Amendment A001.pdf

PDF 6 MB Posted

Attached to
WY NPS YELL 10(26), Gardner River High Bridge
Solicitation number
69056726R000002
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract for the Gardner River High Bridge project (WY NPS YELL 10(26)) in Yellowstone National Park, issued by the Federal Highway Administration. Amendment A001 was issued on January 26, 2026, for Solicitation No. 69056726R000002.

The amendment revises multiple contract sections including SF 1442 representations and certifications with added Masterworks language; updates the Davis-Bacon General Wage Decision WY20260044 to an effective date of January 2, 2026; modifies Special Contract Requirements sections to add Masterworks system requirements for contractor daily records and measurement notes; updates physical data and electronic documentation requirements; revises traffic accommodation dates in Section 156.03 for nighttime road closures from April 1, 2027 through July 1, 2027; and corrects the project number and updates the estimated price range from $5,000,000–$10,000,000 to $20,000,000–$30,000,000. The amendment adds definitions for Masterworks, Basic Contract, and other terms; incorporates requirements for haul plan submission with specific restrictions on vehicle spacing, compression brakes, speed limits, and load coverage within Yellowstone National Park; and includes new specifications for contractor quality control, scheduling requirements, and contractor daily record procedures. Plan sheets D.3, F.3, and S.02 through S.07 have been updated with additional information and drawings. The document requires offerors to acknowledge receipt of the amendment prior to proposal submission and maintains all existing terms and conditions not modified by this amendment.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 01/26/2026 N/A See Blk 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056726R000002

9B. DATED (SEE ITEM 11)

12/31/2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WY NPS YELL 10(26), Gardner River High Bridge

See page 2 and 3.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 01-26-2026 WY NPS YELL 10(26), Solicitation No. 69056726R000002 Gardner River High Bridge

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)

Page A-2 and A-2a. Revises Reps and Certs language and adds Masterworks language.

Page A-5 and A-6. Corrects the project number and name and updates the estimated price range amount.

MINIMUM WAGE SCHEDULE

Page D-1 through D-6. Updates Davis-Bacon General Wage Decision Number

WY20260044 to current effective date of 01/02/2026.

SPECIAL CONTRACT REQUIREMENTS

Pages E-1 through E-3, Subsections 101.03 Abbreviations and 101.004 Definitions. Adds language for Masterworks.

Page E-5, Subsection 102.02A Physical Data. Updates for additional document added.

Pages E-7 through E-10a, Subsections 104.04 Electronic Documentation and 104.11

Other Contracts. Adds language for Masterworks and additional contract information.

Page E-21, Subsection 107.10 Environmental Protection. Adds language for clarifications.

Pages E-29 through E-33a, Subsections 109.01 Measurement of Work and 109.06 Pricing of Adjustments. Add language for Masterworks.

Page E-37, Subsection 153.01 Description. Adds language for Masterworks.

Pages E-44, Subsection 155.01 Description. Adds language for Masterworks.

Pages E-52 through E-53a, Subsection 155.12 Contractor’s Daily Record of Construction

Operations. Revises language and adds language for Masterworks.

Page E-54, Subsection 156.03 Accommodating Traffic During Work. Revises (a)(1) dates.

PLANS

Plan sheet # D.3 Adds additional information and drawings.

Plan sheet # F.3 Adds additional information and drawings.

Amendment No. A001, dated 01-26-2026 WY NPS YELL 10(26), Solicitation No. 69056726R000002 Gardner River High Bridge

Plan sheet # S.02 Adds additional information.

Plan sheet# S.04 Adds additional information.

Plan sheet# S.05 Adds additional information.

Plan sheet# S.06 Adds additional information.

Plan sheet# S.07 Adds additional information.

ENCLOSURES

Pages:

A-2 through A-2A

A-5 through A-6

D-1 through D-6

E-1 through E-3

E-5

E-7 through E-10a

E-21

E-29 through E-33a

E-37

E-44

E-52 through E-53a

E-54

Plan Sheets:

D.3

F.3

S.02

S.04

S.05

S.06

S.07

A-2

Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal. For more details go to FAR Provision 52.204-

8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for Information. Requests for technical information (Plan and Division 100 – 700

Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

PLEASE NOTE: FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work has been removed due to the FAR Overhaul. See the SF-1442 and Block 11 for contract requirements related to the fixed completion date.

Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO

NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the

Contractor Performance Assessment Reporting System (CPARS); for additional information, see

Notice to OFFEROR Revised by Amendment A001 Project: WY NPS YELL 10(26), Gardiner River High Bridge https://www.sam.gov/SAM/ https://www.acquisition.gov/far-overhaul mailto:WFL.Contracts@dot.gov https://www.sam.gov/SAM/

A-2a http://www.cpars.gov/index.htm https://cpars.gov/cparsweb/home. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition

Regulation (FAR), agency supplemental regulations, and the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects, FP-24. An electronic version may be found at https://highways.dot.gov/federal-lands/specs.

Masterworks. Requires the Contractor to use the Government’s web-based system Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes). Attend a training session on the use of Masterworks. The virtual training sessions will be either a video presentation or live training as determined by the

CO. Train additional staff. Submit a user account form to gain access to Masterworks. See

Subsection 103.06.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 104.04.

Material Sources. Material sources, water sources and waste areas have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See

Subsection 105.02(c).

Progress Schedules. This project includes new specifications for Prosecution and Progress and for Schedules for Construction Contracts. Carefully review Special Contract Requirements

Section 108 - Prosecution and Progress, and Section 155 – Schedules for Construction Contracts.

Notice to OFFEROR Revised by Amendment A001 Project: WY NPS YELL 10(26), Gardiner River High Bridge http://www.cpars.gov/index.htm https://highways.dot.gov/federal-lands/specs

A-5

Continuation SF 1442 Revised by Amendment A001 Project: WY NPS YELL 10(26), Gardner River High Bridge IN NP INDU PMS(1), Pavement Preservation Indiana Dunes

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to

4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website SAM.gov.

• Insert the solicitation number in search box.

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

Block 11

Block 12A

Block 13B

FOR DAVIS-BACON WAGE RATE INFORMATION go to the U.S. Department of

Labor, Branch of Construction Wage Determinations Website:

https://www.dol.gov/agencies/whd/government-contracts/state-assignments.

FOR PHYSICAL DATA, Physical Data will be posted with the solicitation on the

SAM.gov website.

COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/19/2027, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 03/30/2026. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Work shall be completed on or before the date specified above, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof.

PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-24, U.S. Customary Units.

BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-

24, U.S. Customary Units.

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/content/home https://www.dol.gov/agencies/whd/government-contracts/state-assignments https://sam.gov/content/home marino.chea Cross-Out

A-6

Continuation SF 1442 Revised by Amendment A001 Project: WY NPS YELL 10(26), Gardner River High Bridge IN NP INDU PMS(1), Pavement Preservation Indiana Dunes

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects FP-24, U.S. Customary

Units.

ESTIMATED PRICE RANGE. The price range of the project work is between $5,000,000 and

$10,000,000. $20,000,000 and $30,000,000.

SUBCONTRACTING PLAN. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. A large business is one whose average gross annual receipts over the past 3 years equal $45 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses marino.chea Cross-Out

D - 1

General Wage Decision

Project: WY NPS YELL 10(26), Gardner River High Bridge

REVISED BY AMENDMENT A001

"General Decision Number: WY20260044 01/02/2026

Superseded General Decision Number: WY20250044

State: Wyoming

Construction Types: Heavy and Highway

Counties: Albany, Big Horn, Campbell, Carbon, Converse, Crook, Fremont, Goshen, Hot Springs, Johnson, Lincoln, Niobrara, Park, Platte, Sheridan, Sublette, Sweetwater, Teton, Uinta, Washakie and Weston Counties in Wyoming.

Heavy and Highway Construction Projects

Modification Number Publication Date

0 01/02/2026

SAWY2025-004 05/01/2025

Rates Fringes

Carpenter........................$ 29.40 5.25

Concrete Finisher................$ 30.12 7.39

Electrician (Inside Wireman, Outside Lineman and Signal and Lighting work)...............$ 58.83 21.89

Equipment Operator

(Electrical work)................$ 48.91 20.61

Groundman (Electrical work)......$ 34.72 17.64

Ironworker.......................$ 46.00 0.00

Laborers (Group 1)...............$ 21.68 0.00

Erector & Installer (fences, guardrail & barrier); Flag persons (traffic control); Form stripper; General laborer;

Heater tender; Material checker; Pick-up truck driver; Pilot car driver; Pre-watering, presetting & pre-irrigation (all work); Riprap man; Tar & asphalt pot tender

Laborers (Group 2)...............$ 22.90 4.08

Asphalt raker and tamper; Bin wall installer; Chain saw operator (clearing & grubbing); Concrete saw (all types); Form setter (paving); Hand operated vibratory roller; High scalar;

Jackhammer & pavement breaker; Maintainer (Traffic Control);

Nozzle man (air, water, gunnite & sandblasting); Landscaper, landscape laborer; Mortar man on stone riprap; Tamper operator

(pneumatic, electric, gas & similar); Painter (brush & spray);

Pipe setter (all pipe types); Pot Tender

D - 2

Laborers (Group 3)...............$ 24.50 6.52

Dump man; Miner (driller), Machineman, Timberman, Steelman;

Drill Doctor, Form setter and mover, Spader, Spilling and/or

Caisson Worker; Powderman, Blaster, Tender; Traffic Control

Supervisor; Wagon drill, air-trac., (diamond and other drills for Blasting powder or grouting).

Power Equipment Operators

(Group 1)........................$ 26.90 5.13

Skid Steer (all attachments); Air Compressor (all types);

Backhoes & Excavators (to 5 CY.); Batch Bin Weighman, Scissorman or Hopper; Broom Operator (self propelled); Chip

Spreader Operator; Conveyor Belt Operator; Crusher Oiler; Form

Grader Operator; Joint Machine Operator; Longitudinal Float

Operator; Oiler, Utility; Power Loader (belt & bucket type);

Pump Operator; Roller Operator, self-propelled (Dirt); Tire

Repairman (large construction equip. tires); Tractor Operator

(farm with/without power attachments); Tugger (all types)

(Group 2)........................$ 28.56 8.01

Articulated Rock Truck (all capacity); Asphalt Plant Operator;

Backhoe, Excavator & Shovel (5 CY. & larger); Batch Plant

Operator; Bituminous Laydown Machine Operator; Concrete Batch

Plant Operator; Concrete Finish Machine Operator; Concrete

Spreader & Paver Operator; Concrete Multi Blade Span Saw

(Hunt process); Crusher Operator; Dozer Operator (all sizes & power attachments); Drilling Machine, Integrated (core, rotary, caisson, or diamond); Draglines, Cranes, Piledriver &

Truck Mounted Cranes (Mfg Rating: less than 3.5 CY. and/or less than 50 tons all attachments); Front End Loaders (up to

10 CY.); Hydro-type Crane (to 50 tons); Mixer Operator, Concrete (over 1 yd.); Motor Patrol Operator (all excluding finish); Mulching Machine Operator; Oiler (crane & shovels);

Pavement Breaker, Hydro-Tamper & similar; Roller Operators, Asphalt (steel & pneumatic); Roto-Milling Machine (under 8 ft.

wide); Scraper Equipment (all types and sizes); Screed

Operator; Trenching Machine Operator

(Group 3)........................$ 32.72 8.10

Draglines, Cranes, Piledrivers & Truck Mounted Cranes (Mfg.

Rating: 3.5 CY. or larger, and/or 50 tons and larger all attachments); Front End Loaders (10 CY. & larger); Heavy Duty

Mechanic; Welder; Hoist Operator (two or more drums, shafts, or raises); Motor Patrol Operator (finish); Roto-Milling

Machine (8 ft. & larger); Mixer Operator (dual drum)

Truck Drivers (Group 1)..........$ 26.01 3.69

""A"" Frame truck driver; Coring Machine (self propelled); Dump

Truck Driver (to and including 13 CY.); Flat Rack Material

Truck Driver (to 5 tons); Fuel Service Truck Driver; Gang

Truck Driver; Gravel Spreader; Greaseman, Tireman, Serviceman;

Oil Distributor Driver (to & including 3,600 gal.); Power

Broom Driver (street sweeper); Snow Plow Driver (the cy. rate of the truck); Transit Mix or Wet Mix Truck Driver; Utility

Winch Truck Driver; Water Truck Driver (to & including 3,600

D - 3 gal.)

Truck Drivers (Group 2)..........$ 28.37 5.93

Dump Truck Driver (13 to 45 CY.); Flat Rack Material Truck

Driver (over 5 tons); Low Boy & Tandem Axle Float Driver;

Multiple Axle Type Truck (semi); Winch Trailer Truck Driver;

Water Truck Driver (3,600 gal. & larger); Oil Distributor

Driver (3,600 gal. & larger); Truck Mechanics

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between

January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive

Order 13658 does not apply to contracts subject only to the

Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

D - 4

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007

6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are

D - 5 based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007

01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

D - 6

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

Washington, DC 20210.

END OF GENERAL DECISION

E-1

DIVISION 100

GENERAL REQUIREMENTS

Section 101. — TERMS, FORMAT, AND DEFINITIONS

01/05/2026 – FP-24

101.03 Abbreviations. Add the following to Subsection (a):

NPS — National Park Service

OHWM or OHW — Ordinary High-Water Mark

TERO — Tribal Employment Rights Office

CDR – Contractor’s Daily Record

101.04 Definitions. Delete the definition of (c) Supplemental agreement under Contract

Modification.

Delete the following definitions and substitute the following:

Award — The written acceptance of an offeror’s proposal by the CO.

Bid — When used in a project package, carries the same meaning as Offer.

Bidder — When used in a project package, carries the same meaning as Offeror.

Bid Guarantee — A form of security assuring that the offeror will not withdraw an offer within the period specified for acceptance and will execute a written Task Order and provide required bonds.

Bid Schedule — The prepared schedule included with the offer forms, containing the estimated quantities of pay items for which unit prices are requested.

Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the ordering of, performance of, and payment for, the prescribed work. Refers to both the Basic Contract and the Task Orders.

Contract Time — The specified time allowed for completion of all Task Order work.

Notice to Proceed — Written notice to the Contractor to start the Task Order work.

Offeror — An individual or legal entity submitting an offer.

Special Contract Requirements Revised by Amendment A001

E-2 DIVISION 100

Project: WY NPS YELL 10(26), Gardner River High Bridge

Payment Bond — The security executed by the Contractor and surety or sureties and provided to the Government to ensure payments as required by law to all persons supplying labor or material according to the Task Order.

Performance Bond — The security executed by the Contractor and surety or sureties and provided to the Government to guarantee completion of the Task Order work.

Project — The specific section of the highway or other property on which construction is to be performed under the Task Order.

Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective offerors.

Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a Task Order obligation.

Work — The providing of labor, material, equipment, and other incidentals required to successfully complete the project according to the Task Order.

Add the following:

Basic Contract — The Indefinite Delivery, Indefinite Quantity (IDIQ) contract which is a written agreement between the Government and the Contractor(s) setting forth the general obligations of the parties for the ordering of, performance of, and payment for, the work to be performed under the subsequent Task Orders.

Holidays — Holidays occur on the following days:

• 1st day of January — New Years’ Day;

• 3rd Monday of January — Martin Luther King, Jr. Day;

• 3rd Monday of February — Presidents' Day;

• Last Monday of May — Memorial Day;

• 19th day of June — Juneteenth National Independence Day;

• 4th day of July — Independence Day;

• 1st Monday of September — Labor Day;

• 2nd Monday of October — Columbus Day;

• 11th day of November — Veterans’ Day;

• 4th Thursday of November — Thanksgiving Day;

• 25th day of December — Christmas Day;

• Other days declared holidays by the Congress or the President; and

• If a holiday occurs on a Saturday, the preceding Friday is also a legal holiday. If a holiday occurs on a Sunday, the Monday following is also a legal holiday.

E-3 DIVISION 100

Project: WY NPS YELL 10(26), Gardner River High Bridge

In-Water Work — Work below the ordinary high-water mark.

Masterworks — A web-based system used by the Government, Contractors, and Subcontractors on this Government contract to prepare CDRs, measurement notes (pay notes and field measurement documentation), and transmit submittals, and documents and drawings.

Offer — A written proposal by an offeror to perform work at a proposed price.

Pneumatic Roller — Self-propelled compaction device with smooth pneumatic tires staggered in position to provide overlap between the front and rear tires.

Task Order — An order for a specific level of work that may or may not be related to one or more projects.

E-5 DIVISION 100

Special Contract Requirements Project: WY NPS YELL 10(26), Gardner River High Bridge

(10) yell01026_Proposed-finish-surface(1of2).xml

(11) yell01026_Proposed-finish-surface(2of2).xml

(12) yell01026_Proposed-subgrade-surface(1of2).xml

(13) yell01026_Proposed-subgrade-surface(2of2).xml

(c) Others.

(1) FLH Bridge Oversized-Overweight Permit Load Request.pdf

(2) yell01026_GRHBrevisedEPA_CompiledSWPP_FinalSigned.pdf

(3) 1570-023P Gardiner River Bridge_Existing UHPC Mix Design.pdf

102.05 Public Opening of Bids. Delete this Subsection and substitute the following:

Public Opening of Offers. Offers will not be publicly opened. After receipt of proposals, price tabulations (bid tabs) will be made publicly available and posted to https://sam.gov/.

If the offeror’s pricing submittal is considered confidential and the offeror does not want pricing released to the public website, provide a justification, in writing, on or before the Task Order proposal due date. The justification shall demonstrate the harm inflicted by the release of the price tabulations to your organization. The CO will analyze the justification and determine if the price tabulations will be posted.

102.05A Contract Award. (Added Subsection).

Follow the requirements in paragraph (f) of FAR Provision 52.215-1, Instructions to Offerors- Competitive Acquisition.

The selection of the successful offeror will be based on lowest price.

102.06 Performance and Payment Bonds. Delete the first paragraph and substitute the following:

Performance and Payment Bonds. Follow the requirements of FAR Clause 52.228-15 Performance and Payment Bonds – Construction. Provide a performance bond and a payment bond each in the penal amount of 100 percent of the original task order price.

Revised by Amendment A001

E-7 DIVISION 100

Section 104. — CONTROL OF WORK

01 JAN 2026 – FP-24

104.04 Electronic Documentation. Delete this Subsection and substitute the following:

Provide documents and drawings electronically using Masterworks.

In addition to electronic documents, provide paper copies of the following documents and as requested by the CO:

(a) ESCP/SWPPP of Record required under Subsection 107.01A; and

(b) Final voucher and release of claims required under Subsection 109.09.

Obtain Masterworks user accounts by completing and signing Form Masterworks 001, Masterworks Access for A/E Staff and Construction Contractors. An electronic version of the form is available at:

https://highways.dot.gov/federal-lands/estimates/forms.

Complete and electronically submit Form Masterworks-001 for each individual requiring

Masterworks access. Allow at least 7 days for system access.

Contact the CO to schedule a training session on the use of Masterworks. The virtual training session will be either a video presentation or live training as determined by the CO. The Contractor is responsible for training additional staff that were not present during the original training session.

Maintain active Masterworks accounts for all Contractor staff who use Masterworks. Notify the

CO within 24 hours after an account holder is reassigned or no longer employed by the Contractor and submit a Form Masterworks-001 requesting their account be disabled.

Provide documents and drawings in their native file format (the format produced by the software that the document and drawing was created in) upon request.

Documents and drawings include but are not limited to correspondence, submittals, measurement notes, reports, plans, diagrams, qualifications, certifications, payrolls, schedules, invoices, mix designs, job-mix formulas, test results, notifications, requests, permits, and agreements.

Provide a resolution quality with color, text, and lines clearly discernible. Submit each document and drawing in an individual file. Name files with a unique document name.

Documents and drawings delivered after 5:00 pm local time will be considered received on the next business day.

The CO will reject documents that are unreadable, corrupted, illegible, or include malicious content.

Special Contract Requirements Revised by Amendment A001 https://highways.dot.gov/federal-lands/estimates/forms

E-8 DIVISION 100

104.06 Specifications and Drawings.

(b)(2) Add the following:

(t) Temporary containment, work platforms, and access for steel coating.

(b)(3) Add the following:

(i) Temporary support structure and load rating for temporary support structure according to Section 562;

(j) Falsework for approach span slabs and floor beam repair;

(k) Construction loading as specified in Section 563.

104.07 Coordination of Contract Documents. Delete this Subsection and substitute the following:

Coordination of Contract Documents. The FAR, TAR, Basic Contract, Special Contract

Requirements (SCR), plans, and Standard Specifications are contract documents. A requirement in one document is binding as though occurring in all the contract documents. The contract documents are intended to be complementary and to describe and provide for a complete contract.

In case of discrepancy, calculated and shown dimensions govern over scaled dimensions. The contract documents govern in the following order:

(a) FAR;

(b) TAR;

(c) Basic IDIQ Contract;

(d) SCR;

(e) Plans; and

(f) Standard Specifications.

104.08 Load Restrictions. Add the following:

Submit oversized and overweight permit requests for non-legal loads transported within the

Yellowstone National Park boundary. Use the FLH Bridge Oversized/Overweight Permit Load

Request form listed under Subsection 102.02A.

104.09 Construction Loading of Structures. Add the following:

Provide additional construction loading requirements on Gardner River Bridge truss sections according to Section 563.

E-9 DIVISION 100

Project: WY NPS YELL 10(26), Gardner River High Bridge

104.11 Other Contracts. Add the following:

Yellowstone National Park (YNP) will be performing construction projects that may have an effect on the operations of this project. The known projects and their anticipated year(s) of construction are as follows:

(a) 2023 to 2026 Yellowstone River Bridge Replacement. Located at the Northeast Entrance

Road /Tower Junction.

(b) 2025 to 2026 Rescue Creek Bridge Replacement, Located on North Entrance Road.

(c) 2025 to 2026 Rehabilitate Laurel Dorm. Located in Old Faithful complex.

(d) 2025 to 2027 Replace Old Faithful Water Plant. Located near Old Faithful complex.

(e) 2025-2027 Norris to Golden Gate Phase 3, Located on the Grand Loop Road between

Norris Geyser Basin and Mammoth.

(f) 2025 to 2028 Rehabilitate Fort Yellowstone Historic Structures. Located in Mammoth.

(g) 2025 to 2029 (Diamond Communication) Installation of Fiber Optic Line. Located on all segments of the North Entrance Road, Grand Loop Road, and South Entrance Road.

(h) 2026 Bridge Preservation Project.

(i) 2026 to 2029 Madison River Bridge, Located on West Entrance Road.

(j) 2028 to 2032 Northeast Entrance Road, Phase 1 Road Reconstruction. Located on the

Northeast Entrance Road.

(k) 2027 to 2031 Mammoth to Gardiner Road, Located on North Entrance Road.

(l) 2026 to 2027 Gardner River High Bridge Annual Inspection. Inspection is performed once per year for a maximum duration of 3 days between August and October by rope access or

Under Bridge Inspection Vehicle (UBIV). Access to all areas of the bridge is required, including access onto work platforms and within containment. If inspection occurs by UBIV, move staged equipment and vehicles within the closed lane to accommodate UBIV placement.

Coordinate each year with the CO for the notification of exact inspection dates and details.

Various portions of the roadway throughout the Park will be undergoing fog and chip seal treatment. Contact Marty Powell of the National Park Service at 307-344-2358 for locations.

Various portions of the roadway throughout the Park will be undergoing fog/chip seal treatment.

Contact Marty Powell of the NPS at 307-344-2358 for locations.

E-10 DIVISION 100

Project: WY NPS YELL 10(26), Gardner River High Bridge

104.12 Haul Restrictions. (Added Subsection).

(a) Haul plan. Submit a haul plan to the CO according to Subsection 104.03 at least 14 days before utilizing any entrances to Yellowstone National Park. Include the following in the plan:

(1) The name and authority of the personnel that will be monitoring and inspecting the haul plan for compliance with the restrictions outlined in thus Subsection;

(2) How the haul plan information and restrictions will be conveyed to all subcontractors and suppliers prior to entry into Yellowstone National Park;

(3) The process for coordinating the mobilization of contractor and subcontractor equipment into and out of Yellowstone National Park;

(4) The specific process for aggregate haul, concrete deliveries, bridge construction material deliveries, and oversized loads;

(5) The inspection frequency for ensuring the requirements of this Subsection are being followed;

(6) How the inspections will be documented; and

(7) What corrective actions will be taken if inspection reveals the work is not meeting the contract requirements.

The CO may waive any of the haul restrictions for a period of time if written request is submitted and conditions or mitigating measures are proposed such that the haul would result in minimal disturbance to visitors and residents of the Yellowstone National Park.

(b) Haul restrictions. Comply with the requirements of YNP Size and Weight Limitation of

Traffic included in this contract (See Section I). Park-wide hauling restrictions are as follows:

(1) From July 1 to September 10 (dates inclusive), conduct hauling only between the hours of 5:00 a.m. and 9:00 a.m. and between the hours of 2:00 p.m. and 10:00 p.m.;

(2) From September 11 to June 30 (dates inclusive), conduct hauling only between the hours of 5:00 a.m. and 10:00 p.m.;

(3) Between the hours 5:00 a.m. and 10:00 p.m., space hauling vehicles entering through

YNP entrances 15 minutes apart to prevent traffic congestion.;

(4) When delaying five or more vehicles, hauling vehicles shall use available turnouts to let traffic pass;

(5) Do not use compression brakes on hauling vehicles within five miles of in-park campgrounds and developed areas (includes West Yellowstone, Madison, Gardiner, Mammoth, Cooke City, Tower, Norris, Canyon, Old Faithful, Lake, Grant, South Teton, Grand Teton, and Jackson).;

E-10a

Project: WY NPS YELL 10(26), Gardner River High Bridge

Locations of in-park campgrounds can be found at:

https://www.nps.gov/yell/planyourvisit/campgrounds.htm

(6) Restrict hauling vehicle speeds within Park boundaries to 35 miles per hour, during one hour before dusk until one hour after dawn;

(7) Within the project limits, restrict hauling vehicle speeds to 25 miles per hour, or the posted speed limit, whichever is less; and

(8) Unless permitted according to 104.08, do not exceed legal loads when transporting materials or equipment over bridges;

(9) Loads are required to be covered while hauling inside the Park, except within the project limits. Secure all loads according to state, city, or county regulations when hauling outside of the Park https://www.nps.gov/yell/planyourvisit/campgrounds.htm

E-21 DIVISION 100

Project: WY NPS YELL 10(26), Gardner River High Bridge

(6) Tribal, state and local approvals. Comply with applicable laws regarding the proposed activities. Submit copies of required clearances, including hazardous waste compliance, tribal, State and local permits and approvals.

Add the following:

(e) Other requirements. Comply with the following requirements:

(1) Do not perform in-water work.

(2) Use biodegradable vegetable-based oil in any equipment that operates over or reaches into wetlands or waters of the US.

(3) Do not conduct vegetation clearing operations between March 1 and August 31 (dates inclusive) to avoid impacting nesting birds, unless approved by a Yellowstone National Park Biologist and the CO.

(4) Do not clear trees or vegetation that contains occupied bird nests. If active bird nests are identified during clearing operations; immediately suspend operations within 500 feet of the nest and notify the CO within 1 hour. Obtain approval from the CO before restarting operations.

(5) Notify CO within 24 hours of locating a dead, injured, or sick endangered or threatened species. Listed wildlife species include Grizzly bear, Canada lynx, Northern wolverine and Monarch butterfly. Provide CO date, time, precise location of the injured animal or carcass, and any other pertinent information. Do not disturb any evidence associated with the specimen.

(6) Do not disturb, feed, or approach any wildlife species (e.g., reptiles, birds, raptors, or bats) found nesting, hibernating, or otherwise living in, or immediately nearby, worksites.

(7) Do not allow equipment to idle longer than 10 minutes.

(8) Conduct machinery maintenance and refueling at a distance of 200 feet or greater from any wetlands or waters. Refueling of equipment may occur within 200 feet of waterbodies if approved by the CO and spill prevention measures are in place.

(9) Park Orientation sessions. Notify the CO at least two weeks before starting work so an orientation session can be coordinated. All Contractor and subcontractor employees are required to attend park orientation sessions before commencing work. Orientation sessions shall include information about park values, regulations, and appropriate housekeeping. It will be the responsibility of the prime Contractor to ensure all new subcontractors attend orientations on Park policies. Notify the CO of all orientations that are being conducted.

(10) Grizzly bear and wolf. Notify the CO within ½ hour if:

(a) A grizzly bear or wolf remains within 650 feet of construction activities;

E-29 DIVISION 100

Section 109. — MEASUREMENT AND PAYMENT

05 JAN 2026 – FP-24

109.01 Measurement of Work. Delete the fourth paragraph and substitute the following:

For individual pay items, the decimal accuracy for measurement of quantities will be determined by the CO.

Delete Table 109-1.

Delete the sixth paragraph.

Delete the seventh paragraph and substitute the following:

Prepare, sign, and submit electronic measurement notes (pay notes and supporting field documentation) using Masterworks. Assign measurement note quantities to the correct funding source and account description for the work performed as designated in the plans. Unacceptable measurement notes will be electronically rejected and returned. Correct rejected measurement notes and resubmit them using Masterworks.

Delete this Subsection and substitute the following:

Measurement of Work. Take and record measurements and perform calculations to determine pay quantities for invoicing for work performed. Take or convert all measurements of work according to U.S. Customary measure.

Unless otherwise specified, measure when the work is in-place and complete according to the contract. Measure the actual work performed, except do not measure work outside the design limits or other adjusted or specified limits (staked limits). Measure structures to the lines according to the plans or to approved lines adjusted to fit field conditions.

Take measurements as described in Subsection 109.02 unless otherwise modified by the

Measurement Subsection of the Section controlling the work being performed. For individual pay items, the decimal accuracy for measurement of quantities will be determined by the CO. Decimal accuracy for measurement is one decimal beyond the accuracy of the quantity for payment.

Prepare, sign, and submit measurement notes and supporting field note documentation using an approved format. Unacceptable measurement notes will be rejected and returned. Correct rejected measurement notes and resubmit.

Submit measurement notes within 24 hours of completing work that is in-place and complete according to the contract. For on-going work, submit measurement notes weekly or as approved.

When work is not complete, identify the measurement as being an interim measurement. Submit the final measurement when the work is completed. Measurement notes form the basis of the

Government’s receiving reports described in Subsection 109.08(c).

Include the following information in the measurement notes:

E-30 DIVISION 100

Project: WY NPS YELL 10(26), Gardner River High Bridge

(a) Project number and name;

(b) Line item number, pay item number and description;

(c) Date the work was performed;

(d) Location of the work;

(e) Measured quantity;

(f) Calculations made to arrive at the quantity;

(g) Supporting sketches and details as needed to clearly define the work performed and the quantity measured;

(h) Names of persons measuring the work;

(i) Identification as to whether the measurement is interim or final; and

(j) Signed certification statement by the persons taking the measurements and performing the calculations, that the measurements and calculations are correct.

Prepare pay item measurement notes on Form FHWA 17-348 Daily Record of Measurement and

Payment. An electronic version of the form is available at:

https://highways.dot.gov/federal-lands/construction/forms-wfl.

109.02(d)(1)(a) Average end area method. Delete this Subsection and substitute the following:

(a) Average end area method. Take cross-sections of the original ground. Use design or staked templates to determine end areas. Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas.

109.03 Weighing Procedures and Devices. Amend as follows:

Delete the first paragraph of Subsection (c) and substitute the following:

(c) Project weighing system. Provide, erect, and maintain approved automatic digital scales.

For small quantities, manual scales may be used when approved in writing and if the method of weighing meets all other contract requirements. Provide scales that record mass at least to the nearest 100 pounds. Maintain the scale accuracy to within 0.5 percent of the correct mass throughout the calibration range of the scale.

Delete Subsection (c)(2) and substitute the following:

(2) Task Order line item…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .