ZEPH_SAMPLE_CHANGE_ORDER.pdf
PDF 119 KB Posted
- Solicitation number
- 2024-007
- Issued by
- Polk County, Florida
About this file
The document is an AIA Document G701 Change Order form from 2017, which is a standard template used in construction and architectural projects to formally document modifications to an existing contract. While the form is blank and not filled out with specific project details, it is designed to record changes to the original contract's scope, cost, and timeline, requiring signatures from the Architect, Contractor, and Owner to be valid.
The change order form provides spaces to document the original contract sum, previous change orders, and the net effect of the current change order on the contract's total cost and completion timeline. The form includes a section for detailed descriptions of the changes, with a note that any adjustments to the Contract Sum or Guaranteed Maximum Price must be agreed upon by both the Owner and Contractor, and authorized by Construction Change Directives. Despite being associated with a City of Zephyrhills solicitation for onsite clinic management services, this specific document is a blank template and does not contain project-specific information.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .