About this file

This is a solicitation for initial outfitting services for the ACC Replacement 13 Area Replacement Project. The U.S. Army Corps of Engineers seeks quotes by February 11, 2021 for outfitting a medical clinic to replace an existing facility. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and has a NAICS code of 337127 with a size standard of 500 employees. The Statement of Work and technical specifications are provided as attachments to the solicitation document. Award is anticipated to be a fixed-price contract for the required outfitting and furnishing of the new medical clinic located at Camp Pendleton, California.

View the file

Other files for this federal contract opportunity

Other files attached to ACC Replacement 13 Area Replacement Initial Outfitting Project, newest first.
File Type Posted
Revised PRICE SCHEDULE W9127S21Q6000.xlsx XLSX spreadsheet
Amendment 0001 - Additional Cutsheets.pdf PDF
Amednment 0001 - Approved VTC list.pdf PDF
Amendment 0001 - ProjNet Inquiries.pdf PDF
W9127S21Q6000 Amendment 0001.pdf PDF
Amendment 0001 - Telecommunications Infrastructure.pdf PDF
P021 AREA 13 MEDICAL CLINIC - Final CID Submittal Redacted.pdf PDF
PN 14021 CP ACC Replacement_13 Area_IOT Requirement Doc-FY21_14JAN2021_V6.docx DOCX document
6.6.1 PN14021 AREA 13 MEDICAL CLINIC - PRC.pdf PDF
DMLSS CRLL 13 Area.xlsx XLSX spreadsheet
6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs2of2.pdf PDF
P021 AREA 13 MEDICAL CLINIC - Final SID Submittal Redacted.pdf PDF
X5700 Full Cut Sheet.pdf PDF
Attachment (014) - Program for Design 13 Area Marine Centered Medical Ho....pdf PDF
W9127S21Q6000 Combined Synopsis Solicitation.docx DOCX document
6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs1of2.pdf PDF
X5700 Basis of Design Drawings.pdf PDF
13 AreaLtr 1092-09 Construction Baseline Schedule_20200511.pdf PDF
Staging and Area Map.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC - Final Medical Equipment.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc1of3.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc3of3.pdf PDF
6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc2of3.pdf PDF
6.7 PRICE SCHEDULE_PN14021_CP_13Area_ACC DEC2020.xlsx XLSX spreadsheet
Attachment 1 - SOW for FY21 ACC Replacement.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEEKLY REPORT OVERVIEW (TAB1)

PROJECT INFORMATIONCOST SUMMARYSCHEDULE SUMMARY
FY2018SCOPECOSTPROPOSEDSCHEDULEDACTUAL
PRIMARY PROJ #PF BASE BIDPERIOD OF PERFORMANCE455 daysdays
PROJECT TITLEACC Replacement (13 Area)PF OPTIONSPROJECT AWARD19-Nov-200-Jan-00
PRIMARY BLDG #D-B SUB-TOTAL:$0POP END DATE
INSTALLATIONCAMP PENDLETONIO-S SUBCLINNTP
PRIMARY FAC TYPEACUTE CARE CLINICIO OPTIONIO AWARD
NEAREST CITYSAN DIEGO, CAIO SUB-TOTAL:$0ACCEPTED DESIGN0-Jan-000-Jan-000-Jan-00
DELIVERY METHODIO STAND ALONEOP-S SUBCLINCONSTRUCT COMPLETE0-Jan-000-Jan-000-Jan-00
CONTRACT #OP OPTIONIO COMPLETE0-Jan-000-Jan-000-Jan-00
TASK ORDER #OP SUBTOTAL:$0TRANSITION COMPLETE (OFB)0-Jan-00
AWARD DATEPROPOSAL TOTAL:$0PROJECT % COMPLETE%placed
PROJECT MANAGEMENTMODSCOSTRATEACTUAL PERCENT COMPLETE%placed
PRIME CONTRACTORPF MODSERROR:#DIV/0!SCOPE SUMMARY
A-E OF RECORDIO-S MODSERROR:#DIV/0!PROPOSED GSF46,483
IO CONTRACTORIO MODSERROR:#DIV/0!REVISED GSF-TOTAL
A-E 3OP-S SUBCLINERROR:#DIV/0!
CONTRACT AGENTUSACE-SWLOP MODSERROR:#DIV/0!
FIELD AGENTUSACE-SWFMOD TOTAL:$0ERROR:#DIV/0!
CUSTOMERNAVAL MEDICAL FORCES PACIFICCONTRACT TOTAL + MODS:$0
PROJECT BREAKDOWN
*BUILDING #1313CHANGE REQUESTS (CR)EST COST
PROJECT TYPEIO STAND ALONEIO STAND ALONEPF CR
BUILDING CLASSCLINICCLINICIO-S CR
FUNDING SOURCEO&MPROCUREMENTIO CR
*BOLD=Primary Facility #OP-S CR
OP CR
CR TOTALS:$0
POTENTIAL CHANGES (PC)EST COST
PF PC
IO PC
OP PC
PC TOTALS:$0

&"-,Bold"WEEKLY REPORT (TAB 1-OVERVIEW) PROJECT REPORT DATE: &KFF0000XXXX

&P

WEEKLY REPORT-COSTS (TAB2)

AWARD AMOUNTCLIN #AWARD DATEPERF PERIODNSFGSFPF ($)IO-S ($)IO ($)PROC-S($)PROC ($)DESCRIPTION (DB/IO/OP)FFE JSN SUMMARY (REFER TO INSTRUCTIONS IN 01 10 11 ADMINISTRATIVE, CHANGE MANAGEMENT PROCESS)PRCL REPORT DATE:REFER TO INSTRUCTIONS IN 01 10 11 ADMINISTRATIVE, CHANGE MANAGEMENT PROCESS
BASE BID000119 NOV 2045546,483$0$0$0$0$0IO: STAND ALONEJSNJSN NOMENCLATUREA. CONTRACTOR'S PROPOSAL PRICEB. SUBMITTAL 1 UPDATESC. SUBMITTAL 2 UPDATESD. ACCEPTED DESIGN UPDATES
SUBCLIN0002$0$0$0$0$0IO-TRAW COSTEXTEND COSTTAXESGCCOST ($) PER EACH JSNQTY REQ'D BY SOLICITATIONTOTAL ($) COSTS1 QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTCommentsS2 QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTCommentsCF QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTComments
ADD/OPT 10003$0$0$0$0$0IO-C$0.00$0.00$0.00$0.00$0.00
ADD/OPT 20004$0$0$0$0$0PROC: ADD EQUIP TYPE
ADD/OPT 30005$0$0$0$0$0
ADD/OPT 40006$0$0$0$0$0
TOTALS:$0$0$0$0$0
IO RATE (%)N/AN/AN/AN/A
MODS#AWARD DATEEST ADJ POPADJ NSFADJ GSFD-B ($)IO-T ($)IO-C ($)OP ($)DESCRIPTION (DB/IO/OP)
MOD 100010 JAN 0000000$0$0$0$0$0
MOD 200020 JAN 00$0$0$0$0$0
MOD 300030 JAN 00$0$0$0$0$0
MOD TOTAL:$0$0$0$0$0
MOD RATE (%)N/AN/AN/AN/A
PENDING CHANGE REQUESTS#RFP RECV’D DATEEST ADJ POPEST ADJ NSFEST ADJ GSFD-B ($)IO-T ($)IO-C ($)OP ($)DESCRIPTION (DB/IO/OP)
CR 1000115 NOV 1315$0$0$0$0$0
CR 200025 JAN 13$0$0$0$0$0
CR TOTAL:$0$0$0$0$0
EXPOSURE RATE (%)N/AN/AN/AN/A
POTENTIAL CHANGESRISK #ID DATEEST ADJ POPEST ADJ NSFEST ADJ GSFD-B ($)IO-T ($)IO-C ($)OP ($)DESCRIPTION (DB/IO/OP)
PC 1000115 NOV 1315$0$0$0$0$0
PC 200025 JAN 13$0$0$0$0$0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
PC TOTAL:$0$0$0$0$0Difference between DS1 Review & Original Pricing$0.00Difference between DS2 Review & Original Pricing$0.00Difference between CF Review & Original Pricing$0.00
EXPOSURE RATE (%)N/AN/AN/AN/A
CURRENT AWARDED TOTAL ($) (include base and awarded options and modifications
PENDING AWARDED TOTAL ($) (unawarded CLIN's and Modifications)
CURRENT & PENDING TOTAL$0$0$0$0$0

&"-,Bold"WEEKLY REPORT (TAB 2-COST) PROJECT REPORT DATE: &KFF0000XXXX

WEEKLY REPORT-SCHEDULE (TAB3)

Activity#Proposed Schedule (preaward)Master Schedule (post award submission)Actual (Revised)
Contract Award1
Notice-to-Proceed2
Project Kick-Off Meeting3
Pre-Charrette (Scope Validation) Meeting4
Site Investigation Meetings/Surveys5
Existing Inventory (RPIE/PP) Meeting/Surveys6
Charrette7
Submittal 18
Submittal 1: Resolution Conference9
Progress Update: Presentation10
Progress Update: Report11
Submittal 212
Submittal 2: Resolution Conference13
Award IO Contract Options14
Award OP Contract Actions15
Construction Kick-Off (Demo & TPF Const.)16
Construction Kick-off (Main Project)17
Commissioning Kick-Off (Construction Phase)18
Cx: BAS/DDC Control Coordination Meeting19
Phase 1: (Identify work areas: i.e. TOPA, Dental Clinic, Parking Lot, etc.)
Phase 1 - Precon20
Phase 1 - Demo Start21
Phase 1 - Construction End22
Phase 1 - Commissioning Start23
Phase 1 - Punchout Inspection24
Phase 1 - Prefinal Inspection (Facility)25
Phase 1 - Final Inspection (Facility)26
Phase 1 - Construction Complete27
Phase 1 - Transition Planning Meetings Begin28
Phase 1 - Final Transition Plan Documents Due29
Phase 1 - Prefinal Inspection (RPIE/PP)30
Phase 1 - Department Move Dates (Start/End)31
Phase 1 - Final Cleaning32
Phase 1 - Final Acceptance (RPIE/PP)33
Phase 1 - Open for Business34
Phase 1 - Record Docs & Closeout35
Phase 2: (Identify work areas: i.e. TOPA, Dental Clinic, Parking Lot, etc.)
Phase 2 - [same as above]36
Phase X - (to be continued as above)37
Total Project - Final Commissioning38
Total Project - Final Inspection/Warranty39
Total Project - Final Acceptance40

PN 14021 CAMP PENDLETON 13 AREA

&"-,Bold"WEEKLY REPORT (TAB 3-SCHEDULE) PROJECT REPORT DATE: &KFF0000XXXXX

WEEKLY REPORT-SCOPE(TAB4)

SCOPE (update following the submission of EACH Submittal)
BLDG #DEPT/ SYSTEMCLASSIFICATIONTYPELEVEL OF RENOGSFDESIGN $CONSTRUCTION $IO $OP $COST/SF
PROPOSED

Allison Keck: DROP DOWN MENU: hospital, clinic, warehouse, vet, lab, morgue, garage, pharmacy

REVISED
Allison Keck: DROP DOWN MENU: hospital, clinic, warehouse, vet, lab, morgue, garage, pharmacyPROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

D REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

CLINIC
LAB
WAREHOUSE

&"-,Bold"WEEKLY REPORT (TAB 4-SCOPE) PROJECT REPORT DATE:&KFF0000 XXXXX

TEMPLATE

WEEKLY REPORT-RISK (TAB5)

RISKS (Note:Chronicle each risk on a weekly basi. Formal time/cost notification must be accomplished via FAR Clause)
#Date EnteredRiskPlan to Minimize RiskCurrent StatusPlanned Resolution DateActual Date ResolvedEst Impact to Critical Path (Days)Est Impact to CostRisk Type (Owner/Contractor)"Level of Risk” (R/G/Y)
1R
2G
3Y
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Total$-

PN 14021 CAMP PENDLETON 13 AREA &"-,Bold"WEEKLY REPORT (TAB 5-RISK) WEEKLY REPORT DATE: &KFF0000XXXX&K01+000

WEEKLY REPORT-PDT DISTRO (TAB6)

NOTE: REQUIREMENTS/CELLS HIGHLIGHTED IN RED ARE NOT REQUIRED ON PROJECTS WITH A CCL LESS THAN $12M
CORE PROJECT DELIVERY TEAM & DISTRIBUTION LISTNOTE: all hard copy drawings are half-sized
PROJECT: TemplateCONTRACT #:SUBMITTALS (Submittal 1, Submittal 2, Corrected Final)
#AGENCYNAMEOFFICEROLE/ POSITIONADDRESSE-MAILPHONEInvites / Minutes / CorresSubmittal #1Submittal #2Corrected Final SubmittalSID/CID Boards/BindersProject, MTF, and Departmental BindersASI'sShop Dwgs
#ElectElectHard CopyElectHard CopyElectHard CopyElectHard CopyElectHard Copy (Binders)ElectHard CopyElectHard Copy
1USACEUSACE-SWLProject ManagerOffice:
Cell:111111111
2USACEUSACE-SWLACOOffice:
Cell:211111111
3USACEUSACE-SWLProject Engineer / Civil EngineerOffice:
Cell:311111111
4USACE (Local)USACE-SPKCOR/Project EngineerOffice:
Cell:411111111
5USACE (Local)USACE-SPKQuality Assurance (QA) Evaluatorsee aboveOffice:
Cell:51
6NAVMED PACIFICLT Katie FaschanNAVMED PACIFICProject Health Facilities Officer
(Primary)4170 Norman Scott Road, Ste. 5
San Diego, CA 92136-5521katie.r.faschan.mil@mail.milOffice: (619) 767-6615
Cell: *619) 851- 4870611111111111 -Project Binder each submittal and 1-of each Departmental Binder each submittal11
7NAVMED PACIFICLT Wes PoirierNMFPProject Health Facilities Officer
(Secondary)see abovewesley.j.poirier.mil@mail.milOffice:
Cell:711111111
813 AREA MTFMr. Charles ScudderNMRTC CPFacility Manager4170 Norman Scott Road, Ste. 5
San Diego, CA 92136-5521charles.v.scudder.civ@mail.milOffice:
Cell:811111111111-MTF Binder each submittal1111
9AE-3Sr Project Manager9122221111
10BASE CEProject Manager101111
11BASE CEFire Chief111111111
12BASE CEAsst. Chief of Fire Prevention12
EXTENDED PROJECT DELIVERY TEAM SUPPORT
13USACETJ LeeUSACE-SWLMedical Program ManagerTJ.Lee@usace.army.mil13
14USACEUSACE-SWLAlternate ACO14
15USACEUSACE-SWLContracting Officer15
16USACEUSACE-SWLContract Specialistsee above161
17USACE (LOCAL)USACE-SPKResident Engineer17
18DHAJoseph "Joe" KascakDHA-FE/CSMDHA Facility Plannerjoseph.p.kascak2.ctr@mail.mil202-506-0831181111111
19DHAChristina StaplesDHA-FE/CSMDHA Clinical Plannerchristine.a.staples.civ@mail.mil703-275-6094191111111
20DHADawn RoseDHA-FE/CSMDHA IO&T Plannerdawn.m.rose2.ctr@mail.mil210-332-8721201111111
21DHAThomas FreemanDHA-FE/CSMDHA Interior Designerthomas.a.freeman20.ctr@mail.mil703-275-609021111111111
22DHATBDDHA-FE/CSMDHA Equipment Planner22
23DHAKimberly CurleeDHA-FE/CSMDHA IM/IT Plannerkimberly.d.curlee.civ@mail.mil703-275-6108231111111
24DHADerrick YoungDHA-FE/CSMDHA IM/IT Plannerderrick.e.young4.ctr@mail.mil(703) 882-3869241111111
25DHADahren NewtonDHA-FE/CSMDHA Transition Plannerdahren.j.newton.ctr@mail.mil210-287-2824251111111
26DHADHA HITEngineering & Design TeamAttention To: Scott James

Engineering, Design, and Deployment Branch Infrastructure and Operations Division 2720 Howitzer Rd, Bldg. 2372 JBSA Fort Sam Houston, TX 78234-5087 dha.jbsa.health-it.list.io-edd-pie-ie-milcon@mail.mil Email Correspondence

Only2611111111
27DHADHA HITDeployment TeamAttention To: Kevin O'Hara/Stephanie Dean

Engineering, Design, and Deployment Branch Infrastructure and Operations Division 3515 S General McMullen, Suite 1023 JBSA Lackland, TX 78236-1025 dha.jbsa.j-6.list.hit-lan-wlan-depmgt@mail.mil Email Correspondence

Only2711111111
28NAVAL DECS28111111
2913 AREA MTFLogistics CCEmail Correspondence Only2911111111
3013 AREA MTFMDSS/CCEmail Correspondence Only3011111111
3113 AREA MTFDental Flight ChiefEmail Correspondence Only3111111111
3213 AREA MTFDental FlightEmail Correspondence Only32
3313 AREA MTFMedical IT ChiefEmail Correspondence Only33
3413 AREA MTFBioenvironmentalEmail Correspondence Only3411111111
35SFS/ATOAnti-TerrorismEmail Correspondence Only3511111111
36BASE COMMBase Comm Representative36
37BASE COMMBase Comm Representative37
38BASE CEEnvironmental Chief3811111111
39BASE CEChief Engineer39
40BASE CEDeputy BCE4011111111
41BASE CEEngineering PM41
42BASE CEO&M COR42
43BASE CECommunications43
GENERAL CONTRACTOR
44N/AProject ManagerO:
C:44
45N/ADBIO Program ManagerO:
C:45
46N/AConstruction Division ManagerO:
C:46
47N/AProject SchedulerO:
C:47
48N/AProject Coordinator
Assistant Project SchedulerO:
C:48
49N/AContract OfficerO:
C:49
50N/ASite SuperintendentO:
C:50
51N/AQA / QCO:
C:51
52N/ASafetyO:
C:52
53N/AContractor's Commissioning SpecialistO:
C:53
54N/AMechanical Operations DirectorO:
C:54
DESIGN TEAM
ARCHITECT & TEAM
55N/AArchitect of RecordO:
C:55
56N/AArchitect's Project ManagerO:
C:56
57N/AHealth Facility PlannerO:57
58N/ADesign QA /QCO:58
59N/ATeam LeadO:59
60N/ADesignerO:60
61N/ASID Interior DesignO:61
STRUCTURAL ENGINEERING
62N/AStructural EngineerO:62
CIVIL - SITE - LANDSCAPE ENGINEERING
63N/ACivil EngineerO:63
INITITAL OUTFITTING - I/O
64Team Lead
RPIE/PP Project ManagerO:
C:64
65Medical Equipment PlannerO:65
66CID Interior DesignerO:66
67Transition PlannerO:67
68Art PMO:68
69Wayfinding ConsultantO:69
MECHANICAL ENGINEERING
70Principle in Charge/ MechanicalO:
C:70
71Assoc. Project Manager / Team LeadO:
C:71
ELECTRICAL ENGINEERING
72Project Engineer - ElectricalO:
C:72
FIRE PROTECTION ENGINEERING
73Fire Protection EngineerO:
C:73
RCDD
74Information Transport Systems
Data. Voice, Security, Audio, Visual74
COMMISSIONING AGENT
75Team LeadO:75
76Commissioning AgentO:76

&"-,Bold"WEEKLY REPORT (TAB 6-PDT DISTRIBUTION LIST) PROJECT REPORT DATE:&KFF0000 XXXX

Version: 9 May 2017 PDT Members may be updated if required by any PDT member throughout the project. &P

RFI LOG (TAB7)

Project Name
RFI #Date SentResponse NeededLevel of Importance Low/Med/HighDate AnsweredDate ClosedSubjectInformation RequestedGovt. Response

SUBMITTAL REGISTER (TAB 8)

NOTES:
1This document is considered Preliminary and is included as part of the RFP. The Contractor is required to update this list with all submittals required in the Contract unless directed otherwise.
2Refer to DIV 01 GENERAL REQUIREMENTS, 01 10 12 ADMINISTRATIVE for submittal classification definitions
3Provide samples of material if sample was not provided during design development and included in design submittals
4Submittals referenced below under the Division/Section found in the contract, shall be located under the appropriate specification section (not the contract section) in the final submittal register.
5Comply with the Submittal Requirements outlined in the UFGS (Reference WBDG).
Legend:
DORDesigner of RecordAction Legend:
A-E33rd Party A-E; Government Technical Consultant/RepresentativeAApproved as submitted
USACEU.S. Army Corps of Engineers - Little Rock DistrictBApproved, except as noted on attached comment sheet. Resubmission NOT required.
QAEQuality Assurance EngineerCApproved, except as noted on attached comment sheet. Resubmission required.
POService Project OfficerEDisapproved (see attached comment sheet). Resubmission required.
MTFMedical Treatment FacilityFReceipt acknowledged (FIO submittals only)
DADesigner of Record ApprovedFxDisagree with contractor's certified compliance
CRConformance Review
GAGovernment Approved Submittal
DAICRDesigner of Record Approval and Conformance Review
DA/GADesigner of Record and Government Approval
FIOFor Information Only
N/RNot Required
DESIGN-BUILD SUBMITTAL REGISTERTITLE AND LOCATION: FY-- Facility Repair/Air Base name, USADATE: day/month/yearNOTES
Reference: ER 415-1-10 Contractor Submittal ProceduresCONTRACTOR: Restricted/Unrestricted Industry PartnerCONTRACT NO:XXXX
ACTIVITY #TRANSMITTAL #ITEM #DIVISION/ SECTIONDESCRIPTION OF SUBMITTALTYPE OF SUBMITTALCLASSIFICATION (per JCH)REVIEWERCONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONGOVERNMENT ACTIONDISTRIBUTION
OFFICE /NAMESUBMITAL NEEDED BYREVIEW NEEDED BYMATERIAL NEEDED BYCODEAGENT RECEIVED DATECODEAGENT RETURN DATEDORAGENT PMA-E3USACE-COR/QAEPROJECT OFFICERMTFBASE
See Legend
01 10 10STATEMENT OF WORK
Temporary Phasing Facilities SubmittalsDESIGNCR
01 10 11CRITERIA
List of Updated CriteriaCRITERIACR
01 10 12ADMINISTRATIVE
Agendas, Meeting Minutes & Written RecordsADMINISTRATIVECR
Weekly ReportSADMINISTRATIVECR
Request for Information (RFI)ADMINISTRATIVECR
Architectural Supplemental Information (ASI)ADMINISTRATIVEGA
Document AmendmentsADMINISTRATIVEGA
Submittal Register (all Project Phases)ADMINISTRATIVEGA
01 10 13DESIGN AFTER AWARD
PROJECT KICK-OFFDESIGNCR
SITE INVESTIGATION SURVEYDESIGNCR
EXISTING INVENTORY (RPIE/PP)DESIGNCR
PRECHARRETTE (VALIDATE SCOPE)DESIGNCR
Contractor Key-Personnel ResumesDESIGNCR
CHARRETTE (DESIGN DEVELOPMENT)DESIGNCR
Site Investigation ReportsDESIGNCR
Existing Inventory List (RPIE/PP)DESIGNCR
SpecificationsDESIGNCR
Drawings:DESIGNCR
Site PlanDESIGNCR
Floor PlansDESIGNCR
Roof PlanDESIGNCR
Exterior ElevationsDESIGNCR
Building SectionsDESIGNCR
Reflective Ceiling PlansDESIGNCR
Enlarged Floor PlansDESIGNCR
Room Typical PlansDESIGNCR
Door SchedulesDESIGNCR
Wall Partition Types & Rated AssembliesDESIGNCR
Structural DrawingsDESIGNCR
Mechanical DrawingsDESIGNCR
Plumbing DrawingsDESIGNCR
Electrical DrawingsDESIGNCR
Program For Design (Current/Updated)DESIGNCR
Project Room Contents (PRC Current/Updated)DESIGNCR
Transition Plan (Preliminary Info)DESIGNCR
Early Design & Construction Phase PackagesDESIGNCR
SUBMITTAL 1: DESIGNDESIGNCR
Program for DesignDESIGNCR
RPIE/PP and CES Inventory ListDESIGNCR
Existing Conditions and Baseline ReportsDESIGNCR
Civil-SiteDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
LandscapingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
ArchitecturalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Structural-SeismicDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Sustainability (Refer to UFC 4-510-01 and UFC 1-200-02)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Fire Protection and Life SafetyDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Furniture, Fixtures, EquipmentDESIGNCR
NarrativesDESIGNCR
Price Schedule-IO and OP SummaryDESIGNCR
Price Schedule-FFE JSN SummaryDESIGNCR
Project Room Contents (PRC Current/Updated)DESIGNCR
Communications and Electronic Systems ListDESIGNCR
Existing Inventory List (RPIE/PP)DESIGNCR
Manufacturer Product Specs/Cut SheetsDESIGNCR
MTF Supplied FFE-LVS ListDESIGNCR
DrawingsDESIGNCR
Binders (MTF and Departmental)DESIGNCR
Interstitial Building Systmes (IBS) - Refer to UFC 4-510-01DESIGNCR
MechancicalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
PlumbingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CutsheetsDESIGNCR
ElectricalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
CutsheetsDESIGNCR
Communications and Electronic SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
AccessibilityDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Electronic Security SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
CybersecurityDESIGNCR
NarrativesDESIGNCR
Facility Related Control Systems List (FRCS)DESIGNCR
Anti-Terrorism & Force Protection (ATFP) - Refer to UFC RequirementsDESIGNCR
NarrativesDESIGNCR
DESIGNCR
Transportation and LogisticsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Structural Interior Design (SID), Wayfinding, SignageDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
ColorboardsDESIGNCR
Comprehensive Interior Design (CID)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Cut SheetsDESIGNCR
Color BoardsDESIGNCR
Attic Stock and Spare Parts ListDESIGNCR
Material & Spare Parts ListDESIGNCR
DESIGNCR
Commissioning - Refer to 01 10 15 Spec SectionDESIGNCR
DESIGNCR
Food ServiceDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
TransitionDESIGNCR
Transition Plan -Narratives/PlansDESIGNCR
Department Activity ScheduleDESIGNCR
Master Move ScheduleDESIGNCR
RPIE/PP Training ScheduleDESIGNCR
RPIE/PP Testing & Certification ScheduleDESIGNCR
Public Relations PlanDESIGNCR
Department Move SpreadsheetDESIGNCR
Transition Lessons Learned SurveyDESIGNCR
Temporary Facilities - Refer to UFCs for additional submittal requirementsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Project ScheduleDESIGNCR
Utility Shutdown Schedule Matrix (Preliminary)DESIGNCR
Presentation SlidesDESIGNCR
World-Class ChecklistDESIGNCR
PROGRESS REPORT: PRESENTATIONDESIGNCR
Main Presentation & Decision BriefDESIGNCR
Department PresentationsDESIGNCR
Mock-Ups: InteriorDESIGNCR
Mock-Ups: ExteriorDESIGNCR
DESIGNCR
PROGRESS UPDATE: REPORTDESIGNCR
AttendanceDESIGNCR
PDT ExpectationsDESIGNCR
Resolution of ProjNet CommentsDESIGNCR
Significant scope refinements for all disciplines (including RPIE/PP)DESIGNCR
Block/Floor PlansDESIGNCR
Project ScheduleDESIGNCR
Phasing & TransitionDESIGNCR
CommissioningDESIGNCR
Document recommendations, key findings, and decision points from the main presentationDESIGNCR
Current/updated PRC (refer to 01 10 10 SOW, PRC section)DESIGNCR
Current RPIE/PP Cut sheets and Product LiteratureDESIGNCR
Current typicalsDESIGNCR
Current CESDESIGNCR
Key constraints and milestones and move sequencing related to the Transition PlanDESIGNCR
SUBMITTAL 2: FINAL CONSTRUCTION DOCUMENTSDESIGNCR
Program for DesignDESIGNCR
RPIE/PP and CES Inventory ListDESIGNCR
Existing Conditions and Baseline ReportsDESIGNCR
Civil-SiteDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
LandscapingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
ArchitecturalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Structural-SeismicDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Sustainability (Refer to UFC 4-510-01 and UFC 1-200-02)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Fire Protection and Life SafetyDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
DESIGNCR
Furniture, Fixtures, EquipmentDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Binders (MTF and Departmental)DESIGNCR
SpecificationsDESIGNCR
Interstitial Building Systmes (IBS) - Refer to UFC 4-510-01DESIGNCR
MechancicalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
PlumbingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CutsheetsDESIGNCR
SpecificationsDESIGNCR
ElectricalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
CutsheetsDESIGNCR
Communications and Electronic SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
SpecificationsDESIGNCR
AccessibilityDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Electronic Security SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
CybersecurityDESIGNCR
NarrativesDESIGNCR
Facility Related Control Systems List (FRCS)DESIGNCR
Anti-Terrorism & Force Protection (ATFP) - Refer to UFC RequirementsDESIGNCR
NarrativesDESIGNCR
DESIGNCR
Transportation and LogisticsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Structural Interior Design (SID), Wayfinding, SignageDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
ColorboardsDESIGNCR
SpecificationsDESIGNCR
Comprehensive Interior Design (CID)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Cut SheetsDESIGNCR
Color BoardsDESIGNCR
Attic Stock and Spare Parts ListDESIGNCR
Material & Spare Parts ListDESIGNCR
DESIGNCR
Commissioning - Refer to 01 10 15 Spec SectionDESIGNCR
SpecificationsDESIGNCR
DESIGNCR
Food ServiceDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
TransitionDESIGNCR
Transition Plan -Narratives/PlansDESIGNCR
Department Activity ScheduleDESIGNCR
Master Move ScheduleDESIGNCR
RPIE/PP Training ScheduleDESIGNCR
RPIE/PP Testing & Certification ScheduleDESIGNCR
Public Relations PlanDESIGNCR
Department Move SpreadsheetDESIGNCR
Transition Lessons Learned SurveyDESIGNCR
Temporary Facilities - Refer to UFCs for additional submittal requirements & USACE Master Guide TemplateDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Project ScheduleDESIGNCR
Utility Shutdown Schedule Matrix (Preliminary)DESIGNCR
Presentation SlidesDESIGNCR
World-Class ChecklistDESIGNCR
01 10 14CONSTRUCTION
PRECONSTRUCTION SUBMITTALS:PRECONSTRUCTION
Environmental Protection PlanPRECONSTRUCTIONGA
Interim Life Safety PlansPRECONSTRUCTIONGA
Utility Shutdown Schedule MatrixPRECONSTRUCTIONGA
Quality Control PlanPRECONSTRUCTIONGA
Micro Work PlansPRECONSTRUCTIONGA
Accident Prevention PlanPRECONSTRUCTIONGA
Contractor Key PersonnelPRECONSTRUCTIONGA
PermitsPRECONSTRUCTIONGA
Construction Submittal RegisterPRECONSTRUCTIONGA
Plans Required by the InstallationPRECONSTRUCTIONGA
Site Logistics PlanPRECONSTRUCTIONGA
Commissioning PlanPRECONSTRUCTIONGA
Demolition Work PlanPRECONSTRUCTIONGA
Infection Control Risk Assessment (ICRA)PRECONSTRUCTIONGA
Interim Smoke Management PlansPRECONSTRUCTIONGA
Health & Safety PlanPRECONSTRUCTIONGA
Indoor Air Quality PlanPRECONSTRUCTIONGA
CONSTRUCTION SUBMITTALS:CONSTRUCTIONGA
Transition PlanCONSTRUCTIONGA
Cybersecurity PlanCONSTRUCTIONGA
CommissioningCONSTRUCTIONGA
Statement of ConditionsCONSTRUCTIONGA
Utility Shutdown MatrixCONSTRUCTIONGA
Shop Drawings & Other Submittals (Refer to 01 10 12 Admin, Submittal Register and Technical Specs (Div 02-33)CONSTRUCTIONGA
DMLSS Data Entry InformationCONSTRUCTION
01 10 15COMMISSIONING
Design Phase Submittals:COMMISSIONING
OPRCOMMISSIONINGCR
Commissioning SpecsCOMMISSIONINGCR
Commissioning Design Review & ReportCOMMISSIONINGCR
Commissioning PlanCOMMISSIONINGGA
Prefunctional Checklist TemplatesCOMMISSIONINGCR
Functional Performance Testing TemplatesCOMMISSIONINGCR
BAS/DDC Contol Integration & CoordinationCOMMISSIONINGCR
Issue Tracking LogCOMMISSIONINGCR
Construction Phase SubmittalsCOMMISSIONING
Commissioning PlanCOMMISSIONINGGA
Commissioning Schedule & PhasingCOMMISSIONINGCR
Construction Submittal Review ReportCOMMISSIONINGCR
Construction On-Site/Field Observation ReportCOMMISSIONINGCR
BAS and DDC Coordination MeetingsCOMMISSIONINGCR
Startup ReportsCOMMISSIONINGCR
Building System Certifications & Testing RecordsCOMMISSIONINGCR
PreFunctional ChecklistsCOMMISSIONINGCR
Functional Performance Testing TemplatesCOMMISSIONINGCR
Readiness Verfication ReportCOMMISSIONINGCR
TAB Verification ReportCOMMISSIONINGCR
FPT Testing ReportsCOMMISSIONINGCR
Supplemental Design Document & AsBuilt UpdatesCOMMISSIONINGGA
Trending LogsCOMMISSIONINGCR
O&M ManualsCOMMISSIONINGGA
O&M TrainingCOMMISSIONINGGA
Closeout & Warranty PhaseCOMMISSIONINGGA
OPRCOMMISSIONINGGA
Final Commissioning Report & System ManualCOMMISSIONINGGA
Cybersecurity RMFCOMMISSIONINGGA
Post Construction SubmittalsCOMMISSIONING
Commissioning ReportCOMMISSIONINGGA
Lessons Learned Workshop & ReportCOMMISSIONINGCR
01 10 16CLOSEOUT & WARRANTY
Inspection, Acceptance and Closeout PlanCLOSEOUTGA
Inspection DocumentationCLOSEOUTGA
O&M DataCLOSEOUTGA
Closeout ScheduleCLOSEOUTGA
Sustainability ReportsCLOSEOUTGA
Commissioning ReportsCLOSEOUTGA
RPIE/PP & CES & TransitionCLOSEOUTGA
Real Property Listing (RPIE)CLOSEOUTGA
Record Documents & As-BuiltsCLOSEOUTGA
Control sequences and diagramsCLOSEOUTGA
Transfer and Acceptance of Military Real Property (DD Form & AF Forms)CLOSEOUTGA
Closeout Documentation - Record DocumentsCLOSEOUTGA
RPIE/PP & CES & Transition DocumentationCLOSEOUTGA
Room IdentifierCLOSEOUTFIO
InventoriesCLOSEOUTGA
Contractor Furnished Contractor Installed Equipment (CF/CI)CLOSEOUTGA
Government Furnished Contractor Installed Equipment (GF/CI)CLOSEOUTGA
Attic StockCLOSEOUTGA
PhotographsCLOSEOUTFIO
01 10 17SCHEDULE
Contractor Proposed ScheduleSCHEDULEGA
Design-Project ScheduleSCHEDULEGA
Pre-Charrette Schedule (Preliminary)SCHEDULEGA
Submittal 1 Schedule (Initial)SCHEDULEGA
Submittal 2 Schedule (Final)SCHEDULEGA
Construction Project SchedulesSCHEDULEGA
Transition SchedulesSCHEDULEGA
3-Week Look Ahead SchedulesSCHEDULEGA
Closeout & Warranty ScheduleSCHEDULEGA
Monthly Update SchedulesSCHEDULEGA
01 10 18QUALITY CONTROL
Quality Control PlanQUALITYGA
Design Quality Control PlanQUALITYGA
01 10 19SAFETY
Refer to EM 385-1-1 Safety & Health RequirementsSAFETYGA
01 10 20ENVIRONMENTAL PROTECTION
Environmental Protection PlanENVIRONMENTALGA
01 10 21TEMPORARY CONSTRUCTION FACILITIES
Construction Site PlanTEMP FACILITIESGA
Backflow Preventers CertificateTEMP FACILITIESCR
Backflow Tester CertificateTEMP FACILITIESCR
Backflow Prevention Training CertificateTEMP FACILITIESCR
Traffic control planTEMP FACILITIESGA
Electrical/communications connection plan/details;TEMP FACILITIESGA
Water/waste connection plan/detailsTEMP FACILITIESGA
Product data, as requiredTEMP FACILITIESFIO
Construction and Safety Signs: Elevations, graphics, installation detailsTEMP FACILITIESGA
Test Reports: Backflow Preventer Tests;TEMP FACILITIESCR
Backflow Tester Certification;TEMP FACILITIESCR
Backflow Preventers Certificate of Full Approval;TEMP FACILITIESCR
DIV 02EXISTING CONDITIONS
024116Structure DemolitionDESIGN / PRECONCR
024119Selective DemolitionDESIGN / PRECONCR
DIV 03CONCRETE
33300Architectural ConcreteSamplesCR
34500Precast Architectural ConcreteSamplesCR
Exterior wallsMock upGA
Mix DesignGA
DIV 04MASONRY
Visible prefinished Unit masonrySamplesCR
Exterior wallsMock upGA
DIV 05METALS
Visible finished metal finishesSamplesCR
DIV 06WOOD, PLASTICS, AND COMPOSITES
64113Wood Veneer faced Architectural CabinetsSamples of finishNote 3
64116Plastic Laminate Faced Architectural CabinetsSamples of finishCR
64216Flush wood panelingSamplesCR
64219Plastic laminate faced wood panelingSamplesCR
64400Ornamental WoodworkSample of finishCR
Panelling Interior wallMock upCR
06 41 16Plastic Laminate CabinetsShop DrawingsCR
DIV 07THERMAL AND MOISTURE PROTECTION
74113.16Standing Seam Metal RoofSample of roof/finishCR
074213.19Insulated Metal Wall PanelsSample of panel/finishCR
074213.53Metal Soffit PanelsSample of panel/finishCR
074616Aluminum SidingSample of panel/finishCR
074619Steel SidingSample of panel/finishCR
Exterior WallsMock upGA
Hydraulic Cement - Qualification DataCONSTRUCTIONDA
07 27 00Building Air Barrier System (Sheet & Fluid Applied)CONSTRUCTION
Test ReportsCONSTRUCTIONDA
Final Acceptance TestsCONSTRUCTIONDA
Qualifications of InstallersCONSTRUCTIONGA
Shop DrawingsCONSTRUCTIONDA
WarrantiesCONSTRUCTIONGA
Record DrawingsCONSTRUCTIONGA
07 81 00Spray Applied FireproofingCONSTRUCTION
Product DataCONSTRUCTIONFIO
Inspector ReportsCONSTRUCTIONDA
Qualifications of Qualified Lead InstallerCONSTRUCTIONGA
Certifications: Surface Preparation Report & Manufacturer’s Inspection ReportCONSTRUCTIONFIO
WarrantiesCONSTRUCTIONGA
07 84 00Fire StoppingCONSTRUCTION
Product DataCONSTRUCTIONFIO
Inspector ReportsCONSTRUCTIONDA
Qualifications of Qualified Lead InstallerCONSTRUCTIONGA
Qualifications of InspectorCONSTRUCTIONDA
WarrantiesCONSTRUCTIONGA
DIV 08OPENINGS
All prefinished door materialSamplesCR
81000All finished metal systemsSamplesCR
Aluminum Framed Entrances and Storefronts - SamplesCR
88000Glass and GlazingSamplesCR
Exterior/Interior wallsMock upGA
08 10 00DoorsCR
08 71 00DOOR HARDWARECR
DIV 09FINISHES
All finish materialSamplesCR
09 67 23.14Chemical Resistive Resinous Flooring
Product DataCONSTRUCTIONFIO
GA– Product SamplesCONSTRUCTIONCR
Test ReportsCONSTRUCTIONDA
Final Acceptance TestsCONSTRUCTIONCR
Qualifications of InstallersCONSTRUCTIONGA
WarrantiesCONSTRUCTIONGA
DIV 10SPECIALTIESCONSTRUCTION
All specialty materialsCONSTRUCTIONCR
Wall and Door ProtectionCONSTRUCTIONCR
Window TreatmentsCONSTRUCTIONCR
Signage & WayfindingCONSTRUCTIONCR
Cubicle Curtains & TracksCONSTRUCTIONCR
10 41 63ELECTRONIC MESSAGE SIGNAGECONSTRUCTIONCR
Product Literature that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Qualifications of installers and inspectorsCONSTRUCTIONGA
Warranty informationCONSTRUCTIONGA
Joint Interoperability Test Command (JTIC) Approval DocumentationCONSTRUCTIONDA
Contact Information for Repair Technician or Emergency Repair CompanyCONSTRUCTIONCR
10 28 00TOILET, BATH, AND LAUNDRY ACCESSORIESCONSTRUCTION
Product Literature that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
10 44 16FIRE EXTINGUISHERSCONSTRUCTIONCR
10 50 00STORAGE SPECIALTIESCONSTRUCTIONCR
10 51 00LOCKERSCONSTRUCTIONCR
DIV 11EQUIPMENTCONSTRUCTION
11 20 00COMMERCIAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 22 13VAULT EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 28 00OFFICE EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
CONSTRUCTION
11 30 00RESIDENTIAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 41 00FOODSERVICE STORAGE EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 42 00FOOD PREPARATION EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTION
11 43 00FOOD DELIVERY CARTS AND CONVEYORSCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 44 00FOOD COOKING EQUIPMENT GeneralCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 46 00FOOD DISPENSING EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 48 00FOODSERVICE CLEANING AND DISPOSAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 53 00LABORATORY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
CONSTRUCTION
11 53 23LABORATORY REFRIGERATORS & FREEZERSCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 67 00RECREATIONAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 71 00STERILIZING EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 72 00EXAMINATION AND TREATMENT EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 73 00PATIENT CARE EQUIPMENTCONSTRUCTION
[Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]CONSTRUCTIONCR
[Warranty information.]CONSTRUCTIONGA
[Joint Interoperability Test Command (JTIC) Approval Documentation.]CONSTRUCTIONCR
[Contact Information for Repair Technician or Emergency Repair Company]CONSTRUCTIONCR
[Qualifications of installers and inspectors.]CONSTRUCTIONCR
[Specification Compliance Document]CONSTRUCTIONCR
11 73 20POINT OF USE SYSTEMSCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 74 00DENTAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 75 00OPTICAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 76 00OPERATING ROOM EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 77 00RADIOLOGY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 78 00MORTUARY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 79 00THERAPY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 80 00FACILITY MAINTENANCE AND OPERATION EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 81 00FACILITY MAINTENANCE EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 82 00SOLID WASTE HANDLING EQUIPMENTCONSTRUCTION
[Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]CONSTRUCTIONCR
[Warranty information.]CONSTRUCTIONGA
[Joint Interoperability Test Command (JTIC) Approval Documentation.]CONSTRUCTIONCR
[Contact Information for Repair Technician or Emergency Repair Company]CONSTRUCTIONCR
[Qualifications of installers and inspectors.]CONSTRUCTIONCR
[Specification Compliance Document]CONSTRUCTIONCR
11 94 00VETERINARY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
11 73 13PATIENT BED SYSTEMSCONSTRUCTION
[Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]CONSTRUCTIONCR
[Warranty information.]CONSTRUCTIONGA
[Joint Interoperability Test Command (JTIC) Approval Documentation.]CONSTRUCTIONCR
[Contact Information for Repair Technician or Emergency Repair Company]CONSTRUCTIONCR
[Qualifications of installers and inspectors.]CONSTRUCTIONCR
[Specification Compliance Document]CONSTRUCTIONCR
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
DIV 12FURNISHINGSCONSTRUCTION
All materialsCONSTRUCTIONCR
12 35 00SPECIALTY CASEWORKCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions,utility connection points and parts lists isometric drawings,CONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
D. Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 35 70HEALTHCARE CASEWORKCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions,utility connection points and parts lists isometric drawings,CONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
D. Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 40 00FURNISHINGS AND ACCESSORIESCONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
CONSTRUCTION
12 50 00FURNITURECONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 51 00OFFICE FURNITURECONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 52 00SEATINGCONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 56 00INSTITUTIONAL FURNITURECONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 56 23RELIGIOUS FURNITURECONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 56 70HEALTHCARE FURNITURECONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, and parts listsCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
12 59 00SYSTEMS FURNITURECONSTRUCTION
Product Information that shall include manufacturers’ installation instructions, isometric drawings, utility connection points, and parts listsCONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
Factory samples material and color from which to select. Samples will be held for comparison at deliveryCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
Interior FurnitureCONSTRUCTIONCR
Exterior FurnitureCONSTRUCTIONCR
ArtworkCONSTRUCTIONCR
Water FeaturesCONSTRUCTIONCR
CONSTRUCTION
DIV 13SPECIAL CONSTRUCTIONCONSTRUCTION
13 27 54.00Electromagnetic (EM) ShieldingCONSTRUCTION
Test ReportsCONSTRUCTIONDA
Final Acceptance TestsCONSTRUCTIONCR
Qualifications of InstallersCONSTRUCTIONGA