About this file

This document includes basis of design drawings and specifications for a GE Healthcare X5700 medical imaging system. The drawings indicate placement of equipment components and connections. The specifications require any deviations from the drawings to be approved in writing by the local GE Healthcare project manager. The site must provide space for equipment, analysis, restrooms, power, and image containment. A radiation physicist consultation is recommended to specify containment. Also included is a federal contract opportunity notice from the Army Corps of Engineers seeking quotes for the ACC Replacement 13 Area Replacement Initial Outfitting Project. Quotes are due by February 11, 2021. The requirement is set aside for Service-Disabled Veteran-Owned Small Businesses. The Statement of Work, Appendices, and Technical Packages are attached.

View the file

Other files for this federal contract opportunity

Other files attached to ACC Replacement 13 Area Replacement Initial Outfitting Project, newest first.
File Type Posted
Revised PRICE SCHEDULE W9127S21Q6000.xlsx XLSX spreadsheet
Amendment 0001 - Additional Cutsheets.pdf PDF
Amendment 0001 - Telecommunications Infrastructure.pdf PDF
Amednment 0001 - Approved VTC list.pdf PDF
Amendment 0001 - ProjNet Inquiries.pdf PDF
W9127S21Q6000 Amendment 0001.pdf PDF
P021 AREA 13 MEDICAL CLINIC - Final CID Submittal Redacted.pdf PDF
PN 14021 CP ACC Replacement_13 Area_IOT Requirement Doc-FY21_14JAN2021_V6.docx DOCX document
7.2 WEEKLY RISK REPORT_PN14021_CP_13Area_ACC_21SEP20.xlsx XLSX spreadsheet
6.6.1 PN14021 AREA 13 MEDICAL CLINIC - PRC.pdf PDF
13 AreaLtr 1092-09 Construction Baseline Schedule_20200511.pdf PDF
Staging and Area Map.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC - Final Medical Equipment.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc1of3.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc3of3.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc2of3.pdf PDF
6.7 PRICE SCHEDULE_PN14021_CP_13Area_ACC DEC2020.xlsx XLSX spreadsheet
Attachment 1 - SOW for FY21 ACC Replacement.pdf PDF
DMLSS CRLL 13 Area.xlsx XLSX spreadsheet
6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs2of2.pdf PDF
P021 AREA 13 MEDICAL CLINIC - Final SID Submittal Redacted.pdf PDF
X5700 Full Cut Sheet.pdf PDF
Attachment (014) - Program for Design 13 Area Marine Centered Medical Ho....pdf PDF
W9127S21Q6000 Combined Synopsis Solicitation.docx DOCX document
6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs1of2.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes.

Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors.

New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms.

Provide for refuse removal and disposal (e.g. crates, cartons, packing)

2. Power for drills and other test equipment, 3. Capability for image

Contact a radiation physicist or consultant to specify radiation containment requirements.

RAD Site Planning

GE Healthcare Customer Site Readiness

Requirements Drawing Index

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at:

www.gehealthcare.com/siteplanning

These sheets are a document set and should not be separated.

Electrical information and references are contained on all sheets.

GE Equipment Delivery Requirements

The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipment delivery to the IS site. Equipment will not be delivered if these requirements are not satisfied.

* REQUIRED REFERENCE *

Pre Installation Manual

These drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.

X5700

² ²

File details come from the government source that posted it. Updated .