YANB21 1566 A2 Floor Plan.pdf
PDF 548 KB Posted
- Attached to
- Steel Structure Combo
- Solicitation number
- F3N0425339A001
About this file
This document is an architectural floor plan for a 30% design status renovation project at United States Air Forces in Europe (USAFE) Ramstein Air Base in Germany. The project involves the addition and alteration of Building 1058 to establish a Satellite Fire Station 8 at Vogelweh Family Housing.
Phase 1 encompasses renovation of the existing Building 1058 with 20 spaces totaling 322.53 square meters of floor area and 356.40 meters of perimeter. Planned modifications include new flooring (walkoff carpet, new flooring, and floor tiles), new paint finishes, suspended ceilings, and wall treatments across bedrooms, common areas, kitchen/dining, toilets, training room, sports room, and support spaces. Phase 2 involves construction of an additional vehicle bay with seven spaces totaling 317.39 square meters, including a large vehicle garage (207.84 m²), equipment room, airlock, connector space, emergency medical technician (EMT) area, and sprinkler room. Phase 2 finishes include epoxy flooring, new paint, and sandwich panel construction. The project is prepared by the 435 CTS (Communications and Information Systems Squadron) at Ramstein, with engineering oversight provided by the Engineering Flight. The drawing is scaled at 1:100 format and dated November 6, 2025, with work order number B4229 YANB 21-1566.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
Schlafraum 1 A: 12.49 m² P: 14.22 m
Schlafraum 2 A: 12.49 m² P: 14.22 m
Schlafraum 3 A: 12.49 m² P: 14.22 m
Schlafraum 4 A: 12.49 m² P: 14.22 m
Schlafraum 5 A: 12.49 m² P: 14.22 m
Komm-Raum A: 10.48 m² P: 13.02 m
Eingang A: 4.32 m² P: 8.44 m
Anschlussraum A: 9.66 m² P: 12.44 m
Schichtleiter Büro A: 8.22 m² P: 11.51 m
Aufenthaltsraum 2 A: 24.01 m² P: 19.94 m
Flur A: 36.90 m² P: 44.44 m
Küche, Esszimmer A: 31.76 m² P: 22.60 m
Flur A: 13.25 m² P: 19.16 m
4.1651.964.961.231.911.231.911.231.911.231.911.232.285
3953.36152.47153.60153.18153.18153.18153.18153.18395
6.0027.16
2.471.451.451.451.451.45
6.
2.
2.
3.
2.
5.
6.
6.
2.
2.
1.
1.
1.
1.
1.
1.
2.
3.
1.
2.
3.
.6
1.
2.
1.
1.
Damentoilette A: 9.02 m² P: 12.09 m
A
Schichtl. Schlafraum A: 9.75 m² P: 12.49 m
Aufenthaltsraum 1 A: 18.67 m² P: 18.13 m
DU
Waschküche A: 5.87 m² P: 9.72 m
WMTR
Schulungsraum A: 19.12 m² P: 18.28 m
Herrentoilette A: 28.18 m² P: 40.84 m
Feuerwehrauto "Large Vehicle"
Fahrzeugraum A: 207.84 m² P: 64.45 m
Sportraum A: 30.86 m² P: 22.22 m
Patio
CC
BB
AA
5.
1.
4.
1.
1.
2.
4.
7.
3.
.0
2.
4.
2.
14.001.1354.865
1010.431752.85151.85154.19510
20.00
2.13
6.
9.
3.963.963.963.963.9610
Flur A: 11.48 m² P: 15.83 m
EMT
A: 9.19 m² P: 12.15 m
R ep ai rs
W er ks ta tt
Besucher Eingang
N ut ze r
H au pt ei ng an g
6.
3.
6.
3.
A
A
BB
C
C
D D
20.00
10 12.125 175 7.50 10
20.00
Ausrstung A: 36.00 m² P: 24.60 m
F90
F90
1.
2.
1.
2.
1.
1.
4.
1.
4.
1.
6.
3.
.4
6.
.0
2.
2.
4.
4.
2.
14.15 2.50 10.51
1.
2.
1.
6.
2.
Anschlussraum A: 13.52 m² P: 14.84 m
Schläuse A: 5.97 m² P: 10.15 m
Sprinklerraum A: 33.38 m² P: 27.26 m
2.285 1.23 1.91 1.23 1.91 1.23 1.91 1.23 1.71 99 1.81 1.10 6.43 1.04 1.145
395 3.125 15 3.165 15 3.24 15 4.07 15 5.25 15 3.26 30 3.21 395
27.16
1.45 1.45 1.45 1.45 2.47 1.12 2.47
3.00 3.00
RÄUME
Nr Name
Allgemein
Boden Wand Decke
Oberflächen
Fläche Umfang
Fläche & Umfang
Eingang
Flur
Küche, Esszimmer
Flur
Schlafraum 1
Schlafraum 2
Schlafraum 3
Schlafraum 4
Schlafraum 5
Schichtl. Schlafraum
Schichtleiter Büro
Aufenthaltsraum 1
Schulungsraum
Aufenthaltsraum 2
Komm-Raum
Waschküche
Herrentoilette
Damentoilette
Anschlussraum
Sportraum walkoff carpet new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring new flooring floor tiles floor tiles floor tiles existing rubber tiles new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint new paint wall tiles wall tiles wall tiles / paint paint walls paint susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp. ceiling susp, ceiling paint ceiling paint
4.32 m²
13.25 m²
31.76 m²
36.90 m²
12.49 m²
12.49 m²
12.49 m²
12.49 m²
12.49 m²
9.75 m²
8.22 m²
18.67 m²
19.12 m²
24.01 m²
10.48 m²
5.87 m²
28.18 m²
9.02 m²
9.66 m²
30.86 m²
322.53 m²
8.44 m
19.16 m
22.60 m
44.44 m
14.22 m
14.22 m
14.22 m
14.22 m
14.22 m
12.49 m
11.51 m
18.13 m
18.28 m
19.94 m
13.02 m
9.72 m
40.84 m
12.09 m
12.44 m
22.22 m
356.40 m
PHASE 1: Alter Bldg. 1058 / Umbau der Geb. 1058
RÄUME
Nr Name
Allgemein
Boden Wand Decke
Oberflächen
Fläche Umfang
Fläche & Umfang
Flur
Schläuse
Fahrzeugraum
Ausrstung
Anschlussraum
EMT
Sprinklerraum epoxy flooring epoxy flooring epoxy flooring epoxy flooring epoxy flooring epoxy flooring epoxy flooring new paint new paint new paint paint walls new paint new paint new paint susp. ceiling sandwich panels sandwich panels paint sandwich panels sandwich panels paint
11.48 m²
5.97 m²
207.84 m²
36.00 m²
13.52 m²
9.19 m²
33.38 m²
317.39 m²
15.83 m
10.15 m
64.45 m
24.60 m
14.84 m
12.15 m
27.26 m
169.28 m
PHASE 2: Add Vehicle Bay / Anbau Fahrzeughalle
FLOOR PLAN, Sc. 1:100
GRUNDRISS, M 1:100
INDEX DATE NAME
DESIGN STATUS:
UNITED STATES AIR FORCES IN EUROPE
435 CTS
AN DER SCHWARZBACH
66877 RAMSTEIN
GERMANY
TEL: 06371-47-7290
DRAWINGS ARE 435 CTS PROPERTY
UNAUTHORIZED COPIES ARE PROHIBITED
PROJECT
DRAWING TITLE
DRAWING BY
ENGINEER
PROJECT MANAGER
ENGINEERING FLIGHT CHIEF
WORK ORDER NO.
FILE NO.
DATE
SCALE
DWG. NO.
SHEET FORMAT
DESCRIPTION
DEPARTMENT OF THE AIR FORCE
435 CTS
OPC 02 BOX 103
APO AE 09094-9002
DSN: 314-480-7290
30%
ADD / ALTER BLDG. 1058 FOR
SATELLITE FIRE STATION 8
VOGELWEH FAMILY HOUSING
FLOOR PLAN
GRUNDRISS
S. MIRKOVA
R. SCHRADE
T. LENHARD
B4229
YANB 21-1566
06 NOV 2025
1:100
A2
DIN A1
Modifications / Umbauplanung Existing / Bestand Demolition / Abbruch New design / Neu
N
| Sheets and Views |
| A2-Floor Plan |
| 2025-11-13T11:18:49+0100 | |
| SCHRADE.RALF.1275513969 |
File details come from the government source that posted it. Updated .