A8_Amendment A001.pdf

PDF 1 MB Posted

Attached to
Janitorial and Related Services, Jeffersonville IN
Solicitation number
YB1323-12-RP-0027
Issued by

About this file

Amendment A001 - Janitorial Services

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

guilf301 Highlight guilf301 Highlight

Continuation Page

PAGE 2 OF 7 YB1323-12-RP-0027/A001

Continued from Block 14...

Section L, Page 104, Item 13.3 Submission Deadline -- Change submission date from 27 June 2012 to 26 July 2012.

Insert attached - Attachment J.9 BUILDING INFORMATION - in Section J, immediately behind page 91.

All other terms and conditions remain unchanged.

Attachment Page

PAGE 3 OF 7 YB1323-12-RP-0027/A001

J.9 BUILDING INFORMATION

Location: U. S. Census Bureau - National Processing Center - Jeffersonville, IN

Building Data: Bldg. 40

Number of Stories: 1

Building Statistics:

Gross area..........................17,384 SF Occupiable area.................15,765 SF Net cleaning area 1/.............2,400 SF

Warehouse........2,400 SF Outside area to be policed. 90,000 SF Turf area............................35,900 SF Sidewalk, plaza, ramp.............200 SF Parking lot area..................53,900 SF

Building Data: Bldg. 60

Number of Stories:

Building Statistics:

Gross area........................161,832 SF Occupiable area...............123,547 SF Net cleaning area 1/.........160,361 SF

Office.......152,506 SF Warehouse. . .7,855 SF

Outside area to be policed253,943 SF Turf area..........................147,933 SF Sidewalk, plaza, ramp........10,680 SF Parking lot area..................95,330 SF

Building Data: Bldg. 61

Number of Stories:

Building Statistics:

Gross area........................166,920 SF

PAGE 4 OF 7 YB1323-12-RP-0027/A001

Occupiable area...............129,114 SF Net cleaning area 1/.........165,500 SF

Office..........141,724 SF Warehouse....23,776 SF

Outside area to be policed147,560 SF Turf area …………………21,740 SF Parking lot area................125,820 SF

Building Data: Bldg. 62 (Heating Plant)

Number of Stories:

Building Statistics:

Gross area............................8,060 SF Occupiable area......................510 SF Net cleaning area 1/.............8,342 SF

Office.................510 SF Warehouse.....7,832 SF

Outside area to be policed. 84,015 SF Parking lot area..................84,015 SF

Building Data: Bldg. 63

Number of Stories:

Building Statistics:

Gross area........................161,331 SF Occupiable area...............118,251 SF Net cleaning area 1/.........141,019 SF

Office........134,702 SF Health............1,780 SF Warehouse.....4,537 SF

Outside area to be policed119,058 SF Turf area............................52,395 SF Sidewalk, plaza, ramp........16,800 SF Parking lot area..................49,863 SF

Building Data: Bldg. 64

Number of Stories:

PAGE 5 OF 7 YB1323-12-RP-0027/A001

Building Statistics:

Gross area........................161,632 SF Occupiable area...............127,997 SF Net cleaning area 1/.........160,356 SF

Office........157,216 SF Warehouse.....3,140 SF

Outside area to be policed587,307 SF Turf area..........................207,475 SF Sidewalk, plaza, ramp........16,800 SF Parking lot area................363,032 SF

Building Data: Bldg. 65

Number of Stories:

Building Statistics:

Gross area..........................17,544 SF Occupiable area...................1,109 SF Net cleaning area 1/...........17,085 SF

Office...............898 SF Warehouse...16,187 SF

Outside area to be policed. 30,550 SF Turf area............................23,800 SF Parking lot area....................6,750 SF

Building Data: Bldg. 66 (Administrative Bldg.)

Number of Stories:

Building Statistics:

Gross area........................116,660 SF Occupiable area.................87,121 SF Net cleaning area 1/.........113,768 SF

Office........107,734 SF Warehouse.....6,034 SF

Outside area to be policed533,217 SF Turf area..........................196,237 SF Sidewalk, plaza, ramp........24,829 SF Parking lot area................316,775 SF

PAGE 6 OF 7 YB1323-12-RP-0027/A001

Building Data: Bldg. 71

Number of Stories

Building Statistics:

Gross Area.......................169,245 SF Occupiable area...............141,827 SF Net cleaning area 1/........ 168,846 SF

Office.........128,117 SF Warehouse...40,729 SF

Outside area to be policed248,025 SF Turf area..........................136,382 SF Sidewalk, plaza, ramp..........1,928 SF Parking lot area................109,715 SF

Building Data: Bldg. 75 (Exercise Facility)

Number of Stories:

Building Statistics:

Gross area............................3,388 SF Occupiable area...................2,693 SF Net cleaning area 1/.............3,109 SF

Health...............300 SF Office............2,809 SF

Outside area to be policed. 19,891 SF Turf area............................15,870 SF Sidewalk, plaza, ramp.............565 SF Parking lot area....................3,456 SF

Building Data: Bldg. 87 (Training Facility)

Number of Stories:

Building Statistics:

Gross area............................7,800 SF Occupiable area...................5,799 SF Net cleaning area 1/.............7,297 SF

Office............6,885 SF Warehouse........412 SF

Outside area to be policed139,675 SF Turf area............................63,100 SF

PAGE 7 OF 7 YB1323-12-RP-0027/A001

Sidewalk, plaza, ramp..........1,450 SF Parking lot area..................75,125 SF

Building Data: Bldg. 89 (Outside Cleaning Only)

Number of Stories:

Building Statistics:

Outside area to be policed100,077 SF Turf area............................72,471 SF Parking lot area..................27,606 SF

Building Data: Bldg. 91

Number of Stories:

Building Statistics:

Gross area..........................25,980 SF Occupiable area.................20,290 SF Net cleaning area 1/...........20,290 SF

Office………. 20,290 SF Outside……. 129,655 SF

Outside area to be policed129,655 SF Turf area..........................121,974 SF Sidewalk, plaza, ramp...............36 SF Parking lot area....................7,644 SF

FOOTNOTE:

1. That part of the building is to be cleaned by the Contractor. This includes corridors, entrances, lobbies, office space, storage space, ramps, docks, and garages. Although restrooms are also to be cleaned by the Contractor, this figure does not include their square footage.

Descript: .

The purpose of this Amendment is to correct submission date shown in Section L and incorporate Attachment J.9 into the solicitation.

...See Continuation Page

Descript1:
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 7
DocNo: A001
EffDate: JUN 07, 2012
ReqNo: BCYB1323-12-00223
ProjNo:
IssuedByCode: 2-JEFF
IssuedBy: US CENSUS BUREAU - NPC

BLDG 66, ROOM 149

1201 E 10TH STREET

JEFFERSONVILLE IN 47132

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolChg: Yes
AwdChg: Off
SolNo: YB1323-12-RP-0027
SolDate: JUN 06, 2012
AwdNo:
AwdDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
Header:
15B. CONTRACTOR/OFFEROR:
Footer1:
signature:

File details come from the government source that posted it. Updated .