DAL TILE SANDALO 12" x 12" GLAZED PORCELAIN TILE.

FAUCETS AND SOAP DISPENSER TO WORK WITH 120 VOLT POWER.

THE MEN'S AND WOMEN'S BATHROOMS. SUPPLY ALL ACCESSORIES NECESSARY FOR

DISPENSER WITH THE PLUG IN MODEL 060918A TRANSFORMER ON THE NEW SINKS IN

INSTALL 3 DELTA MODEL 590TPA2120-PI FAUCETS AND 3 DELTA MODEL #: DESD-550 SOAP

FOR NEW RECEPTACLES.

FAUCET AND SOAP DISPENSER. COTR WILL DESIGNATE EXISTING CIRCUIT TO USE

LOCATED. INSTALL THREE NEW RECEPTACLES UNDER NEW SINKS FOR ELECTRIC

INSTALL NEW RECEPTACLES IN BOTH BATHROOMS WHERE EXISTING ONES ARE

DETERMINED BY COTR.

DISPENSER. INSTALL RECEPTACLES ABOVE CEILING FOR POWER. CIRCUITS WILL BE

BY COTR. INSTALL 3974-57 AC EXTERNAL ADAPTER (6V) FOR EACH PAPER TOWEL

MEN'S RESTROOM AND ONE IN THE WOMEN'S RESTROOM. LOCATION TO BE DETERMINED

ROLL TOWEL DISPENSER EQUIPPED WITH LED LIGHT/WASTE RECEPTACLE. TWO IN THE

INSTALL THREE BOBRICK B-3974 RECESSED CONVERTIBLE AUTOMATIC, UNIVERSAL

INSTALL BATHROOM ACCESSORIES IN EACH TOILET COMPARTMENT. SEE SPECIFICATIONS.

NEW WATER HEATER IN JANITOR'S CLOSET.

MEN'S RESTROOM TO JANITOR'S CLOSET. PIPE WATER LINES TO BATHROOMS FROM

ON TNE WALL. SUPPLY WALL BRACKETS FOR WATER HEATER. RELOCATE CIRCUIT IN

INSTALL A RHEEM MODEL EGSP10 WATER HEATER IN THE JANITOR'S CLOSET MOUNTED

MORNINGSIDE K-12638-R OR APPROVED EQUAL WITH HEAVY DUTY CARRIER.

IN WOMEN'S RESTROOM INSTALL A WALL-MOUNT WHEELCHAIR BATHROOM SINK KOHLER

URINAL FLUSHOMETER K-7526-CP.

(HEU), WASHDOWN, WALL-HUNG K-4991-ET-0 WITH 2 WAVE TOUCHLESS HYBRID 0.5 GPF

IN THE MEN'S RESTROOM INSTALL 2 URINALS KOHLER BARDON HIGH-EFFICIENCY URINAL

VALVES TRIPOINT EXPOSED HYBRID 1.28 GPF FLUSHOMETER K-7531-CP FOR EACH TOILET.

SEATS IN RESTROOMS WITH HEAVY DUTY CARRIERS AND AUTOMATIC TOILET FLUSH

INSTALL 4 NEW WALL MOUNTED KOHLER K-4325-SS-0 TOILETS WITH K-4731-CA-0 TOILET

NEW LOCATION AS SHOWN ON DRAWINGS.

INSTALL NEW METAL STUD FRAMING AND 5/8" FIRE RATED DRYWALL FOR URINALS IN

HEIGHT AND MEET SPECIFICATIONS.

IN THE MEN'S RESTROOM BETWEEN THE TWO URINALS. TOILET PARTITIONS SHALL BE FULL

INSTALL NEW TOILET PARTITIONS IN EACH RESTROOM AND A NEW PARTITION DOOR

STANDARDS (UFAS) REQUIREMENTS.

TO BE 42" IN LENGTH. INSTALL PER CURRENT UNIFORM FEDERAL ACCESSIBILITY

INSTALL (2) STAINLESS STEEL GRAB-BARS PER HANDICAPPED TOILET. GRAB BARS ARE

PAINT JANITORS EXISTING DOOR AND FRAME. ALL PAINTING SHALL BE DONE AFTER 4:30PM.

NEW SIGNAGE ON DOORS.

BE PAINTED AND RECEIVE A NEW LEVER TYPE LOCKSET AND DOOR CLOSER. INSTALL

MEN'S ROOM ENTRANCE, LADIES ROOM ENTRANCE BOTH ARE 36" x 80". DOORS SHALL

PROVIDE (2) NEW HOLLOW METAL DOORS AND FRAMES. DOORS TO REPLACE INCLUDE

RESTROOM COUNTERTOP AND A 30" x 30" FRAMELESS MIRROR ABOVE WOMEN'S SINK.

INSTALL AND PROPERLY FASTEN A NEW 56" x 30" FRAMELESS MIRROR ABOVE MEN'S

FIELD VERIFY ALL DIMENSIONS SHOWN ON DRAWINGS.

COUNTERTOP. SEE DETAIL FOR INSTALLATION OF COUNTERTOP.

IN COUNTERTOP FOR FAUCET AND SOAP DISPENSER. COTR WILL SELECT COLOR FOR

UNDERMOUNT BATHROOM SINK OR APPROVED EQUAL IN MEN'S RESTROOM. DRILL HOLES

INSTALL A NEW QUARTZ COUNTERTOP WITH KOHLER CAXTON OVAL 17" x 14"

WALL TILE SHALL BE INSTALLED FROM FLOOR TO CEILING.

BATHROOM ACCESSORIES AS DIRECTED BY COTR.

INSTALL FIRE-RETARDANT-TREATED WOOD (FRTW) BLOCKING FOR ALL WALL MOUNTED

/2

:1

:0

P lo tt e d b

V

-C

A

G -E

B

H

8 7 6 5 4 3 2 1

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

REDLINE

APVD

zny-1706239-a001

2020-10-29T13:18:29-0400

DAVID WINKLER

2020-10-29T12:25:13-0400

MICHAEL P LOMBARDI

ZNY-1706239-A002

ARCHITECTURAL DETAILS

BUILDING

MAIN ARTCC

ANNEX

NYMA

SERVICE

POWER

ADMIN

SCHEDULED FINISH

THREADED ROD

HEX NUT

LOCK WASHER

FLAT WASHER

LEVELING BAR

MAT'L SPLASH

3/4" QUARTZ SURFACE

SUPPORT FRAME

WELDED TO

SIDE WALL

CONCEALED @ EACH

STL. TUBE POSTS

3" x 2" x 1/4"

APPROVED EQUAL

TUBE SUPPORT FRAME OR

3" x 2" x 1/4" GALV STEEL

3" MINERAL FIBER INSULATION WITH CERAMIC TILE FINISH

2' 0"

CERAMIC TILE

5/8" FE DRYWALL WITH

CASED EDGE

AT BOTH ENDS

SPLASH BEYOND

IN MASTIC

MIRROR SET

SOAP DISPENSER

3/4 " PLYWOOD (FRT)

EXPANSION SHIELD

FLAT WASHER

FLAT SHOR RETAINER

HEX NUTS

ABOVE AS REQ'D VERIFY IN FIELD.

LEVELING DEVICE TO STRUCTURE

ATTACH OVERHEAD-BRACED

UNDERSIDE OF STRUCTURE

EXIST CONC WALL

CEILING AS SCHEDULED

@ 16" OC

3 5/8 " STEEL STUDS

SEALANT

CONC. SLAB

TEST NO.: N/A

DESIGN: N/A

SCALE: 3" = 1'-0"

FIRE RATING: N/A

STC RATING: N/A

4 1/4" GWB FURRING

SILL

PLAN

HEAD

11" (MAX)

2'-0" (MAX)

FACE OF FINISH WALL

ANGLE CONTINUOUS

1"x1" NOMINAL WALL

RUNNER AT 2'-0" OC

1"x1" NOMINAL CROSS

(SEE REFLECTED CEILING PLANS)

ACOUSTICAL TILE CEILING

2x2 LAY-IN PANEL

FRAME

MACHINE SCREW TO TUBE

- SET IN SEALANT AND

MAT'L TOP AND APRON

3/4" QUARTZ SURFACE

TO L2 1/2"x2 1/2"x1/4"

STRUCTURE ABOVE OR

DIRECTION. CONNECT TO

SPACED 12'-0" OC IN EACH

WITHIN 2" OF CROSS RUNNER

CONNECT TO MAIN RUNNER

DIRECTIONS, 90 PART.

#12 WIRES SPLAYED IN 4

4'-0" OC

1"x1 1/2" MAIN RUNNER TEE

#8 HANGER WIRES @ 4'-0" OC

TO STRUCTURE ABOVE

WIRE HANGERS ATTACHED

SINK DETAILA4

A002 NOT TO SCALE

A4

A002 NOT TO SCALE

PARTITION INSTALLATION DETAILS

FLOOR-ANCHORED OR OVERHEAD-BRACED LEVELING DEVICE

FRONT SIDE

KEY PLAN

A002

TYPICAL SUSPENDED ACOUSTICAL TILE

CEILING-EXPOSED "TEE" SYSTEM

SCALE: 3" = 1'-0"

lo tt e zny-1706239-a002

2020-10-29T13:17:38-0400

DAVID WINKLER

2020-10-29T12:26:00-0400

MICHAEL P LOMBARDI

ZNY-1706239-D001

DEMOLITION PLAN

-d

X

X

WING

ADMIN

SUPPORT

OPERATIONS

BLDG

SERVICE

POWER

TRAILER

ANI RE

F & E TRAILER

ROOM

CHILLER

NYMA

CONTROL

UPS BLDGGUARDHOUSE

STORAGE

COLD

WORK

AREA OF

LADIES

UTIL

MENS

HALL 1

OFFICE

CONFERENCE

CONFERENCE

HALL 3

OFFICE OFFICE OFFICE OFFICE

CLASS

HALL 2

EQUIP

HALL 4

LOBBY

HALL 5

PS

D001 NOT TO SCALE

ANNEX BUILDING - GROUND FLOOR

KEY PLAN

L.

K.

J.

I.

H.

G.

F.

E.

D.

C.

B.

A.

ADJUST SPRINKLER PIPING AS REQUIRED FOR INSTALLATION OF NEW CEILING.

THE WALLS AND INSTALL NEW WATER HEATER FOR BATHROOMS.

JANITOR'S CLOSET TO REMAIN. ONLY WORK IN THERE IS TO PATCH AND PAINT

BEING RELOCATED. SEE NEW WORK DRAWING.

COMPLETELY REMOVE WALL BY URINAL IN MEN'S ROOM NEXT TO SINKS. THIS WALL IS

ALL TIMES.

TO THE OLD BATHROOM STILL IN SERVICE. ONE BATHROOM MUST REMAIN IN SERVICE AT

THE WALLS IN BATHROOMS. TO ACCOMPLISH THIS MAY INVOLVE INSTALLING NEW PIPING

REMOVE ALL SANITARY AND DOMESTIC WATER PIPING THAT CAN BE ACCESSED BEHIND

SIMPLEX IF NECESSARY.

AFTER BATHROOM IS COMPLETED. COORDINATE AND CONTRACT WITH FA CONTRACTOR

REMOVE FIRE ALARM DEVICES WHILE BATHROOM IS BEING RENOVATED AND REINSTALL

TO THE JANITOR'S CLOSET.

INSTALLED. DEMOLISH ELECTRIC WATER HEATER. WATER HEATER WILL BE RELOCATED

RECEPTACLES. REMOVE PA SPEAKER AND REINSTALL AFTER NEW BATHROOMS CEILING IS

REMOVE AND DISPOSE OF ALL LIGHTING. REMOVE ALL ELECTRICAL SWITCHES AND

REMOVE FLOOR TILE IN BATHROOMS. PROTECT FLOOR DRAINS.

REPLACE DAMAGED STUDS FOUND DURING DEMO.

REMOVE INTERIOR WALLS ONLY IN THE BATHROOMS. EXTERIOR WALLS TO REMAIN INTACT.

COMPLETELY FINISH ONE BATHROOM BEFORE WORKING ON THE OTHER

THE BUILDING WILL BE OCCUPIED BY PERSONAL AND NEED A ONE WORKING BATHROOM.

ON BEFORE START OF CONSTRUCTION. ONLY WORK ON ONE BATHROOM AT A TIME.

INSTALL A 2 x 4 DUST PARTITION WITH PLASTIC AROUND BATHROOM BEING WORKED

SHUTDOWNS WILL ALSO ONLY BE ALLOWED AFTER 4:30 PM.

NOISY WORK SHALL BE ACCOMPLISHED AFTER 4:30 PM. PLUMBING AND ELECTRICAL

ATTACHMENTS. CLEAN AND PREPARE THE AREA TO RECEIVE NEW CONSTRUCTION.

ALL INTERIOR WALLS AND ASSOCIATED ATTACHMENTS CEILING AND ASSCIATED

PARTITIONS, TOILETS, COUNTERS, SINKS, URINALS, FINISHES AND MASTICS FROM FLOOR,

RENOVATION INCLUDES A COMPLETE REMOVAL OF CEILINGS, WALLS, FLOORS ALL

CONCRETE WALL AND ITEMS, SUCH AS STRUCTURAL ITEMS COLUMNS BEAMS, ETC.

COMPLETE RENOVATION OF THE MEN'S AND WOMENS RESTROOMS EXCLUDING EXISTING

-d

:5 lo tt e zny-1706239-d001

2020-10-29T13:16:43-0400

DAVID WINKLER

2020-10-29T12:26:41-0400

MICHAEL P LOMBARDI

ZNY-1706239-G001

-g

AS SURV./WEATHER

COVER SHEET AND DRAWING INDEX

ARCHITECTURAL DETAILS

PLUMBING DETAILS

DEMOLITION PLAN

CONSTRUCTION STAGING PLAN

COVER SHEET & DRAWING INDEX

ZNY-1706239-A002

ZNY-1706239-A001

ZNY-1706239-P001

ZNY-1706239-D001

ZNY-1706239-G002

ZNY-1706239-G001

DRAWING TITLEDRAWING NUMBER

DRAWING INDEX

T OF TRANSPO

T A

IC

OF

STATES

IT

TM

EN

AVIA

I

L

TRAT

SI

NI

IN THE ANNEX

RENOVATION OF THE TWO BATHROOMS

ISLIP, NEW YORK

TRAFFIC CONTROL CENTER

NEW YORK AIR ROUTE

lo tt e zny-1706239-g001

2020-10-29T13:15:02-0400

DAVID WINKLER

2020-10-29T12:27:19-0400

MICHAEL P LOMBARDI

ZNY-1706239-G002

AS SURV./WEATHER

CONSTRUCTION STAGING PLAN

W

IN

x xxxx xx x x x x x x x x x x x x x x x xx xx x xx x x x x x x xxxxxxxxxx

STAGING AREA

POWER SERVICE

GENERATOR

PCS &

STATION

METERING

ELECTRICAL

PROPERTY LINE

SECURITY FENCE

CHILLER

F & E

PARTS

F & E AND GUARD HOUSE

SERVICE GATE

ENGINEERS

RESIDENT

WORK AREA

AUTOMATION

ADVANCED

LOADING DOCK

GUARD HOUSE

IA

IG

W

Y

SECURITY GATE

MAIN ENTRANCE

GARAGE & STORAGE BUILDING

SHED

STORAGE

COLD

xx

CONSTRUCTION STAGING PLAN NOTES:

A. CONSTRUCTION ACCESS

B. CONTRACTOR PARKING

C. FAA SECURITY REQUIREMENTS

D. CONSTRUCTION MATERIAL STORAGE

E. CONSTRUCTION DEBRIS

F. NOT USED.

G. CONSTRUCTION OFFICE

H. CONSTRUCTION TOILET FACILITIES

I. DEMOLITION AND CONSTRUCTION HOURS

WRITING BY COTR.

WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN

NO WELDING EQUIPMENT SHALL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM.

FUNCTIONS OF THE ARTCC.

TO COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH

ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY

BREAKER AT ANY TIME.

CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT

OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION.

MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR SHALL REQUEST PERMISSION

DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL

AND HAVE APPROVAL IN WRITING BY COTR WITH A MINIMUM OF 10 (TEN) WORKING

COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE

DEMOLITION AND CONSTRUCTION HOURS. PREPARATORY WORK WORK SHAL BE

BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE 1.2 THIS SHEET UNDER

SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS SHALL

BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDE CORE DRILLING.

OUTSIDE BUILDING, FROM DAMAGE, INCLUDE BUT NOT LIMITED TO, DAMAGE CAUSED

CONRACTOR SHALL PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND

BY CONTRACTOR TO THE SATISFACTION OF COTR.

DISTURBED LAWNS AND LANDSCAPING SHALL BE RESTORED TO ORIGINAL CONDITION

ORIGINAL CONDITION, INCLUDING STRIPING OF PARKING LOT.

UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR PAVED SURFACES TO

WORK HOURS SHALL BE 4:30PM - 12:30AM FOR ALL WORK IN ANNEX BATHROOMS.

REFER TO DIVISION 1 FOR MORATORUM OF WORK TIME FRAMES.

WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.

COORDINATE AND HAVE APPROVAL BY COTR IN WRITING, A MINIMUM OF 10 (TEN)

SHALL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COTR. SCHEDULE,

CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING

OF THE WORK.

MINIMUM OF 10 (TEN) WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE

SHALL BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COTR WITH A

NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES

FACILITY. DEMOLITION AND CONSTRUCTION NOISE SHALL BE MINIMIZED AT ALL TIMES.

CONTRACTOR SHALL NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTION OF THIS

K. NOT USED.

L. PARKING LOT AND DRIVEWAY REPAIR

M. EQUIPMENT PROTECTION

A.5

A.4

A.3

A.2

A.1

B.1

CONTRUCTION STAGING AREA.

PORTABLE CHEMICAL TOILETS SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED WITHIN

CELL PHONE USE IS PROHIBITED.

COORDINATE WITH COTR USE OF MOBILE CELL PHONES AT FACILITY, IN SOME AREAS OF BUILDING

PRECONSTRUCTION CONFERENCE. HOOK-UPS SHALL BE THE RESPONSIBILITY OF CONTRACTOR.

PURPOSES OF THE WORK TRAILER. POINT OF CONNECTION SHALL BE DETERMINED AT

TEMPORARY POWER AND WATER IS AVAILABLE AT ARTCC, IF REQUIRED FOR CONSTRUCTION

IN CONSTRUCTION STAGING AREA. CONTRACTOR SHALL PROVIDE TELEPHONE AND BOTTLED WATER.

CONTRACTOR'S TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE SHALL BE LOCATED

DEBRIS SHALL BE REMOVED BY CONTRACTOR DAILY.

SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION.

CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS

ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY

UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.

NO DIGGING WITHOUT PRIOR PERMISSION FROM COTR. BURIED CABLES (UNDERGROUND

INSTALLED BY THE CONTRACTOR AT THE DISCRETION OF COTR. CONTRACTOR SHALL DO

BY A FENCE. MATERIALS SHALL BE NEATLY STORED AND PROTECTED. LIGHTING SHALL BE

CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA SHALL BE SURROUNDED

STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE LIMITED TO THE

AWARD. COORDINATE WITH SITE NUMBER OF CLEARANCES REQUIRED TO PERFORM WORK.

TO OBTAIN SECURITY CLEARANCE BADGING IMMEDIATELY FOLLOWING NOTICE OF CONTRACT

CONTRACTOR SHALL SUBMIT SECURITY PAPERWORK FOR CONTRACTOR PERSONNEL THAT ARE

OF THE FLYING PUBLIC.

SERVICES. LOSS OF THIS EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE SAFETY

CONTRACTOR SHALL NOTIFY COTR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL

ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS.

THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR

OF THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUOUS PROTECTION OF

EXISTING FAA AIR TRAFFIC EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT DURATION

SHALL NOT BE PERMITTED.

FACILITY. WORK SHALL BE COORDINATED WITH COTR. DISRUPTION OF THIS FACILITY

CONTRACTOR SHALL USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS

BUILDING MAY BE REQUIRE. COORDINATE REQUIREMENTS WITH COTR.

BUILDING. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COTR. ESCORTS OUTSIDE

FAA ESCORTS SHALL BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHING THE

SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL SHALL REMAIN IN CONSTRUCTION AREAS.

PERSONNEL WHILE IN THE BUILDING. CONTRACTORS VEHICLES SHALL BE MARKED.

CONTRACTOR'S SUPERVISORY PERSONNEL SHALL BE RESPONSIBLE FOR CONDUCT OF THEIR

RESERVES THE RIGHT TO PROHIBIT WORKERS EMPLOYED BY CONTRACTOR TO WORK AT FACILITY.

COTR. TEMPORARY SECURITY BADGES SHALL BE ISSUED TO CONSTRUCTION PERSONNEL. FAA

AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO

ARTCC ARE OFF-LIMITS FOR CONTRACTOR PARKING.

PARKING SHALL BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT

CONTRACTOR'S PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA. ADDITIONAL

6:30 TO 8:00 AM AND 2:00 TO 400 PM. COORDINATE CONTRACTOR DELIVERIES WITH THE COTR.

OTHER THAN FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT OCCUR AT

DELIVERIES SHALL BE SCHEDULED AND APPROVED IN ADVANCED WITH COTR AND AT TIMES

CONTRACTOR SHALL KEEP LOADING DOCK AND ENTRY WAYS ACCESSIBLE AT ALL TIMES.

1) DSR FIRST FLOOR AND DSR ATTIC, ESCORT REQUIRED AT ALL TIMES.

CONTRACTOR'S ACCESS TO BUILDING SHALL BE LIMITED TO THE FOLLOWING LOCATIONS:

AND DIRECT PERSONS NEAR CONSTRUCTION AREAS.

ON SITE. PROVIDE NECESSARY BARRICADES, LIGHTS SIGNAGE AND FENCING TO PROTECT, WARN

PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES

ENTANCE SECURITY GATE.

CONTRACTOR'S VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE THROUGH MAIN

ONGOING PROJECTS.

SHALL BE COORDINATED WITH SITE PERSONNEL VIA COTR; PARTICULARLY IN CONJUNCTION WITH

CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA

INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.

OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT

REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENEAL REQUIREMENTS"

THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY

C.6

C.5

C.4

C.3

C.2

C.1

D.1

E.1

G.2

G.1

H.1

1.5

I.4

I.3

I.2

I.1

L.2

L.1

M4

M.3

M.2

M.1

CONSTRUCTION STAGING PLAN1

G002 NOT TO SCALE

lo tt e zny-1706239-g002

2020-10-29T13:14:01-0400

DAVID WINKLER

2020-10-29T12:27:51-0400

MICHAEL P LOMBARDI

ZNY-1706239-P001

PLUMBING DETAILS

-p

P2 P1 P4

P2 P1 P3

P4

P8

DN TO SS

3/4" HW & CW

DN TO LAV

3/4" HW/CW

1" CW

1 1/2" 2"

TO WC'S

2" CW DN

1" CW DN TO URN'S

WOMENS

WATER PIPING DETAIL

SANITARY PIPING DETAIL

CO

FD

GRATES

FD NEW

WOMENS

GRATES

FD NEW

HWH

PIPING IN WALLS

REPLACE ALL

P1 & P2

P4

P3

P8

FIXTURE

HOT WATER HEATER

URINAL

LAVATORY

WATER CLOSET

DES. HW CW S V

W.C.

LAV.

UR.

HWH 3/4"

1/2"

3/4"

1"

1/2"

4"1 1/2"

4" & 2"

FIXTURE BRANCH PIPE SIZE SCHEDULE

MAKE UP

1 1/2"BOILER UR UR SS LAV LAV LAV EWC

HCP

WC WC WC WC

3/4" 2" 1" 3/4" 1/2" HW/CWHWH

1/2" 1/2"

CW

HW

S. A. 5010

REPLACE

S. A. 5005

S. A. 50053/4" S. A. 5005

REPLACE ALL DOMESTIC WATER PIPING IN BOTH BATHROOMS

REPLACE ALL DOMESTIC WATER PIPING IN BATHROOMS

BRACKETS

ON STAINLESS

NEW HWH MOUNTED

NOT TO SCALE

NEW WATER RISER DIAGRAM

NOT TO SCALE

NEW SANITARY & VENT RISER DIAGRAM

3"

3"

3" C.O. 3" FD (ID)

C.O.

3" FD

3" V. T. R. 4" V. T. R.

4" 2" 1 1/2" 1 1/2"1 1/2"

3" 2" 2"

4" 4" 2" 1 1/2"

3" FD

4" C.O.

C.O.

WC WC

WC WC

UR UR LAV LAV

LAV LAV

EWC EWC

REPLACE ALL SANITARY PIPING IN WALLS

NO.

PLAN

ROOM 13

LAV1/2" 1/2"

SINK

2.

1.

INSTALL 2" SS DRAIN TO ROOM 13 ADJACENT TO MEN'S REST ROOM.

THE MEN'S REST ROOM.

INSTALL 1/2" HW AND CW LINES TO ROOM 13 ADJACENT TO

-p lo tt e zny-1706239-p001

2020-10-29T13:12:58-0400

DAVID WINKLER

2020-10-29T12:28:20-0400

MICHAEL P LOMBARDI