YANB21-1566-A2-Floor Plan.pdf
PDF 548 KB Posted
- Solicitation number
- 08262026Vogelweh
About this file
This document is a floor plan and design specification for a renovation and expansion project at Ramstein Air Base in Germany. The project involves modifications to Building 1058 to establish a satellite fire station at Vogelweh Family Housing, with construction divided into two phases.
Phase 1 encompasses the alteration of the existing Building 1058, including 20 rooms totaling 322.53 square meters of floor area and 356.40 meters of perimeter. The scope includes bedroom conversions (5 sleeping quarters of 12.49 m² each), common areas (two day rooms totaling 42.68 m²), kitchen and dining facilities (31.76 m²), training room (19.12 m²), laundry facilities (5.87 m²), toilets for both genders (37.20 m² combined), and associated support spaces. Finishes specified include new flooring (with walkoff carpet in entry areas and new flooring in sleeping/common areas), wall treatments (paint and wall tiles in wet areas), and suspended ceiling installations. Phase 2 involves an addition for a vehicle bay expansion, with 7 new rooms totaling 317.39 square meters, including a large vehicle storage area (207.84 m²), equipment room (36.00 m²), decontamination spaces, and supporting facilities. Phase 2 finishes include epoxy flooring for vehicle and equipment areas and sandwich panel construction. The drawing is dated 06 November 2025 at 30% design status and is prepared for the United States Air Forces in Europe, 435 Combat Training Squadron.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
Schlafraum 1 A: 12.49 m² P: 14.22 m
Schlafraum 2 A: 12.49 m² P: 14.22 m
Schlafraum 3 A: 12.49 m² P: 14.22 m
Schlafraum 4 A: 12.49 m² P: 14.22 m
Schlafraum 5 A: 12.49 m² P: 14.22 m
Komm-Raum A: 10.48 m² P: 13.02 m
Eingang A: 4.32 m² P: 8.44 m
Anschlussraum A: 9.66 m² P: 12.44 m
Schichtleiter Büro A: 8.22 m² P: 11.51 m
Aufenthaltsraum 2 A: 24.01 m² P: 19.94 m
Flur A: 36.90 m² P: 44.44 m
Küche, Esszimmer A: 31.76 m² P: 22.60 m
Flur A: 13.25 m² P: 19.16 m
4.1651.964.961.231.911.231.911.231.911.231.911.232.285
3953.36152.47153.60153.18153.18153.18153.18153.18395
6.0027.16
2.471.451.451.451.451.45
6.
2.
2.
3.
2.
5.
6.
6.
2.
2.
1.
1.
1.
1.
1.
1.
2.
3.
1.
2.
3.
.6
1.
2.
1.
1.
Damentoilette A: 9.02 m² P: 12.09 m
A
Schichtl. Schlafraum A: 9.75 m² P: 12.49 m
Aufenthaltsraum 1 A: 18.67 m² P: 18.13 m
DU
Waschküche A: 5.87 m² P: 9.72 m
WMTR
Schulungsraum A: 19.12 m² P: 18.28 m
Herrentoilette A: 28.18 m² P: 40.84 m
Feuerwehrauto "Large Vehicle"
Fahrzeugraum A: 207.84 m² P: 64.45 m
Sportraum A: 30.86 m² P: 22.22 m
Patio
CC
BB
AA
5.
1.
4.
1.
1.
2.
4.
7.
3.
.0
2.
4.
2.
14.001.1354.865
1010.431752.85151.85154.19510
20.00
2.13
6.
9.
3.963.963.963.963.9610
Flur A: 11.48 m² P: 15.83 m
EMT
A: 9.19 m² P: 12.15 m
R ep ai rs
W er ks ta tt
Besucher Eingang
N ut ze r
H au pt ei ng an g
6.
3.
6.
3.
A
A
BB
C
C
D D
20.00
10 12.125 175 7.50 10
20.00
Ausrstung A: 36.00 m² P: 24.60 m
F90
F90
1.
2.
1.
2.
1.
1.
4.
1.
4.
1.
6.
3.
.4
6.
.0
2.
2.
4.
4.
2.
14.15 2.50 10.51
1.
2.
1.
6.
2.
Anschlussraum A: 13.52 m² P: 14.84 m
Schläuse A: 5.97 m² P: 10.15 m
Sprinklerraum A: 33.38 m² P: 27.26 m
2.285 1.23 1.91 1.23 1.91 1.23 1.91 1.23 1.71 99 1.81 1.10 6.43 1.04 1.145
395 3.125 15 3.165 15 3.24 15 4.07 15 5.25 15 3.26 30 3.21 395
27.16
1.45 1.45 1.45 1.45 2.47 1.12 2.47
3.00 3.00
RÄUME
Nr Name
Allgemein
Boden Wand Decke
Oberflächen
Fläche Umfang
Fläche & Umfang
Eingang
Flur
Küche, Esszimmer
Flur
Schlafraum 1
Schlafraum 2
Schlafraum 3
Schlafraum 4
Schlafraum 5
Schichtl. Schlafraum
Schichtleiter Büro
Aufenthaltsraum 1
Schulungsraum
Aufenthaltsraum 2
Komm-Raum
Waschküche
Herrentoilette
Damentoilette
Anschlussraum
Sportraum walkoff carpet new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring floor tiles floor tiles floor tiles existing rubber tiles new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint wall tiles wall tiles wall tiles / paint paint walls paint susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp, ceiling paint ceiling paint
4.32 m²
13.25 m²
31.76 m²
36.90 m²
12.49 m²
12.49 m²
12.49 m²
12.49 m²
12.49 m²
9.75 m²
8.22 m²
18.67 m²
19.12 m²
24.01 m²
10.48 m²
5.87 m²
28.18 m²
9.02 m²
9.66 m²
30.86 m²
322.53 m²
8.44 m
19.16 m
22.60 m
44.44 m
14.22 m
14.22 m
14.22 m
14.22 m
14.22 m
12.49 m
11.51 m
18.13 m
18.28 m
19.94 m
13.02 m
9.72 m
40.84 m
12.09 m
12.44 m
22.22 m
356.40 m
PHASE 1: Alter Bldg. 1058 / Umbau der Geb. 1058
RÄUME
Nr Name
Allgemein
Boden Wand Decke
Oberflächen
Fläche Umfang
Fläche & Umfang
Flur
Schläuse
Fahrzeugraum
Ausrstung
Anschlussraum
EMT
Sprinklerraum epoxy flooring epoxy flooring epoxy flooring epoxy flooring epoxy flooring epoxy flooring epoxy flooring new paint new paint new paint paint walls new paint new paint new paint susp. ceiling sandwich panels sandwich panels paint sandwich panels sandwich panels paint
11.48 m²
5.97 m²
207.84 m²
36.00 m²
13.52 m²
9.19 m²
33.38 m²
317.39 m²
15.83 m
10.15 m
64.45 m
24.60 m
14.84 m
12.15 m
27.26 m
169.28 m
PHASE 2: Add Vehicle Bay / Anbau Fahrzeughalle
FLOOR PLAN, Sc. 1:100
GRUNDRISS, M 1:100
INDEX DATE NAME
DESIGN STATUS:
UNITED STATES AIR FORCES IN EUROPE
435 CTS
AN DER SCHWARZBACH
66877 RAMSTEIN
GERMANY
TEL: 06371-47-7290
DRAWINGS ARE 435 CTS PROPERTY
UNAUTHORIZED COPIES ARE PROHIBITED
PROJECT
DRAWING TITLE
DRAWING BY
ENGINEER
PROJECT MANAGER
ENGINEERING FLIGHT CHIEF
WORK ORDER NO.
FILE NO.
DATE
SCALE
DWG. NO.
SHEET FORMAT
DESCRIPTION
DEPARTMENT OF THE AIR FORCE
435 CTS
OPC 02 BOX 103
APO AE 09094-9002
DSN: 314-480-7290
30%
ADD / ALTER BLDG. 1058 FOR
SATELLITE FIRE STATION 8
VOGELWEH FAMILY HOUSING
FLOOR PLAN
GRUNDRISS
S. MIRKOVA
R. SCHRADE
T. LENHARD
B4229
YANB 21-1566
06 NOV 2025
1:100
A2
DIN A1
Modifications / Umbauplanung Existing / Bestand Demolition / Abbruch New design / Neu
N
| Sheets and Views |
| A2-Floor Plan |
| 2025-11-13T11:18:49+0100 | |
| SCHRADE.RALF.1275513969 |
File details come from the government source that posted it. Updated .