Amendment 0001 - ProjNet Inquiries.pdf
PDF 350 KB Posted
- Attached to
- ACC Replacement 13 Area Replacement Initial Outfitting Project Federal contract opportunity
- Solicitation number
- W9127S21Q6000
About this file
This document summarizes a solicitation for initial outfitting services. The solicitation seeks quotes for the ACC Replacement 13 Area Replacement Initial Outfitting Project at Camp Pendleton to replace an existing medical clinic. Quotes are due by February 11, 2021 with contract award anticipated around March 1, 2021. The requirement is set aside for Service-Disabled Veteran-Owned Small Businesses. The Scope of Work and technical specifications are provided in attachments. The work includes outfitting medical exam rooms, administrative spaces, waiting areas, and associated infrastructure.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2/9/2021 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 1/14
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contracting Officers Report All Inquiries
Project: FY21 ACC Replacement (13 Area), Camp Pendleton Review: W9127S21Q6000 (00001) (sorted by CommentID ) Displaying 86 inquiries.
Id Discipline Sheet Detail Spec 8968391 General beta.SAM.gov Special Notice Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
According to the Special Notice on beta.SAM.gov ProjNet will close before the "final" solicitation is released (Estimated solicitation date: January 15, 2021). Will you keep ProjNet open or re-open the system to allow for questions once the actual solicitation is released?
By: Molly Chasteen; Concourse Federal Group; (9134333375). On: Dec 14 2020. Forward request by email.
1-0 Evaluation Concurred. ProjNet will re-open when the solicitation is released. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Dec 16 2020 1-1 Government Response. ProjNet will re-open when the solicitation is released. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 28 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8976911 General Price Schedule Spreadsheet Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please note that most of the quantities in the price schedule spreadsheet are not matching the quantities in the room x room reports and the drawings. It appears somebody did a search of the room reports for the JSNs, but did not account for the multiple quantities in each room. Please provide an updated price schedule spreadsheet with corrected quantities.
By: Molly Chasteen; Concourse Federal Group; (9134333375). On: Dec 21 2020. Forward request by email.
1-0 Evaluation Concurred. Price Schedule will be updated to reflect the correct quantities. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Dec 29
1-1 Government Response. Price Schedule will be updated to reflect the correct quantities. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 30 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8979958 Communications Section 2.6.5 RCDD - Communications System Engineer Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
RCDD – The requirement from Section 2.6.5 for a COMMUNICATION SYSTEMS ENGINEER is "The Communications System Engineer (CSE) will be a Registered Communications Distribution Designer (RCDD). They will have a Bachelor or Master of Science degree in Electronics Engineering or in Electrical Engineering, and a minimum of five (5) years of communications design and implementation experience." Can additional experience be substituted for the RCDD certification?
By: Jessica Martin; Workplace Solutions - Jacksonville, FL; (9049978878). On: Dec 23 2020. Forward request by email.
1-0 Evaluation Concurred. RCDD certification is not required. The Communications System Engineer (CSE) shall have a Bachelor or Master of Science degree in Electronics
Engineering or in Electrical Engineering, and a minimum of five (5) years of communications design and implementation experience. Or, they may have fifteen (15) years of experience in the design and implementation of communications systems. They also shall have a minimum of three (3) years of experience in the design, coordination and integration of military medical communications systems outlined in this SOW.
The CSE shall demonstrate a solid understanding of healthcare operations and related communication and low voltage security equipment and systems (LVS. CSE shall have and demonstrate experience in: 1) reviewing and interpreting LVS design layouts and documents (including Project Room Contents lists, infrastructure interface, and specifications); 2) budgetary and procurement documentation; 3) have experience in executing the procurement, delivery, installation, testing, certification, and training related to LVS; and 4) executing DOD Cybersecurity mandates. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Dec 29 2020
1-1 Government Response. See solicitation for details.
RCDD certification is not required. The Communications System Engineer (CSE) shall have a Bachelor or Master of Science degree in Electronics Engineering or in Electrical Engineering, and a minimum of five (5) years of communications design and implementation experience. Or, they may have fifteen (15) years of experience in the design and implementation of communications systems. They also shall have a minimum of three (3) years of experience in the design, coordination and integration of military medical communications systems outlined in this SOW.
The CSE shall demonstrate a solid understanding of healthcare operations and related communication and low voltage security equipment and systems (LVS. CSE shall have and demonstrate experience in: 1) reviewing and interpreting LVS design layouts and documents (including Project Room Contents lists, infrastructure interface, and specifications); 2) budgetary and procurement documentation; 3) have experience in executing the procurement, delivery, installation, testing, certification, and training related to LVS; and 4) executing DOD Cybersecurity mandates. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 30 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8979959 General Seismic Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Seismic - If seismic bracing is required for this project, what seismic bracing standards are to be followed, the standards from ASCE 7-10 or the standards from California's Office of Statewide Health Planning and Development?
By: Jessica Martin; Workplace Solutions - Jacksonville, FL; (9049978878). On: Dec 23 2020. Forward request by email.
1-0 Evaluation Concurred. Per Project Officer: Please refer to UFC, specifically UFC 4-510-01 Ch.8, SB 1953 and
California Code, and defer to the more strict of the codes seismic codes for IO. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Dec 24 2020
1-1 Government Response. Per Project Officer: Please refer to UFC, specifically UFC 4-510-01 Ch.8, SB 1953 and California Code, and defer to the more strict of the codes seismic codes for Initial Outfitting. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 28 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8979960 General Project Room Contents Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
PRC – Can a copy of the Project Room Contents Report be provide with the solicitation?
By: Jessica Martin; Workplace Solutions - Jacksonville, FL; (9049978878). On: Dec 23 2020. Forward request by email.
1-0 Evaluation Concurred. A PCR will be provided with the solicitation. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Dec 23 2020 1-1 Government Response. A PCR will be provided with the solicitation. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 28 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8979961 General DRMO Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=SpecText mailto:mchasteen@concoursefederal.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8968391 mailto:elisha.c.kehner@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mchasteen@concoursefederal.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8976911 mailto:elisha.c.kehner@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:jmartin@workplace.us https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8979958 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:jmartin@workplace.us https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8979959 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:jmartin@workplace.us https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8979960 mailto:elisha.c.kehner@usace.army.mil mailto:timothy.a.pighee@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 2/14
DRMO – While the IO contractor will not be able to accurately identify the amount of equipment to be re-used vs the amount going to DLA-Disposition until an inventory has been completed after contact award, can a DMLSS list for the departments being transitioned and a current layout of the space that is being transitioned be provided as part of the solicitation? This will allow IO contractors to estimate the amount of effort required to relocated existing equipment and the amount of effort required to prepare and transport Furniture and equipment to DLA Disposition.
By: Jessica Martin; Workplace Solutions - Jacksonville, FL; (9049978878). On: Dec 23 2020. Forward request by email.
1-0 Evaluation Concurred. Per Project Officer: This has been requested, not sure if it will be available by 30 Dec. By: Dawn Rose; Defense Health Agency (DHA) - Falls
Church, VA; (2103328721) On: Dec 24 2020 1-1 Government Response. This is information is currently not available. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 28 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8979962 General Section 2.2 Paragraph 4 Existing Inventory Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Existing Inventory – Based on Section 2.2 paragraph 4 "Existing Inventory (reuse) and the PRC. The attached PRC does not list existing inventory nor reuse items. See items 1 through 3 above and incorporate reuse into the PRC accordingly." Will existing items that are identified for re-use during the inventory be treated as a deductive contract modification or should we try to estimate the amount of FFE from the PRC that will be filled by existing items when providing our proposal?
By: Jessica Martin; Workplace Solutions - Jacksonville, FL; (9049978878). On: Dec 23 2020. Forward request by email.
1-0 Evaluation Concurred. We cannot advise you on how to propose/bid the contract. We do expect that reuse items will be incorporated during the IO&T KTR's design verification period, creating cost savings on the IO Commodities side. It is understood that these changes may affect cost for moving said reuse items and this will be addressed by DHA and the Agent if needed. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Dec 23 2020
1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981789 General Schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
RFP states a BOD of 19 Oct. 2021, with the solicitation anticipated to be released 15 Jan. 2021, assuming a 31 Jan. 2021 response due date and 30 days for ACoE to issue the award there will not be enough time to complete the design process, IOC award and procurement process to meet the desired BOD date based on the required activity durations in the RFP.
Please review the requirements and adjust for the final RFP.
-15 Jan. 2021: Anticipated RFP release -31 Jan. 2021: Assumed RFP response deadline -1 Mar. 2021: Contract Award (~30 days) =232 days to BOD: 19 Oct. 2021
Kick Off Meeting = 14 days User Meeting = 2 days Submittal 1 Delivery = 45 days after user meeting Gov. Review Period = 21 days User Meeting = 2 days Submittal 2 Delivery = 30 days after user meeting Gov. Review Period = 21 days Submittal 3 (CF) Delivery = 10 days Gov. Review Period = 15 days IOC Award following Corrected Final = 30 days 8 week commodity lead time = 56 days 246 days (14 days past BOD)
By: Molly Chasteen; Concourse Federal Group; (9134333375). On: Dec 28 2020. Forward request by email.
1-0 Evaluation Concurred. Final RFP will be adjusted with new schedule and requirements. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Dec 29
1-1 Government Response. The solicitation will have a new schedule. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Dec 30 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983643 IO Low Voltage/Communications/Resource Protection 2.3.4.4
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes ESS ACS to be provided and installed as complete turnkey system by construction contractor. Confirm no scope for IOT contractor.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983644 IO Low Voltage/Communications/Resource Protection 2.3.4.4
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes "provide as indicated". Confirm Duress to be provided and installed by IOT contractor as complete, turnkey system.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983646 IO Low Voltage/Communications/Resource Protection 2.3.4.4 ESS BHSA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes "provide as indicated". Confirm BHSA to be provided and installed by IOT contractor as complete, turnkey system.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 mailto:jmartin@workplace.us https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8979961 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:jmartin@workplace.us https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8979962 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:mchasteen@concoursefederal.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8981789 mailto:elisha.c.kehner@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983643 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983644 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983646 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 3/14
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983649 IO Low Voltage/Communications/Resource Protection 2.3.4.4 ESS IDS
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes "provide as indicated". Confirm IDS to be provided and installed by IOT contractor as complete, turnkey system.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983651 IO Low Voltage/Communications/Resource Protection 2.3.4.4 ESS VSS
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes "provide as indicated". Confirm VSS to be provided and installed by IOT contractor as complete, turnkey system.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983653 IO Low Voltage/Communications/Resource Protection 2.3.4.4 Telephone
Instruments
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes coordinate purchase/relocation of POTS telephone handsets. Confirm scope only limited to analog POTS handsets and no VoIP handsets are part of purchase/relocation scope of work.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983654 IO Low Voltage/Communications/Resource Protection 2.3.4.4 Audio-Video
Systems
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation notes "Contractor to identify and purchase". Confirm AV to be provided AND installed by IOT contractor as complete, turnkey system or if IOT contractor will only purchase for construction contractor installation.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983655 IO Low Voltage/Communications/Resource Protection 2.3.4.4
Server Room
Racks and Wire Mgmt
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm IOT contractor to provide and install data racks for LVS indicated in IOT contract and that construction contractor and structured cabling system vendor will not provide and install ALL racks and wire. If IOT contractor responsible for providing, please provide contact for SCS vendor performing data cabling scope of work for coordination of material/type.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8983660 IO Medical Equipment, non OP Cutsheet: JSN M1830 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Verify the model of JSN M1830: PM43, PM43C, or PM23C.
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Dec 30 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
8984473 IO
Transition/Phasing/Security/Warehousing/DRMO 3.2.6
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the IO contractor responsible for providing a warehouse for this project?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Dec 31 2020. Forward request by email.
1-0 Evaluation Concurred. Per section 3.2.6, The Contractor is responsible for providing the warehouse if one is needed. The facility will not supply one for the Contractor's use. Due to the nature of this project, a warehouse is not expected to be needed. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On:
Jan 04 2021
1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 Current Request Status: Request Closed mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983649 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983651 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983653 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983654 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983655 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8983660 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8984473 mailto:dawn.m.rose2.ctr@mail.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 4/14
Information for this report is procurement sensitive.
8984479 IO
Transition/Phasing/Security/Warehousing/DRMO 3.2.6
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm if a warehouse is required. Section 3.2.6 states "The Contractor is responsible for providing the warehouse if one is needed". A determination of need and anticipated length of need will need to be made since it impacts pricing. If a warehouse is needed, does the government expect this option to be priced with solicitation requirements?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Dec 31 2020. Forward request by email.
1-0 Evaluation Concurred. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021 1-1 Government Response. See solicitation By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 07 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9031559 IO Medical Equipment, non OP 6.8.1+PN14021+AREA+13+MEDICAL+CLINIC+- +Final+Medical+Equipment
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In reference to JSN A1145 (Pages 205-210 of the spec), is there a preference of either 12"D shelving or 15"D shelving? There are two options shown for different configurations. If option one is utilized, is the additional shelving, noted on the spec drawing (Page 205) with "Can we put shelving here?" to be included in design? Please provide a final spec so that we know what to price.
By: Molly Chasteen; Concourse Federal Group; (9134333375). On: Jan 27 2021. Forward request by email.
1-0 Evaluation Concurred. Maximize shelfing. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Jan 28 2021 1-1 Government Response. please maximize shelving. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 29 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9031701 IO CID: Furniture/Furnishings CID Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The final CID package was not included with the solicitation documents. Will that be provided?
By: Molly Chasteen; Concourse Federal Group; (9134333375). On: Jan 27 2021. Forward request by email.
1-0 Evaluation Concurred. please see the solicitation for the final CID. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 29 2021 1-1 Government Response. please see the solicitation for the final CID By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 29 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9033541 IO Medical Equipment, non OP 6.8.1+PN14021+AREA+13+MEDICAL+CLINIC+- +Final+Medical+Equipment
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
JSN A5200, Toilet Tissue Dispenser, is not typically a CAT C item, but rather CAT A - contractor furnished and installed. Please verify.
By: Molly Chasteen; Concourse Federal Group; (9134333375). On: Jan 28 2021. Forward request by email.
1-0 Evaluation Concurred. JSN A5200, Toilet Tissue Dispenser, will be changed from Cat C to Cat R. The IO&T KTR will need to coordinate timelines with the Operations
Management Department, who will provide and install the dispensers. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Jan 28 2021 1-1 Government Response. JSN A5200, Toilet Tissue Dispenser, will be changed from Cat C to Cat R. The IO&T KTR will need to coordinate timelines with the Operations
Management Department, who will provide and install the dispensers.
See revised bid schedule for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Jan 29 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9037824 Equipment 6.8.1 PN14021 AREA 13 MEDICAL CLINIC - Final Medical Equipment
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide data sheet for JSN U9000 – Wall, Waiting Room, Modular
By: Cassie Womack; Partners Healthcare Group; (6156202962). On: Jan 29 2021. Forward request by email.
1-0 Evaluation Concurred. No data sheet available. Specifications and information for U9000 can be found in the Final CID Submittal, page 43 of 818. By: Dawn
Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 01 2021 1-1 Government Response. No data sheet available. Specifications and information for U9000 can be found in the Final CID Submittal, page 43 of 818. By: Timothy
Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9037861 IO Project Management Statement of Work:1.3.3 SCHEDULE
CONSTRAINTS
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
It was indicated in previous questions that the schedule would be updated with the release of the final solicitation. Can you please provide an updated schedule?
By: Cassie Womack; Partners Healthcare Group; (6156202962). On: Jan 29 2021. Forward request by email.
1-0 Evaluation Concurred. Schedule was updated within Section 1.3.1. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Jan 31 2021 1-1 Government Response. Please see the solicitation for the schedule. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9037970 IO Medical Equipment, non OP 6.8.1 PN14021 AREA 13 MEDICAL CLINIC - Final Medical Equipment
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specific models and other product choices were not designated on the specification sheets for the following items. Can you please provide more specific information on preferences?
M1803 Workstation, Computer, Wall Mounted, Adjustable M1830 Printer, Label, Pharmacy M8174 – Ultrasound/Neuromuscular Stimulation Combo Unit M8133 – Ergometer, Upperbody mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8984479 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mchasteen@concoursefederal.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9031559 mailto:elisha.c.kehner@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mchasteen@concoursefederal.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9031701 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mchasteen@concoursefederal.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9033541 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:cwomack@phgworks.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9037824 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:cwomack@phgworks.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9037861 mailto:elisha.c.kehner@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 5/14
M8315 – Table, Traction, Physical Therapy, two different "packages" (contemporary & complete) listed R6060 – Refrigerator, Biological, SS, 2 Door, 40 Cu Ft R7050 - Refrigerator, 25 Cubic Feet, 84x27x37
By: Cassie Womack; Partners Healthcare Group; (6156202962). On: Jan 29 2021. Forward request by email.
1-0 Evaluation Concurred. Bid the basic system for each of these JSNs. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 01 2021 1-1 Government Response. basic, standard systems are sufficient By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9039183 General N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the Government issue a Letter of Authorization to receive GSA contract pricing to the Awardee?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Jan 31 2021. Forward request by email.
1-0 Evaluation Concurred. A decision will be made after award. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 1-1 Government Response. A decision will be made after award. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9039184 General N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is standard labor acceptable or is prevailing wage required?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Jan 31 2021. Forward request by email.
1-0 Evaluation Concurred. standard labor rates By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 1-1 Government Response. standard labor rates By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9039185 IO
Transition/Phasing/Security/Warehousing/DRMO N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the installation to be completed in a single phase?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Jan 31 2021. Forward request by email.
1-0 Evaluation Concurred. Per section 1.3.1 of the SOW, KTR will have a 32 day installation and transition period for a 19 November 2021 Open For Business date. How many phases it takes to complete the installation and transition is up to the KTR to propose for Gov't review/acceptance. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 01 2021
1-1 Government Response. See the solicitation for transition period, BOD, and OFB. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9039187 IO CID: Furniture/Furnishings N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We would like to request a furniture CAD plan for pricing (in .dwg or .rvt file form)?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Jan 31 2021. Forward request by email.
1-0 Evaluation Concurred. CAD drawings will be provided after award. By: Elisha Kehner; SWL - Initial Outfitting Branch; ((501)340-1070) On: Feb 01 2021 1-1 Government Response. CAD drawings will be provided after award. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9039190 General Solicitation, VOL II, Tab D Pg 7 of 48 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the Offeror required to submit the actual Reps and Certs, or can the Offeror just ensure that their SAM profile is up-to-date?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Jan 31 2021. Forward request by email.
1-0 Evaluation Concurred. Please see the solicitation. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 1-1 Government Response. Please see the solicitation. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9039191 General Solicitation, VOL III, Tab C pg 8 of 48 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per the Solicitation, The Offeror is to include Client Authorization Letters in VOL III, Tab C- Past Performance. The solicitation requires three (3) PPQs; each PPQ is 4 pages for 12 pages total. In order to include the Client Authorization letters, Tab C's maximum page count of 12 must be increased. Will the Government increase the page count of Tab C- Past Performance?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Jan 31 2021. Forward request by email.
1-0 Evaluation Concurred. The page count will not be increased. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 1-1 Government Response. The page count will not be increased. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040233 IO CID: Furniture/Furnishings DRAFT+P021+AREA+13+MEDICAL+CLINIC+- +Final+CID+Submittal pg 229 of
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the PUCK that is referred to in the paragraphs about "Technology Workstation Components for information sharing" on the Furniture Illustration Order Forms? Is this a worksurface-mounted power/data unit that occupants can plug directly into?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. As stated in that paragraph, the PUCK is the user interface component of the system. By: Dawn Rose; Defense Health Agency (DHA) - Falls mailto:cwomack@phgworks.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9037970 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9039183 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9039184 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9039185 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9039187 mailto:elisha.c.kehner@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9039190 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9039191 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040233 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 6/14
Church, VA; (2103328721) On: Feb 01 2021 1-1 Government Response. The PUCK is the user interface component of the system.
Please see the solicitation documents for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9040234 IO CID: Furniture/Furnishings DRAFT+P021+AREA+13+MEDICAL+CLINIC+- +Final+CID+Submittal pg 224 of
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For JSN E0084R Workstation, the description asks for a "Double sided tackboard". This is not a standard item and this workstation is against a wall in all 6 locations. Is this still a requirement?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. Please see solicitation for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 04 2021 1-1 Government Response. Please see solicitation for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 04 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040273 IO CID: Furniture/Furnishings DRAFT+P021+AREA+13+MEDICAL+CLINIC+- +Final+CID+Submittal pgs. 405-
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can a full description/definition of the Framed Art "Security Hardware" be provided?
By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. Security hardware should be three point, at minimum; however, it is up to the KTR to propose a security hardware system of their choosing. The
Gov't will review for approval. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 01 2021 1-1 Government Response. Security hardware should be three point, at minimum By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040333 Project Management Key Personnel Transition Planner
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the Transition Planner considered to be a part of the Contractor Key Personnel team?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. See the SOW for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 1-1 Government Response. Please see the SOW for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040341 IO Project Management Validation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the IO contractor have the ability to directly coordinate with the DOR and/or GC in regards to MEP validation and extended installation coordination?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. The IO KTR will coordinate this through the Project Officer. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On:
Feb 01 2021 1-1 Government Response. The IO KTR will coordinate this through the Project Officer. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040351 IO Project Management Submittal Validation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the IO contractor have be integrated into the submittal review process relative to the initial outfitting commodities we are responsible for installing?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. please re-state question By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021 1-1 Government Response. please re-state the question By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 01 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040357 IO SID: Signage/Wayfinding/Finishes Changes Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are the finishes presented in the SID final and will not be change?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. The government reserves the right to make any changes after award by means of a modification. By: Timothy Pighee; SWL Contracting Division;
(5013401270) On: Feb 01 2021 1-1 Government Response. The government reserves the right to make any changes after award by means of a modification. By: Timothy Pighee; SWL Contracting Division;
(5013401270) On: Feb 01 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9040397 IO Low Voltage/Communications/Resource Protection 2.3.4.4 NWIC Compliance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
2.3.4.4, A-2 states "ESS: Duress (PP) Fixed duress alarm buttons will be provided as indicated in the Final Design drawings, as a component of IDS, and integrated with the VSS.
Requirements will be coordinated with the installation Physical Security Office and confirmed with the DHA Project Officer. Duress System is required in Pharmacy at drive up window, pharmacy counters and consulation room." i. Solicitation documents do not reference compliance with SPAWAR (now known as NWIC) for providing equipment listed on the USMC ESS Standard Equipment and Material List. i. Will the equipment provided and installed by the IO&T team be required to meet NWIC Compliance for listed equipment?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. Per Project Officer: NIWC approval not needed By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 03 mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040234 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040273 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040333 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040341 mailto:dawn.m.rose2.ctr@mail.mil mailto:timothy.a.pighee@usace.army.mil mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040351 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040357 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:TERI.DORSEY-PORTER@GOENERGISTICS.COM https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9040397 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 7/14
1-1 Government Response. NIWC approval not needed By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 03 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040399 IO Low Voltage/Communications/Resource Protection 2.3.4.4 NWIC Compliance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the installation required a seperate desing submittal phase specifically for Intrusion Detection & Duress, to be submitted by the IO&T team following NWIC submittal guidelines to be approved by NWIC prior to installation?
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. Per Project Officer: NIWC approval not needed By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 03
1-1 Government Response. NIWC approval not needed By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb 03 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9040411 IO Low Voltage/Communications/Resource Protection 2.3.4.4
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
UFC calls for both wireless and hardwired duress at behavioral health reception for outpatient treatement facilities, however the SSA design is only indicating wireless duress for these locations. Please advise if hardwired duress will be required at reception and if so, please clarify which reception areas will be used for behaviroal health.
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. Per IM/IT Planner: Yes. At behavioral health reception desk. It should be hard wired. By: Dawn Rose; Defense Health Agency (DHA) - Falls
Church, VA; (2103328721) On: Feb 03 2021 1-1 Government Response. Hardwired duress will be required at the behavioral health reception desk. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Feb
03 2021 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9040413 IO Low Voltage/Communications/Resource Protection 2.3.4.4
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
It is common for the IO contractor to provide an annunciator at the quarterdeck or main reception areas for notification of triggered duress alarms in each respective area od the building. Please advise if duress alarm annunciation will be required at reception areas and if so, please clarify which reception areas will require an annunciator.
By: TERI DORSEY-PORTER; GO ENERGISTICS, LLC; (2143470590). On: Feb 01 2021. Forward request by email.
1-0 Evaluation Concurred. Per IM/IT Planner: If Pharmacy or Embedded Behavioral Health supporting Primary Care is included in the functional program then annunciation would be required at the reception desks associated with these locations. Pharmacy Duress Alarms may need further clarification via PM. By: Dawn Rose; Defense Health Agency (DHA) - Falls Church, VA; (2103328721) On: Feb 03 2021
2-0 Evaluation Concurred. All Pharmacy and Embedded Behavioral Health reception desks will require an…