zny-1706239-final Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- 697DCK-21-R-00259
About this file
This solicitation is for the removal and replacement of four bathrooms at the ZNY ARTCC facility in Ronkonkoma, New York. The work includes a complete demolition and renovation of the existing bathrooms, including new partitions, fixtures, finishes and mechanical and electrical systems. A mandatory site visit is scheduled for June 3, 2021 and interested contractors must submit attendee names in advance. Proposals are due by email to the point of contact by the specified date. The North American Industry Classification System code for this project is 238220 and it is set aside for small businesses with an estimated value of $16.5 million. The soliciting agency is the Department of Transportation Federal Aviation Administration New England Region. Amendments to the solicitation will be posted on the website and contractors should check periodically for updates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
NY
AS
06/04/2020 1706239
ZNY-1706239-A001
C O
N S
T R
U
IO
ENGINEERING SERVICES
SURV./WEATHER
ARTCC
BATHROOM PLAN
NEW YORK AIR ROUTE TRAFFIC CONTROL CENTER
RENOVATION OF TWO BATHROOMS IN THE ANNEX
NEW YORK CENTERRONKONKOMA
ML
PROJECT ENGINEER MGR: ENGINEERING - CENTER B
z n y -1
-a
.d g
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
DT#18895
5'-0" 1" 2'-7" 2'-6" 5'-11"5" 6" 3'-2 1/2"
8"
5'-0" 1" 2'-7" 2'-6" 3'-2 1/2"
5"
2'-2" 3'-5"
A001
A001
3'-2 1/2" 5'-11" 5" 2'-6" 8"
A002
5'-0"
1" 4"
2'-7" 5" 2'-6" 2'-2" 3'-4" 3'-2"
WATER HEATER
NEW ELECTRIC
DISPENSOR
NAPKIN
SANITARY
DISPOSAL
NAPKIN
(TYP.)
HOLDERS
TOILET PAPER
MT 33" AFF.
EACH SIDE
48" GRAB BAR
MIRROR
TOILET
HANDICAPPED
TO CEILING GRID
TILE FROM FLOOR
EDGE OF WALL
TO CEILING ABOVE
TILE FROM FLOOR
EDGE OF WALL
MIRROR
TOILET
HANDICAPPED
A001 SCALE: 3/8" = 1'-0"
WALL ELEVATION
WALL ELEVATION
NOTES:
23.
22.
20.
19.
18.
17.
16.
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
E D
M
IS
F
INSTALL NEW HVAC REGISTERS AND DIFFUSERS. MATCH EXISTING TYPE.
USE EXISTING LIGHTING CIRCUITS FOR NEW LIGHTING.
LIGHTS WILL BE INSTALLED WITH PS1055CP FMC POWER SENTRY BATTERY PACKS.
LSS TRIM. 7 IN EACH BATHROOM COTR WILL DETERMINE LOCATIONS. 4 OF THE DOWN
INSTALL 14 LITHONIA LDN6 35/15 MVOLT GZ10 HSG LED DOWN LIGHTS WITH LO6AR
IN BOTH BATHROOMS.
TEGULAR 15/16 2" x 2" TILES WITH PRELUDE 15/16" SUSPENSION SYSTEM
INSTALL NEW CEILING GRID WITH NEW TILES ARMSTRONG DUNE ANGLED
MEETS WALL. PROPERLY PREP FLOOR TO RECEIVE NEW TILE.
COLOR WILL BE SELECTED BY COTR. PROVIDE FLOOR BULLNOSE WHERE TILE
TILE FOR WALLS SHALL BE DAL TILE SANDALO 6" x 6" GLAZED PORCELAIN TILE.
ACCENT TILE AT 5' HEIGHT. LAYOUT SHALL BE SUBMITTED FOR APPROVAL.
CORNERS AND OTHER TILE ACCESSORIES AS REQUIRED. PROVIDE A BORDER OF
COLOR WILL BE SELECTED BY COTR. PROVIDE BULL NOSE TILE AT OUTSIDE
TILE FOR WALLS SHALL BE DAL TILE SANDALO 12" x 12" GLAZED PORCELAIN TILE.
FAUCETS AND SOAP DISPENSER TO WORK WITH 120 VOLT POWER.
THE MEN'S AND WOMEN'S BATHROOMS. SUPPLY ALL ACCESSORIES NECESSARY FOR
DISPENSER WITH THE PLUG IN MODEL 060918A TRANSFORMER ON THE NEW SINKS IN
INSTALL 3 DELTA MODEL 590TPA2120-PI FAUCETS AND 3 DELTA MODEL #: DESD-550 SOAP
FOR NEW RECEPTACLES.
FAUCET AND SOAP DISPENSER. COTR WILL DESIGNATE EXISTING CIRCUIT TO USE
LOCATED. INSTALL THREE NEW RECEPTACLES UNDER NEW SINKS FOR ELECTRIC
INSTALL NEW RECEPTACLES IN BOTH BATHROOMS WHERE EXISTING ONES ARE
DETERMINED BY COTR.
DISPENSER. INSTALL RECEPTACLES ABOVE CEILING FOR POWER. CIRCUITS WILL BE
BY COTR. INSTALL 3974-57 AC EXTERNAL ADAPTER (6V) FOR EACH PAPER TOWEL
MEN'S RESTROOM AND ONE IN THE WOMEN'S RESTROOM. LOCATION TO BE DETERMINED
ROLL TOWEL DISPENSER EQUIPPED WITH LED LIGHT/WASTE RECEPTACLE. TWO IN THE
INSTALL THREE BOBRICK B-3974 RECESSED CONVERTIBLE AUTOMATIC, UNIVERSAL
INSTALL BATHROOM ACCESSORIES IN EACH TOILET COMPARTMENT. SEE SPECIFICATIONS.
NEW WATER HEATER IN JANITOR'S CLOSET.
MEN'S RESTROOM TO JANITOR'S CLOSET. PIPE WATER LINES TO BATHROOMS FROM
ON TNE WALL. SUPPLY WALL BRACKETS FOR WATER HEATER. RELOCATE CIRCUIT IN
INSTALL A RHEEM MODEL EGSP10 WATER HEATER IN THE JANITOR'S CLOSET MOUNTED
MORNINGSIDE K-12638-R OR APPROVED EQUAL WITH HEAVY DUTY CARRIER.
IN WOMEN'S RESTROOM INSTALL A WALL-MOUNT WHEELCHAIR BATHROOM SINK KOHLER
URINAL FLUSHOMETER K-7526-CP.
(HEU), WASHDOWN, WALL-HUNG K-4991-ET-0 WITH 2 WAVE TOUCHLESS HYBRID 0.5 GPF
IN THE MEN'S RESTROOM INSTALL 2 URINALS KOHLER BARDON HIGH-EFFICIENCY URINAL
VALVES TRIPOINT EXPOSED HYBRID 1.28 GPF FLUSHOMETER K-7531-CP FOR EACH TOILET.
SEATS IN RESTROOMS WITH HEAVY DUTY CARRIERS AND AUTOMATIC TOILET FLUSH
INSTALL 4 NEW WALL MOUNTED KOHLER K-4325-SS-0 TOILETS WITH K-4731-CA-0 TOILET
NEW LOCATION AS SHOWN ON DRAWINGS.
INSTALL NEW METAL STUD FRAMING AND 5/8" FIRE RATED DRYWALL FOR URINALS IN
HEIGHT AND MEET SPECIFICATIONS.
IN THE MEN'S RESTROOM BETWEEN THE TWO URINALS. TOILET PARTITIONS SHALL BE FULL
INSTALL NEW TOILET PARTITIONS IN EACH RESTROOM AND A NEW PARTITION DOOR
STANDARDS (UFAS) REQUIREMENTS.
TO BE 42" IN LENGTH. INSTALL PER CURRENT UNIFORM FEDERAL ACCESSIBILITY
INSTALL (2) STAINLESS STEEL GRAB-BARS PER HANDICAPPED TOILET. GRAB BARS ARE
PAINT JANITORS EXISTING DOOR AND FRAME. ALL PAINTING SHALL BE DONE AFTER 4:30PM.
NEW SIGNAGE ON DOORS.
BE PAINTED AND RECEIVE A NEW LEVER TYPE LOCKSET AND DOOR CLOSER. INSTALL
MEN'S ROOM ENTRANCE, LADIES ROOM ENTRANCE BOTH ARE 36" x 80". DOORS SHALL
PROVIDE (2) NEW HOLLOW METAL DOORS AND FRAMES. DOORS TO REPLACE INCLUDE
RESTROOM COUNTERTOP AND A 30" x 30" FRAMELESS MIRROR ABOVE WOMEN'S SINK.
INSTALL AND PROPERLY FASTEN A NEW 56" x 30" FRAMELESS MIRROR ABOVE MEN'S
FIELD VERIFY ALL DIMENSIONS SHOWN ON DRAWINGS.
COUNTERTOP. SEE DETAIL FOR INSTALLATION OF COUNTERTOP.
IN COUNTERTOP FOR FAUCET AND SOAP DISPENSER. COTR WILL SELECT COLOR FOR
UNDERMOUNT BATHROOM SINK OR APPROVED EQUAL IN MEN'S RESTROOM. DRILL HOLES
INSTALL A NEW QUARTZ COUNTERTOP WITH KOHLER CAXTON OVAL 17" x 14"
WALL TILE SHALL BE INSTALLED FROM FLOOR TO CEILING.
BATHROOM ACCESSORIES AS DIRECTED BY COTR.
INSTALL FIRE-RETARDANT-TREATED WOOD (FRTW) BLOCKING FOR ALL WALL MOUNTED
/2
:1
:0
P lo tt e d b
V
-C
A
G -E
B
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
zny-1706239-a001
2020-10-29T13:18:29-0400
DAVID WINKLER
2020-10-29T12:25:13-0400
MICHAEL P LOMBARDI
ZNY-1706239-A002
ARCHITECTURAL DETAILS
BUILDING
MAIN ARTCC
ANNEX
NYMA
SERVICE
POWER
ADMIN
SCHEDULED FINISH
THREADED ROD
HEX NUT
LOCK WASHER
FLAT WASHER
LEVELING BAR
MAT'L SPLASH
3/4" QUARTZ SURFACE
SUPPORT FRAME
WELDED TO
SIDE WALL
CONCEALED @ EACH
STL. TUBE POSTS
3" x 2" x 1/4"
APPROVED EQUAL
TUBE SUPPORT FRAME OR
3" x 2" x 1/4" GALV STEEL
3" MINERAL FIBER INSULATION WITH CERAMIC TILE FINISH
2' 0"
CERAMIC TILE
5/8" FE DRYWALL WITH
CASED EDGE
AT BOTH ENDS
SPLASH BEYOND
IN MASTIC
MIRROR SET
SOAP DISPENSER
3/4 " PLYWOOD (FRT)
EXPANSION SHIELD
FLAT WASHER
FLAT SHOR RETAINER
HEX NUTS
ABOVE AS REQ'D VERIFY IN FIELD.
LEVELING DEVICE TO STRUCTURE
ATTACH OVERHEAD-BRACED
UNDERSIDE OF STRUCTURE
EXIST CONC WALL
CEILING AS SCHEDULED
@ 16" OC
3 5/8 " STEEL STUDS
SEALANT
CONC. SLAB
TEST NO.: N/A
DESIGN: N/A
SCALE: 3" = 1'-0"
FIRE RATING: N/A
STC RATING: N/A
4 1/4" GWB FURRING
SILL
PLAN
HEAD
11" (MAX)
2'-0" (MAX)
FACE OF FINISH WALL
ANGLE CONTINUOUS
1"x1" NOMINAL WALL
RUNNER AT 2'-0" OC
1"x1" NOMINAL CROSS
(SEE REFLECTED CEILING PLANS)
ACOUSTICAL TILE CEILING
2x2 LAY-IN PANEL
FRAME
MACHINE SCREW TO TUBE
- SET IN SEALANT AND
MAT'L TOP AND APRON
3/4" QUARTZ SURFACE
TO L2 1/2"x2 1/2"x1/4"
STRUCTURE ABOVE OR
DIRECTION. CONNECT TO
SPACED 12'-0" OC IN EACH
WITHIN 2" OF CROSS RUNNER
CONNECT TO MAIN RUNNER
DIRECTIONS, 90 PART.
#12 WIRES SPLAYED IN 4
4'-0" OC
1"x1 1/2" MAIN RUNNER TEE
#8 HANGER WIRES @ 4'-0" OC
TO STRUCTURE ABOVE
WIRE HANGERS ATTACHED
SINK DETAILA4
A002 NOT TO SCALE
A4
A002 NOT TO SCALE
PARTITION INSTALLATION DETAILS
FLOOR-ANCHORED OR OVERHEAD-BRACED LEVELING DEVICE
FRONT SIDE
KEY PLAN
A002
TYPICAL SUSPENDED ACOUSTICAL TILE
CEILING-EXPOSED "TEE" SYSTEM
SCALE: 3" = 1'-0"
lo tt e zny-1706239-a002
2020-10-29T13:17:38-0400
DAVID WINKLER
2020-10-29T12:26:00-0400
MICHAEL P LOMBARDI
ZNY-1706239-D001
DEMOLITION PLAN
-d
X
X
WING
ADMIN
SUPPORT
OPERATIONS
BLDG
SERVICE
POWER
TRAILER
ANI RE
F & E TRAILER
ROOM
CHILLER
NYMA
CONTROL
UPS BLDGGUARDHOUSE
STORAGE
COLD
WORK
AREA OF
LADIES
UTIL
MENS
HALL 1
OFFICE
CONFERENCE
CONFERENCE
HALL 3
OFFICE OFFICE OFFICE OFFICE
CLASS
HALL 2
EQUIP
HALL 4
LOBBY
HALL 5
PS
D001 NOT TO SCALE
ANNEX BUILDING - GROUND FLOOR
KEY PLAN
L.
K.
J.
I.
H.
G.
F.
E.
D.
C.
B.
A.
ADJUST SPRINKLER PIPING AS REQUIRED FOR INSTALLATION OF NEW CEILING.
THE WALLS AND INSTALL NEW WATER HEATER FOR BATHROOMS.
JANITOR'S CLOSET TO REMAIN. ONLY WORK IN THERE IS TO PATCH AND PAINT
BEING RELOCATED. SEE NEW WORK DRAWING.
COMPLETELY REMOVE WALL BY URINAL IN MEN'S ROOM NEXT TO SINKS. THIS WALL IS
ALL TIMES.
TO THE OLD BATHROOM STILL IN SERVICE. ONE BATHROOM MUST REMAIN IN SERVICE AT
THE WALLS IN BATHROOMS. TO ACCOMPLISH THIS MAY INVOLVE INSTALLING NEW PIPING
REMOVE ALL SANITARY AND DOMESTIC WATER PIPING THAT CAN BE ACCESSED BEHIND
SIMPLEX IF NECESSARY.
AFTER BATHROOM IS COMPLETED. COORDINATE AND CONTRACT WITH FA CONTRACTOR
REMOVE FIRE ALARM DEVICES WHILE BATHROOM IS BEING RENOVATED AND REINSTALL
TO THE JANITOR'S CLOSET.
INSTALLED. DEMOLISH ELECTRIC WATER HEATER. WATER HEATER WILL BE RELOCATED
RECEPTACLES. REMOVE PA SPEAKER AND REINSTALL AFTER NEW BATHROOMS CEILING IS
REMOVE AND DISPOSE OF ALL LIGHTING. REMOVE ALL ELECTRICAL SWITCHES AND
REMOVE FLOOR TILE IN BATHROOMS. PROTECT FLOOR DRAINS.
REPLACE DAMAGED STUDS FOUND DURING DEMO.
REMOVE INTERIOR WALLS ONLY IN THE BATHROOMS. EXTERIOR WALLS TO REMAIN INTACT.
COMPLETELY FINISH ONE BATHROOM BEFORE WORKING ON THE OTHER
THE BUILDING WILL BE OCCUPIED BY PERSONAL AND NEED A ONE WORKING BATHROOM.
ON BEFORE START OF CONSTRUCTION. ONLY WORK ON ONE BATHROOM AT A TIME.
INSTALL A 2 x 4 DUST PARTITION WITH PLASTIC AROUND BATHROOM BEING WORKED
SHUTDOWNS WILL ALSO ONLY BE ALLOWED AFTER 4:30 PM.
NOISY WORK SHALL BE ACCOMPLISHED AFTER 4:30 PM. PLUMBING AND ELECTRICAL
ATTACHMENTS. CLEAN AND PREPARE THE AREA TO RECEIVE NEW CONSTRUCTION.
ALL INTERIOR WALLS AND ASSOCIATED ATTACHMENTS CEILING AND ASSCIATED
PARTITIONS, TOILETS, COUNTERS, SINKS, URINALS, FINISHES AND MASTICS FROM FLOOR,
RENOVATION INCLUDES A COMPLETE REMOVAL OF CEILINGS, WALLS, FLOORS ALL
CONCRETE WALL AND ITEMS, SUCH AS STRUCTURAL ITEMS COLUMNS BEAMS, ETC.
COMPLETE RENOVATION OF THE MEN'S AND WOMENS RESTROOMS EXCLUDING EXISTING
-d
:5 lo tt e zny-1706239-d001
2020-10-29T13:16:43-0400
DAVID WINKLER
2020-10-29T12:26:41-0400
MICHAEL P LOMBARDI
ZNY-1706239-G001
-g
AS SURV./WEATHER
COVER SHEET AND DRAWING INDEX
ARCHITECTURAL DETAILS
PLUMBING DETAILS
DEMOLITION PLAN
CONSTRUCTION STAGING PLAN
COVER SHEET & DRAWING INDEX
ZNY-1706239-A002
ZNY-1706239-A001
ZNY-1706239-P001
ZNY-1706239-D001
ZNY-1706239-G002
ZNY-1706239-G001
DRAWING TITLEDRAWING NUMBER
DRAWING INDEX
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
AVIA
I
L
TRAT
SI
NI
IN THE ANNEX
RENOVATION OF THE TWO BATHROOMS
ISLIP, NEW YORK
TRAFFIC CONTROL CENTER
NEW YORK AIR ROUTE
lo tt e zny-1706239-g001
2020-10-29T13:15:02-0400
DAVID WINKLER
2020-10-29T12:27:19-0400
MICHAEL P LOMBARDI
ZNY-1706239-G002
AS SURV./WEATHER
CONSTRUCTION STAGING PLAN
W
IN
x xxxx xx x x x x x x x x x x x x x x x xx xx x xx x x x x x x xxxxxxxxxx
STAGING AREA
POWER SERVICE
GENERATOR
PCS &
STATION
METERING
ELECTRICAL
PROPERTY LINE
SECURITY FENCE
CHILLER
F & E
PARTS
F & E AND GUARD HOUSE
SERVICE GATE
ENGINEERS
RESIDENT
WORK AREA
AUTOMATION
ADVANCED
LOADING DOCK
GUARD HOUSE
IA
IG
W
Y
SECURITY GATE
MAIN ENTRANCE
GARAGE & STORAGE BUILDING
SHED
STORAGE
COLD
xx
CONSTRUCTION STAGING PLAN NOTES:
A. CONSTRUCTION ACCESS
B. CONTRACTOR PARKING
C. FAA SECURITY REQUIREMENTS
D. CONSTRUCTION MATERIAL STORAGE
E. CONSTRUCTION DEBRIS
F. NOT USED.
G. CONSTRUCTION OFFICE
H. CONSTRUCTION TOILET FACILITIES
I. DEMOLITION AND CONSTRUCTION HOURS
WRITING BY COTR.
WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN
NO WELDING EQUIPMENT SHALL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM.
FUNCTIONS OF THE ARTCC.
TO COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH
ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY
BREAKER AT ANY TIME.
CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT
OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION.
MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR SHALL REQUEST PERMISSION
DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL
AND HAVE APPROVAL IN WRITING BY COTR WITH A MINIMUM OF 10 (TEN) WORKING
COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE
DEMOLITION AND CONSTRUCTION HOURS. PREPARATORY WORK WORK SHAL BE
BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE 1.2 THIS SHEET UNDER
SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS SHALL
BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDE CORE DRILLING.
OUTSIDE BUILDING, FROM DAMAGE, INCLUDE BUT NOT LIMITED TO, DAMAGE CAUSED
CONRACTOR SHALL PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND
BY CONTRACTOR TO THE SATISFACTION OF COTR.
DISTURBED LAWNS AND LANDSCAPING SHALL BE RESTORED TO ORIGINAL CONDITION
ORIGINAL CONDITION, INCLUDING STRIPING OF PARKING LOT.
UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR PAVED SURFACES TO
WORK HOURS SHALL BE 4:30PM - 12:30AM FOR ALL WORK IN ANNEX BATHROOMS.
REFER TO DIVISION 1 FOR MORATORUM OF WORK TIME FRAMES.
WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.
COORDINATE AND HAVE APPROVAL BY COTR IN WRITING, A MINIMUM OF 10 (TEN)
SHALL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COTR. SCHEDULE,
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING
OF THE WORK.
MINIMUM OF 10 (TEN) WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE
SHALL BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COTR WITH A
NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES
FACILITY. DEMOLITION AND CONSTRUCTION NOISE SHALL BE MINIMIZED AT ALL TIMES.
CONTRACTOR SHALL NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTION OF THIS
K. NOT USED.
L. PARKING LOT AND DRIVEWAY REPAIR
M. EQUIPMENT PROTECTION
A.5
A.4
A.3
A.2
A.1
B.1
CONTRUCTION STAGING AREA.
PORTABLE CHEMICAL TOILETS SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED WITHIN
CELL PHONE USE IS PROHIBITED.
COORDINATE WITH COTR USE OF MOBILE CELL PHONES AT FACILITY, IN SOME AREAS OF BUILDING
PRECONSTRUCTION CONFERENCE. HOOK-UPS SHALL BE THE RESPONSIBILITY OF CONTRACTOR.
PURPOSES OF THE WORK TRAILER. POINT OF CONNECTION SHALL BE DETERMINED AT
TEMPORARY POWER AND WATER IS AVAILABLE AT ARTCC, IF REQUIRED FOR CONSTRUCTION
IN CONSTRUCTION STAGING AREA. CONTRACTOR SHALL PROVIDE TELEPHONE AND BOTTLED WATER.
CONTRACTOR'S TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE SHALL BE LOCATED
DEBRIS SHALL BE REMOVED BY CONTRACTOR DAILY.
SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION.
CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS
ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY
UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.
NO DIGGING WITHOUT PRIOR PERMISSION FROM COTR. BURIED CABLES (UNDERGROUND
INSTALLED BY THE CONTRACTOR AT THE DISCRETION OF COTR. CONTRACTOR SHALL DO
BY A FENCE. MATERIALS SHALL BE NEATLY STORED AND PROTECTED. LIGHTING SHALL BE
CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA SHALL BE SURROUNDED
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE LIMITED TO THE
AWARD. COORDINATE WITH SITE NUMBER OF CLEARANCES REQUIRED TO PERFORM WORK.
TO OBTAIN SECURITY CLEARANCE BADGING IMMEDIATELY FOLLOWING NOTICE OF CONTRACT
CONTRACTOR SHALL SUBMIT SECURITY PAPERWORK FOR CONTRACTOR PERSONNEL THAT ARE
OF THE FLYING PUBLIC.
SERVICES. LOSS OF THIS EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE SAFETY
CONTRACTOR SHALL NOTIFY COTR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL
ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS.
THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR
OF THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUOUS PROTECTION OF
EXISTING FAA AIR TRAFFIC EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT DURATION
SHALL NOT BE PERMITTED.
FACILITY. WORK SHALL BE COORDINATED WITH COTR. DISRUPTION OF THIS FACILITY
CONTRACTOR SHALL USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS
BUILDING MAY BE REQUIRE. COORDINATE REQUIREMENTS WITH COTR.
BUILDING. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COTR. ESCORTS OUTSIDE
FAA ESCORTS SHALL BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHING THE
SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL SHALL REMAIN IN CONSTRUCTION AREAS.
PERSONNEL WHILE IN THE BUILDING. CONTRACTORS VEHICLES SHALL BE MARKED.
CONTRACTOR'S SUPERVISORY PERSONNEL SHALL BE RESPONSIBLE FOR CONDUCT OF THEIR
RESERVES THE RIGHT TO PROHIBIT WORKERS EMPLOYED BY CONTRACTOR TO WORK AT FACILITY.
COTR. TEMPORARY SECURITY BADGES SHALL BE ISSUED TO CONSTRUCTION PERSONNEL. FAA
AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO
ARTCC ARE OFF-LIMITS FOR CONTRACTOR PARKING.
PARKING SHALL BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT
CONTRACTOR'S PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA. ADDITIONAL
6:30 TO 8:00 AM AND 2:00 TO 400 PM. COORDINATE CONTRACTOR DELIVERIES WITH THE COTR.
OTHER THAN FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT OCCUR AT
DELIVERIES SHALL BE SCHEDULED AND APPROVED IN ADVANCED WITH COTR AND AT TIMES
CONTRACTOR SHALL KEEP LOADING DOCK AND ENTRY WAYS ACCESSIBLE AT ALL TIMES.
1) DSR FIRST FLOOR AND DSR ATTIC, ESCORT REQUIRED AT ALL TIMES.
CONTRACTOR'S ACCESS TO BUILDING SHALL BE LIMITED TO THE FOLLOWING LOCATIONS:
AND DIRECT PERSONS NEAR CONSTRUCTION AREAS.
ON SITE. PROVIDE NECESSARY BARRICADES, LIGHTS SIGNAGE AND FENCING TO PROTECT, WARN
PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES
ENTANCE SECURITY GATE.
CONTRACTOR'S VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE THROUGH MAIN
ONGOING PROJECTS.
SHALL BE COORDINATED WITH SITE PERSONNEL VIA COTR; PARTICULARLY IN CONJUNCTION WITH
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA
INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.
OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT
REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENEAL REQUIREMENTS"
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY
C.6
C.5
C.4
C.3
C.2
C.1
D.1
E.1
G.2
G.1
H.1
1.5
I.4
I.3
I.2
I.1
L.2
L.1
M4
M.3
M.2
M.1
CONSTRUCTION STAGING PLAN1
G002 NOT TO SCALE
lo tt e zny-1706239-g002
2020-10-29T13:14:01-0400
DAVID WINKLER
2020-10-29T12:27:51-0400
MICHAEL P LOMBARDI
ZNY-1706239-P001
PLUMBING DETAILS
-p
P2 P1 P4
P2 P1 P3
P4
P8
DN TO SS
3/4" HW & CW
DN TO LAV
3/4" HW/CW
1" CW
1 1/2" 2"
TO WC'S
2" CW DN
1" CW DN TO URN'S
WOMENS
WATER PIPING DETAIL
SANITARY PIPING DETAIL
CO
FD
GRATES
FD NEW
WOMENS
GRATES
FD NEW
HWH
PIPING IN WALLS
REPLACE ALL
P1 & P2
P4
P3
P8
FIXTURE
HOT WATER HEATER
URINAL
LAVATORY
WATER CLOSET
DES. HW CW S V
W.C.
LAV.
UR.
HWH 3/4"
1/2"
3/4"
1"
1/2"
4"1 1/2"
4" & 2"
FIXTURE BRANCH PIPE SIZE SCHEDULE
MAKE UP
1 1/2"BOILER UR UR SS LAV LAV LAV EWC
HCP
WC WC WC WC
3/4" 2" 1" 3/4" 1/2" HW/CWHWH
1/2" 1/2"
CW
HW
S. A. 5010
REPLACE
S. A. 5005
S. A. 50053/4" S. A. 5005
REPLACE ALL DOMESTIC WATER PIPING IN BOTH BATHROOMS
REPLACE ALL DOMESTIC WATER PIPING IN BATHROOMS
BRACKETS
ON STAINLESS
NEW HWH MOUNTED
NOT TO SCALE
NEW WATER RISER DIAGRAM
NOT TO SCALE
NEW SANITARY & VENT RISER DIAGRAM
3"
3"
3" C.O. 3" FD (ID)
C.O.
3" FD
3" V. T. R. 4" V. T. R.
4" 2" 1 1/2" 1 1/2"1 1/2"
3" 2" 2"
4" 4" 2" 1 1/2"
3" FD
4" C.O.
C.O.
WC WC
WC WC
UR UR LAV LAV
LAV LAV
EWC EWC
REPLACE ALL SANITARY PIPING IN WALLS
NO.
PLAN
ROOM 13
LAV1/2" 1/2"
SINK
2.
1.
INSTALL 2" SS DRAIN TO ROOM 13 ADJACENT TO MEN'S REST ROOM.
THE MEN'S REST ROOM.
INSTALL 1/2" HW AND CW LINES TO ROOM 13 ADJACENT TO
-p lo tt e zny-1706239-p001
2020-10-29T13:12:58-0400
DAVID WINKLER
2020-10-29T12:28:20-0400
MICHAEL P LOMBARDI
File details come from the government source that posted it. Updated .