yell01026_proposed_alignment_vertical_.pdf

PDF 91 KB Posted

Attached to
WY NPS YELL 10(26), Gardner River High Bridge
Solicitation number
69056726R000002
Issued by

About this file

The Vertical Alignment Review Report is a technical document for the Design SurvFt project, created on August 29, 2025, detailing horizontal and vertical alignment specifications for a linear infrastructure project. The report provides precise station and elevation data for multiple alignment elements, including linear and symmetrical parabola segments. Key technical details include varying tangent grades ranging from -0.041 to -0.013, with specific station points, elevation changes, and calculated parameters such as length, entrance and exit grades, and middle ordinates for each alignment element.

The alignment covers a total distance from station 85670.41 to 86941.36, with elevation changes from 6076.046 to 6047.210 feet. The horizontal alignment (ALI-MAIN-01) and vertical alignment (ALI-MAIN-01_prof) both utilize a Baseline style, and the report meticulously tracks the progression of the route through different geometric elements, including linear sections and symmetrical parabolic curves. The document provides comprehensive technical data for engineering and construction planning, capturing the precise vertical profile of the proposed route.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vertical Alignment Review Report Report Created: Friday, August 29, 2025

Time: 7:56:40 AM

Project: Design SurvFt Description:

File Name: c:\pw_work_wfl\d0469951\yell10-26_ali01.dgn Last Revised: 8/29/2025 07:54:59

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: ALI-MAIN-01 Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: ALI-MAIN-01_prof Vertical Description:

Vertical Style: Alignment\Baseline Station Elevation

Element: Linear

START 85670.41 6076.046

VPC 85745.85 6072.965

Tangent Grade: -0.041 Tangent Length: 75.436

Element: Symmetrical Parabola

VPC 85745.85 6072.965

VPI 85805.85 6070.514

VPT 85865.85 6069.244

Length: 120.000

Entrance Grade: -0.041 Exit Grade: -0.021 r = 100 * (g2 - g1) / L: 1.640 K = l / (g2 - g1): 60.984

Middle Ordinate: 0.295

Element: Linear

VPT 85865.85 6069.244

VPC 86808.18 6049.296

Tangent Grade: -0.021 Tangent Length: 942.336

Element: Symmetrical Parabola

VPC 86808.18 6049.296

VPI 86848.18 6048.450

VPT 86888.18 6047.917

Page 1 of 2Vertical Alignment Review Report

8/29/2025

Horizontal Alignment: ALI-MAIN-01 Horizontal Description:

Horizontal Style: Alignment\Baseline Length: 80.000

Entrance Grade: -0.021 Exit Grade: -0.013 r = 100 * (g2 - g1) / L: 0.983 K = l / (g2 - g1): 101.761

Middle Ordinate: 0.079

Element: Linear

VPT 86888.18 6047.917

END 86941.36 6047.210

Tangent Grade: -0.013 Tangent Length: 53.176

Page 2 of 2Vertical Alignment Review Report

8/29/2025

File details come from the government source that posted it. Updated .