ZMP Gas Unit Heater Replacement.pdf

PDF 362 KB Posted

Attached to
ZMP Multiple Projects
Solicitation number
697DCK-26-R-00062
Issued by

About this file

This document is a set of architectural and engineering drawings for a Unit Heater Replacement project for the Federal Aviation Administration (FAA) at the Air Route Traffic Control Center (ARTCC) in Farmington, Minnesota. The plans detail the replacement of gas-fired unit heaters in the Power Service Building, specifically in the White Engine Generator Room, Kato EG Room, and Garage areas.

The drawings include a ground floor heating plan, heater schedule, and gas connection details. Key specifications include installing new gas-fired unit heaters with two-stage gas valves and wall-mounted thermostats, reconnecting gas and electrical systems, providing new flue gas vent pipes, and supporting unit heaters from ceiling structural steel. The project involves modifying existing supports, reusing existing electrical power sources, and installing new electrical disconnects for each unit. The heaters are Modine HD125 models with specifications including 125 MBH heating input, 100 MBH heating output, and electrical requirements of 120V, 1 phase, 60 Hz.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

F

E

D

C

B

A

0--

N

I n

EXISTING

2" GAS SUPPLY

SEALANT� ·�--��,...........��

RED DEVEL 081 6/01 "-.

AS REQ'D BY LOCAL �

CODES MIN 3'-0" --.=r 12"

(MIN)

2"

19' -4 1/4"

GUH-4

D �

O'.'. w D Oz f---- -<i: (_') O'.'. z ww z w

I

I I

I I 23' -9 1/4"

EXISTING

2" GAS SUPPLY

D N

O'.'. w D Oz f---- -

Cf®

ROOM

<i: (_') O'.'.

z GENERATOR

W W z w

EXISTING GUH-5

2" GAS SUPPLY

D n

O'.'. w oz f---- - <i: (_') O'.'.

z

W W z w

24' -6"

EXISTING

GAS SUPPLY

D

D

GUHt2

D ,tj-

O'.'. w Oz D f---- - <i: (_') O'.'.

z

W W z w

25' -10"

EXISTING

GAS SUPPLY

GUH-1

I f

OFFICE

HALL GAS

r=====:':;==f'l �..,..,.,.=-=' CONNECTION

WORKSHOP

SEE DETAIL

TYP.

PARTIAL POWER SERVICE BUILDING - HEATING GROUND FLOOR PLAN

----FLUE CAP

2"

MIN 18 GAUGE

CARBON STEEL

SEE PLAINS FOR SIZE

10 GAUGE VENTILATED

ROOF SLEEVE

MAX SNOW DEPTH • 16"

SCALE: 1/8" • 1'-0"

INSULATION

ROOF CONSTRUCTION ��:::::;a, SUPPORTS ON (4) SIDES �

LEGEND:

.5 DIA

(6" MIN)

FLUE THRU ROOF

NTS

MARK LOCATION SERVICE

GUH-1 GENERATOR GENERATOR

9"

(MIN)

ST ACK DIAMETER

DIA

� REF

-2 M16

HEATING HEATING

INPUT, MBH OUTPUT, MBH

GUH-2 ROOMS ROOM 1 04 , 1 05 125 100 GUH-3 104,105 EQUIPMENT

GUH-4

GUH-5

GAS FIRED UNIT

PROPELLER FAN DATA

CFM MOTOR RPM MOTOR HP

1980 1625 1 /8

1, PROVIDE HEATERS WITH ALL CEILING WALL MOUNTING ADAPTERS AND ACCESSORIES AS REQUIRED, 2, PROVIDE HEATERS WITH TWO STAGE GAS VALVE, NEW WALL MOUNTED THERMOSTATS.

7 6

HEATER SCHEDULE

AIR TEMP. MAX HEAT ELECTRICAL/MOTOR DATA WEIGHT BASED NOTES RI SE ( DEG F J THROW (FTJ VOLTS PHASE Hz ( LBS J ON

MODINE

47 56 120 1 60 125 MODEL 1 , 2

HD125

5 4

MIN

WING

ONTRO

WING .___�

AUTO

WING

POWER SERVICE BLDG

GENERAL NOTES:

1) ALL WORK, MATERIAL AND INSTALLATION SHALL CONFORM TO THE

REQUIREMENTS OF THE ORDINANCE AND CODE HAVING JURISDICTION.

2l ALL WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATION.

3) ALL WORK SHALL BE PERFORMED IN A NEAT, ACCURATE, WORKMAN-LIKE

AND PROFESSIONAL MANNER.

4) CONTRACTOR SHALL VERIFY ALL DEMOLITION WORK, EXISTING CONDITIONS,

DIMENSIONS ANO NEW INSTALLATION PRIOR TO COMMENCEMENT OF WORK.

5) CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INTERLOCK

CONTROL WIRING REQUIRED FOR PROPER SYSTEM OPERATION.

6) CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL DEMOLITION 8c

NEW CONSTRUCTION WORK WITH FM COR TO MINIMIZE OPERATION

DISRUPTIONS WHILE WORK IS IN PROGRESS.

NEW WORK NOTES:

A FURNISH ANO INST ALL NEW GAS FIRED UNIT HEATERS. RECONNECT PIPING, ELECTRICAL

'\Y' WIRING. PROVIDE ALL REQUIRED CONTROL FOR A COMPLETE FUNCTIONAL SYSTEM.

A PROVIDE NEW FLUE GAS VENT PIPE FROM HEATER EXHAUST. PROVIDE TRANSITION OR

"¢' ADAPTOR AS REQUIRED FROM 4" PIPE TO 6" VENT. EXTEND VENT TO ROOF ANO SEAL

JOINTS PROPERLY FOR PREVENTING LEAKAGE. REFER TO DETAIL 13/M18-2 AND ROOF

MANUFACTURER FOR PROPER FLASHING AROUND VENT.

A\. PROVIDE NEW 1/2" GAS LINE FROM GAS MAIN SUPPLY LINE TO INLET HEATER. INSTALLATION '.;7 OF DIRT LEG SHALL BE PER DETAIL 1. PROVIDE NEW GAS VALVE, UNION AND BALL SHUTOFF

VAL VE. REPAINT NEW GAS LINE WITH YELLOW COLOR TO MATCH EXISTING.

� SUPPORT UNIT HEATER FROM CEILING STRUCTURAL STEEL. PROVIDE NEW ROOS,

'v"' SWAY BRACES ANO ACCESSORIES. MODIFY EXISTING SUPPORTS, HANGERS AS REQUIRED.

� RE-USE EXISTING ELECTRICAL POWER SOURCE. PROVIDE NEW ELECTRICAL WIRING, CABLES

'.;7 AND CONTROL AS REQUIRED.

� PROVIDE NEW ELECTRICAL DISCONNECT TO EACH UNIT INSTALLED AND NEW WIRING FROM

"&' DISCONNECT TO UNIT

A. RECONNECT GAS FLUE VENT PIPING TO EACH UNIT INSTALLED. PROVIDE TRANSISTION OR

'.1/ ADAPTOR AS REQUIRED FROM 4" TO 6" VENT. IF SIGNS OF CORROSION EXIST REPLACE

FLUE. COROINATE WITH COR.

LEGEND

REV

--11..-

APPROVED

DATE

8c ABBREVIATIONS:

POINT OF CONTACT BETWEEN

EXISTING AND NEW WORK

EXISTING WORK

NEW/MODIFIED WORK

SHUTOFF VAL VE <BALL>

UNION

GAS VALVE

DESCRIPTION JCN

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

REDLINE

DATE

H

G

F

E

D

C

APVD

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA �

ARTCC

POWER SERVICE BUILDING

UNIT HEATER REPLACEMENT

WHITE ENGINE GENERATOR ROOM

PLAN

l&J

� ,µ□

I 2J GARAGE

FARMINGTON MN

C �� E

PROJECT ENGINEER

DESIGNED

KEY PLAIN IRS

DRAWN

Vf,C

CHECKED

XXX

3 2

ISSUED BY

ENGINEERING SERVICES

ENROUTE/FSS

MGR: ENGINEERING

DATE

04/20/2024

JCN

DRAWING NO

ZMP-D-ARTCC-M038

REV

A� w

THIS DRAWING PRODUCED ON THE AGL REGION MICROST ATION SYSTEM

ZMP-GL-D-ARTCC-D009
ZMP-GL-D-ARTCC-M038
ZMP-GL-D-ARTCC-M039

File details come from the government source that posted it. Updated .