Unit Price Pavement Restoration Services; Citywide
Solicitation number
OCWUT WY-0066/SY-0033
Issued by
Oklahoma County, Oklahoma City, Oklahoma

About this file

This document is a Technical Specifications volume for a Unit Price Pavement Restoration Services contract issued by the Oklahoma City Water Utilities Trust (OCWUT). The contract covers citywide repair and restoration services for driveways, sidewalks, and other surfaces disturbed during waterline and sewer work. The Utilities Department estimates approximately 750 project sites will require restoration services over the contract term. The contract will be awarded to one or more pre-qualified contractors on a unit price basis, with each contract not exceeding $2,000,000. Work will be assigned through individual Work Orders, and contractors must complete each work order within 30 business days of issuance. The contract term is one year from the date of award or until the estimated contract capacity is achieved.

Contractors will be reimbursed based on unit prices specified in the bid items, with payment submitted monthly via invoices. The contract includes provisions for liquidated damages if work is not completed on time, with penalties ranging from $300 to $500 per business day depending on the contract amount. Contractors must provide performance, statutory, and maintenance bonds. The work requires adherence to the City of Oklahoma City's Standard Specifications for Public Improvements, with specific requirements for concrete, backfill, mailbox restoration, and traffic control. Contractors must also maintain proper traffic control, obtain necessary permits, and coordinate with utility services, with daily maintenance of traffic control devices to be performed by a certified technician.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OKLAHOMA

CITY

WATER

UTILITIES

TRUST

VOLUME 2 OF 2

TECHNICAL SPECIFICATIONS

Trustees:

James D. Couch, Chairman, Independent Trustee Sharon Voorhees, Independent Trustee Bradley Carter, Council Trustee David Holt, Mayor Trustee

Mark K. Stonecipher, Vice Chairman, Surrogate Trustee Craig Freeman, City Manager Trustee

Brent Bryant, Surrogate Trustee

Chris Browning, General Manager Amy K. Simpson, Secretary

Project WY-0066/SY-0033

Unit Price Pavement Restoration Services Citywide

SPECIAL PROVISIONS

BACKGROUND

The City of Oklahoma City is the state’s largest drinking water provider, treating and delivering an average of 100 million gallons of water daily to more than 1.4 million residents through retail and wholesale service connections. The Oklahoma City Water Utilities Trust (OCWUT) finances municipality-owned critical assets to deliver the water services as well as wastewater and solid waste collection services.

The Oklahoma City water service area includes the corporate limits of Oklahoma City (City) (~621 square miles), select cities within the combined statistical area, and areas along the raw water pipelines to Lakes Atoka and McGee Creek. The City of Oklahoma City Utilities Department (Utilities Department) manages the operation of these critical services, which are distributed over a vast geographical area that consists of approximately 4,245 miles of pressurized water mains, service lines, gravity mains, and the Atoka raw water line.

STATEMENT OF PURPOSE

OCWUT is soliciting competitive bids and intends to award contract(s) for repair and restoration services on an as-needed basis throughout the Oklahoma City service area described above and hereafter referred to as the Unit Price Contract(s). For this Unit Price Contract, restoration services are defined as construction services to repair driveways, sidewalks, and other surfaces disturbed or temporarily placed as a result of waterline and sewer work performed by OCWUT operations or other contractors. The work and services provided under the awarded contract(s) must be performed by pre-qualified contractors based on a Work Order process identified and assigned by the Line Maintenance Division of the Utilities Department (Line Maintenance) in separate Work Orders. The Contractor will invoice the OCWUT and will be reimbursed on a unit price basis for work completed in accordance with the Unit Price Contract. All expenses related to labor, tools, materials, and equipment necessary for restoration services will be included in the unit prices specified for the Bid Items outlined in the Electronic Bidding Process. These details can be found in the Summary of Bid Items that is provided and attached to these Bidding Documents. The Summary of Bid Items shall be bid in quantities of one. Provided, however, Work Orders may include more than one quantity of any item bid.

The Utilities Department estimates that approximately 750 Project Sites will require restoration services over the term of the Contract.

LEGISLATIVE DETERMINATION

The OCWUT has established a process for competitively bidding public construction contracts as a service area-wide unit price contract. This approach efficiently and effectively addresses the necessary improvements and repairs. By awarding contracts for restoration services to one or more bidders, the OCWUT aims to enhance efficiency in restoring damaged properties. This will result in savings on contract administration through timely issuance of work orders and the prompt completion of restoration services.

PART 1 – SPECIAL PROVISIONS GENERAL

It is the intent of these Special Provisions to provide for the necessary Work including, but not limited, to driveway, sidewalk, and mailbox restoration services. These Special Provisions are included and are made a part of and apply to the Bidding Documents for this Unit Price Contract. Where in conflict with the Standard Specification, these Special Provisions shall govern. Copies of the “Standard Specifications for the Construction of Public Improvements” may be viewed or downloaded at www.okc.gov/departments/public-works.

1.0 WORK

The Work will be defined in each Work Order and will consist of furnishing all labor, materials, equipment, transportation, and other incidental items required for restoration services following repairs completed by the Utilities Department or their representatives, with minimal interference to customers and City operations.

2.0 WORK ORDER

The Work Order is the official notice received by the Project Manager or designee to authorize the Work for each written Work Order under the terms of the Unit Price Contract(s). Information included in the written Work Order will include:

1) Issuance Date

2) Location(s)

3) Estimated Scope of Work and each location

4) Estimated Project quantities and construction amounts

5) Any special instructions, notices, or directives as determined by the Project

Manager

Work Orders issued by e-mail for quick response Work Orders will be followed by written official Work Orders as soon as practical.

3.0 PROJECT

The Project is defined as the total Work authorized by the Work Order and completed by the Contractor(s) at each location specified in each Work Order according to the provisions set forth in the Contract Documents and the Unit Price Contract.

4.0 PROJECT SITE

The Project Site is defined as the total area disturbed by the Work or used to store equipment and materials to complete the Work at each location in the Work Order.

5.0 CONTROL OF THE WORK

All Work shall be done under the supervision of Contractor, and its designated representatives, (collectively referred to as “Contractor”) http://www.okc.gov/departments/public-works

Project Manager. The “Project Manager” is the Utilities Director designee that establishes the sequence and priority of Work Orders for this Unit Price Contract. The Project Manager will make the final determination on the amount of Work performed at the Project Site(s) and if the quality of the Work meets the provisions of the Contract Documents.

The Project Manager’s decisions and estimates are final.

Inspector. All the Work completed in the field described in the Work Order shall be inspected by the Project Manager. Provided, however, the Project Manager may delegate another qualified inspector to the site, including, but not limited to, Line Maintenance staff or Public Works Field Service staff. The Project Manager will coordinate any needed testing or special inspections required by the Work Order.

6.0 REJECTION OF BIDS

Bids may be rejected if it is mathematically or materially unbalanced. Bids are mathematically unbalanced if the Bid contains items as lump sums or unit prices that do not reflect reasonably estimated costs plus a reasonable proportionate share of the Bidder’s anticipated profit, overhead costs, and other indirect or incidental costs. Bids are materially unbalanced if that Bid, as a whole, creates a reasonable doubt that award to the Bidder submitting a mathematically unbalanced Bid will not result in the lowest cost.

7.0 CONTRACT AWARD

A Unit Price Contract may be awarded to the lowest and best competitive bidder(s), according to the provisions set forth in these Bidding Documents. The OCWUT may award multiple contracts to the lowest and best competitive bidders, if each bidder qualifies under these Bidding Documents and the OCWUT determines that it is in the best interest of the OCWUT to award multiple contracts. The OCWUT will take into consideration that the OCWUT and the customers desire to expedite the restoration of property and that meeting these goals requires multiple contracts and contractors to work simultaneously. The contract amount for each awarded contract shall not exceed $2,000,000.

The low factor of the bid award will be determined based upon the mathematical application of each bidder’s unit prices to estimated typical quantities in restoration services, as established by OCWUT prior to the bid opening.

The OCWUT may in its discretion award additional Unit Price Contracts pursuant to this Notice to Bidders. To qualify, the bidder or bidders must be within ten (10%) percent of the low bidder, as the bids are evaluated as described above, but such qualification does not require the OCWUT to award more than one contract.

Provided further that OCWUT reserves the right to competitively bid and award other additional restoration services contracts for the same or similar types of construction projects, either as stand-alone projects or unit price contracts, during the same or overlapping periods with these, other or additional funds.

The OCWUT may award one or more Unit Price Contracts, each up to the not-to-exceed amount noted above. Award of Unit Price Contract(s) does not guarantee the issuance of Work Orders to any contractor, or an equal or comparable amount of Workers among contractors.

The successful Bidder(s), now known as Contractor, is neither guaranteed the issuance of any Work Orders nor the issuance of Work Orders adding up to the not-to-exceed contract amount. Additionally, the OCWUT reserves the right to not award any contract pursuant to this Notice to Bidders.

8.0 CONTRACTOR AND SUBCONTRACTOR

All Work must be performed by the Contractor, unless written approval from the Utilities Director or Project Manager is obtained in advance for subcontracting services, including but not limited to, driveway, mailbox construction, traffic control work, or any other specific services.

Subcontracting work performed without prior written approval from the Utilities Director or Project Manager shall constitute unauthorized work.

The Contractor and any subcontractor performing the Work authorized in a Work Order must be prequalified with the City of Oklahoma City for the class of work to be performed before any Work commences.

9.0 SUPERVISION

Notwithstanding any requirement to perform Work for any Work Order, neither the OCWUT nor Oklahoma City will recognize any subcontractor related to this Work. When Work is in progress, the Contractor must always be present at the Project Site of the Work either in person or by a qualified and approved superintendent employed by the Contractor who shall be in direct charge of all operations.

10.0 CONTRACT TERM

The Contract term will expire after a period of one (1) year after commencing on the date of award as approved by the OCWUT or if the estimated contract capacity is achieved, whichever occurs first. Any pending Work Orders issued prior to the expiration of this Contract may extend past the expiration to meet substantial completion upon approval of the Utilities Director or designee.

11.0 BONDS

The Contractor must provide a Performance Bond, Statutory Bond and Maintenance Bond in the not-to-exceed contract amount. The Maintenance Bond will be effective upon the completion of all Work Orders issued under the Unit Price Contract and will be effective for two (2) years thereafter.

12.0 SCOPE OF WORK

The Scope of Work will be stated in each Work Order. If upon inspection of the Project Site, the Contractor believes that additional Work will be required, then the Contractor will contact the Project Manager and request an amended Work Order (change order) before commencing Work. A Pre-Work Conference will be held with the Contractor and Line Maintenance to discuss sequencing of Work Orders, locations, estimated time of completion for each Work Order, commencement and completion dates for Work Orders and estimated costs.

13.0 WORK ORDER ISSUANCE

The Project Manager is authorized to issue Work Orders for this Project under the provisions of the Unit Price Contract(s) and the Contract Documents. Work Orders may include one or more locations as needed.

The first Work Orders will be issued first to the lowest Contractor, then to secondary low Contractors, if any. Each Work order issued will contain approximately 5 to 15 restoration sites. Work Orders will be grouped by the Project Manager to prioritize repairs based on proximity and urgency to best address the needs of the City and OCWUT. Subsequent Work Orders may be issued to each Contractor based on completion of each existing assigned Work Order so that each Contractor continues to have Work Orders as authorized until the Contractor has performed up to the not-to-exceed amounts in the Contract. Certain Work Orders, subsequent to the initial Work Orders to Contractor(s), may be timed or delayed based by the City for the best interests of the City including, but not limited to, timing and completion of the Work Orders to have the least effect on public use of City street, the least effect on public safety services, and to obtain the best results.

14.0 PERMITS

The Contractor must obtain all required permits before work commences on each Work Order. The cost for obligatory permits under this Unit Price Contract will not be reimbursed directly but must be included in the price bid on other items.

15.0 PROSECUTION OF WORK

Upon issuance of a Work Order by the Project Manager, the Contractor must timely commence, construct, and complete the repair and restoration as set forth in individually issued Work Orders . The Contractor must continuously prosecute the Work as specified in the Work Orders issued. Unless specifically agreed with the Contractor(s), subsequent Work Orders may be withheld or Work defined in existing Work Orders reassigned to other Contractor(s) where significant progress has not been observed for three (3) consecutive days, excluding Saturday, Sunday, and holidays.

The OCWUT may withhold the assignment of additional Work Orders to any Contractor who has an outstanding Work Order that has exceeded the Work Order completion date until the Contractor completes all delinquent Work Orders.

16.0 INSPECTION

All Work described in the Work Orders and performed by the Contractor will be inspected in the field by the Project Manager or designated qualified Inspector. If any Work is determined by the Inspector to not have been constructed in accordance with the Contract Documents or if the Contractor is unable to clearly demonstrate to the satisfaction of the

Inspector that the Work was completed in accordance with the Contract Documents, then the Work will not be considered complete until re-inspection by the Inspector. If the Project Manager determines the Work to be unacceptable, then the Contractor will remove and replace the Work and/or remediate the Work to become compliant with the Contract Documents or the directive of the Utilities Director at Contractor’s sole cost and expense.

17.0 PAYMENT

OCWUT will pay each Contractor for Work completed in accordance with the Contract Documents based upon the unit prices bid by that Bidder, now Contractor, and the quantities actually installed; provided the Contractor will not be paid for quantities in excess of the Work Order, unless the Work Order has been amended as provided herein.

The Contractor must submit to OCWUT an itemized for all work performed, utilizing the unit prices in that Contractor’s bid, to constitute as an authorized claim for payment. The Contractor’s unit price costs must be shown on the invoice for all compensable costs.

The payment claim packet shall be submitted along with a payment voucher to the Project Manager for payment.

Invoices must be monthly and include the date of completion for each Work Order. All monthly invoices for Work Orders shall be delivered to the following address for processing:

Attn: Finance Operations Utilities Department 420 W. Main Street, Suite 500

Oklahoma City, OK 73102 Email: LMACCTPAYABLE-CONTRACTOR@okc.gov and LMutilityrepairs@okc.gov

If electronically signed copies of the Uniform Vouchers/Claim Forms and Invoices are submitted, please email them. If hard copies are submitted, please submit two (2) copies of Uniform Vouchers/Claim Forms and Invoices, along with the copy of the Work Order(s) submitted or PO number on the claim form.

18.0 QUANTITY

OCWUT does not guarantee any specific quantity of Bid Items or Work Orders. All listed quantities in the Work Order are estimates only. The total quantities shown for the Bid Items in the Summary of Bid items attached for reference and in the Electronic Bidding Process are estimated and are for the purpose of comparing Bids.

19.0 MOBILIZATION

Any costs associated with normal mobilization, including but not limited to preparatory operations and movement of equipment and personnel to the Work Order location are considered incidental and will not be paid for separately. Emergency mobilization, where designated on the Work Order, will be provided according to the provisions of these Special Provisions.

mailto:LMACCTPAYABLE-CONTRACTOR@okc.gov mailto:LMutilityrepairs@okc.gov

20.0 INCIDENTAL WORK

Any work not covered in the Bid or NOT shown or described in the Summary Bid Items shall be considered as incidental to construction for which the Contractor is responsible and will not receive additional payment. Any item or work described and identified as incidental in these Bidding Documents will not be paid for separately but will be included by Bidder/Contractor in the unit price bid for other items.

21.0 TESTING

The Utilities Department reserves the right to conduct compaction and nuclear moisture testing on backfill under pavement in accordance with the Standard Specifications. All costs of conducting testing required for the Work, which meet specification requirements, will be paid by OCWUT. All costs of testing, which do not meet specification requirements will be deducted from Contractor’s Uniform Vouchers/Claim Forms and Invoices for OCWUT cost reimbursement.

22.0 CORRECTION OF WORK AFTER FINAL PAYMENT

Neither the final acceptance nor payment nor any provision in the Contract Documents will relieve the Contractor of responsibility for defective materials or workmanship. The Contractor must remedy any defects related to defective materials or workmanship and pay for any damage to property or other work resulting therefore, which appears or is identified within a period of two (2) years from the date of formal acceptance of the Contract (not each Work Order) by OCWUT.

23.0 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK

All Work which has not been authorized or has been rejected or not in conformity with the Contract Documents or which is defective must be timely repaired or if it cannot be satisfactorily repaired, it must be timely removed and replaced by the Contractor at the Contractor’s sole expense. Defective, rejected, and non-conforming materials or workmanship must be removed immediately from the Work and Project Site.

Work done outside and/or beyond the area or scope defined by the Work Order, not in conformity with the Standard Specifications or the Standard Details, covered without proper inspection, or any extra or unclassified Work done without written authority (Amended Work Order) will be considered unauthorized. Unauthorized Work will not be measured or paid. Unauthorized Work may also be ordered removed by the Contractor at the Contractor’s expense.

If the Contractor fails to immediately and satisfactorily repair or satisfactorily removed and replaced, and any rejected, defective, unauthorized, or non-conforming work or materials, the OCWUT will, after giving written notice to the Contractor(s), have the authority to have defective Work remedied or removed and replaced by others and will deduct the cost thereof from any compensation due to the Contractor. At the OCWUT’s sole discretion, OCWUT may accept rejected, defective, unauthorized, or condemned Work or materials and make an equitable deduction from the Contract payment due the Contractor.

24.0 PROTECTION OF PRIVATE PROPERTY

Less and except within the right-of-way or a utility easement, the Contractor may not enter upon private property for any purpose without first obtaining permission from the property owner. The Contractor is responsible for the preservation of private property. The Contractor will use every precaution necessary to prevent damage to all trees, fences, culverts, bridges, pavements, driveways, irrigation systems, sidewalks etc., to all water, sewer, gas, or electric lines and appurtenances, and to all other public or private property, facilities, and improvements along within, or adjacent to the Work.

25.0 UTILITY COORDINATION

The Contractor shall, as required by applicable law, notify Oklahoma One Call “Call Okie” (811 or 1-800-522-6543) and coordinate with Line Maintenance to locate and verify all utilities within the Project Site prior to excavation.

The Contractor must notify the proper representatives of any public service or utility corporation and company, or any individual not less than twenty-four (24) hours in advance of any Work, which may damage or interfere with the operation of such property, along, within, or adjacent to the Work.

The Contractor is responsible for all damage or injury to property of any character resulting from an act, omission, neglect, or misconduct of the Contractor, and those for whom the Contractor is liable, in the manner or method of executing the Work. When and where any such direct or indirect damage or injury is done to public or private property due to an act, omission, neglect, or misconduct of the Contractor, and those for whom the Contractor is liable, in the execution of Work or the non-execution of the Work, the Contractor must make good for such damage or injury by payment of damages or settlement with the property owner.

26.0 CONSTRUCTION ZONE CLEARING

The Contractor must use every precaution necessary to prevent damage to all trees, shrubs, bushes, sod, vegetation, fences, sidewalks, driveways, pavement, etc.

(collectively referred to as “private property” adjacent to the line of construction and outside the Project Site. The Contractor shall take every necessary precaution to prevent injury or damage to the Work or any part thereof by the action of the elements or any other cause whatsoever, whether arising from the execution or non-execution of the Work. Until final acceptance by OCWUT, the Work shall be under the charge and care of the Contractor.

27.0 PROPERTY DAMAGE AND RESTORATION

All property repairs, remediation, and restoration in the Project Site that include, but are not limited to sod, trees, shrubs, hedges, mailboxes, sprinkler lines, meter boxes, driveways, sidewalks, or paving that result from necessary and non-negligent Work will be completed by the restoration services OCWUT contract. The Contractor will make every effort to not disturb the existing irrigation and sprinkler lines and will keep landscape and concrete repair to a minimum. If any damage is caused to private property during the repair, the Contractor is required to take photos and document the damage and immediately notify the Project Manager.

If the damage is found to have occurred due to the intentional or unintentional acts, omissions, negligence, or misconduct of the Contractor, their subcontractors, agents, employees, or staff, then it will be the Contractor’s sole responsibility to either repair such damages or reimburse OCWUT for the total amount of damages, costs, and expenses, including interest for three percent (3%) of the total damages. The OCWUT may deduct any such damages, costs and expenses from subsequent payments due to the Contractor, or OCWUT may back bill the Contractor for the repair and remediation.

28.0 ESTABLISH CONDITION OF PROPERTY

The condition of real property and private property at the Project Site will be established by the Pre Construction Videos and pictures as provided by the Project Manager. The Contractor shall replace any damaged or relocated property with new property as depicted on each Work Order. All costs for replacement or relocation will be at the submitted Unit Bid price.

29.0 UTILITY ALTERATION

When an Oklahoma City or OCWUT utility asset alteration is a part of the Work to be performed by the Contractor as a part of this Unit Price Contract, such Work shall be done in conformity with the requirements of the Standard Specifications and Standard Details for new Work of this type. The cost of any such alteration must be included by the Contractor in an Amended Work Order request, unless otherwise expressly shown in the Summary of Bid Items.

30.0 MAINTAINING ACCESS

The Contractor is responsible for safely managing traffic flow and maintaining reasonable continuous vehicle and pedestrian access to all businesses and homes unless otherwise specifically authorized in the Work Order. If there is only one access point, temporary access must be constructed and maintained until the original access is re-established unless otherwise specifically authorized in the Work Order. The Contractor will coordinate the driveway cut with the respective business or property owner.

31.0 STREET CLOSURE

Street crossing construction shall be accomplished at only ½ width of the street at a time so that no roadway shall be completely closed without prior authorization from the Utilities Director or Project Manager. The Contractor will be responsible for traffic control and work zones.

32.0 DETOURS

When full or partial street closures are required for construction, the Contractor shall submit documentation showing detour routes to the Project Manager for approval. The Contractor must sign and maintain all detour routes and the signs and devices must be in conformance with the requirements of the “Manual on Uniform Traffic Devices”.

33.0 BARRICADES AND WARNING SIGNS

Where the Work is carried on, in, or adjacent to, any street, alley, or public place, the Contractor shall, at his own expense, furnish, erect, and maintain such barricades, fences, lights, warning signs and danger signals and shall provide such watchmen and take such other precautionary measures for the protection of persons or property and of the Work as may be necessary. In addition, enough barricades shall be erected to keep pedestrians and vehicles from entering on or into any Project Site. From sunset to sunrise, the Contractor shall furnish and maintain at least one light on each barricade. All devices shall be in conformance with the “Manual on Uniform Traffic Devices”. The Contractor shall provide an “after hours” phone number to the City’s Emergency Operations Center and to the Public Works Field Services Division to be used for notification to the Contractor of the need to repair signs, barricades, or other warning or control devices.

Failure to comply with these requirements may result in the issuance of a Stop Work Order to remain in effect until the deficiencies are corrected. The Contractor shall not be entitled to additional compensation or time for such a Stop Work Order.

34.0 DRAINAGE

The Contractor shall be responsible for grading all disturbed areas to drain as well or better than existing condition.

35.0 SEDIMENT AND EROSION CONTROL

The Contractor shall be responsible for the repairs and replacement of all erosion control measures. All costs associated with the developing a storm water pollution prevention plan, obtaining a storm water discharge permit, and obtaining other City, State, or Federal land or water disturbing permits are considered incidental and will not be paid for separately.

36.0 PRE AND POST CONSTRUCTION VIDEO

The costs for pre and post construction video and pictures will not be reimbursed directly but will be included in other bid items. All video or pictures shall be submitted on request on digital media such as a flash drive saved by address listed on the Work Order.

37.0 SUBSTANTIAL COMPLETION

The Contractor is required to complete each work order within 30 business days from the issuance date, as directed by the project manager or their designated qualified Inspector representative. The Contractor must provide a preliminary schedule for each work order, detailing the expected start and completion dates for the various portions of the work.

Once the work is completed, the contractor must inform the project manager or their designee and allow three business days for inspection. A work order is considered substantially complete when all paved surfaces are installed, the Project Site has been restored to a condition equal or better than prior to disturbance, including removal of all spoil and leaving the area “to grade” with existing, and a punch list is drafted for any remaining work items. After all punch list items are completed and all remaining Work is determined to be satisfactorily completed, the Work Order will be presented to OCWUT for payment.

38.0 FINAL CLEAN UP

Upon completion of the Work and before inspection by the Project Manager and approval for payment , the Contractor shall clean and remove from the Project Site, surplus and discarded materials, temporary structures, barricades, and other warning devices, stumps, portions of trees, and debris of any kind. The Contractor shall leave the Project Site in a neat and orderly condition. Waste materials removed from the Project Site shall be disposed of at locations satisfactory to the Project Manager and in compliance with Federal, State, and City of Oklahoma City requirements.

39.0 WORK ORDER COMPLETION

Work Order completion is defined as the completion of all the Work defined in each Work Order as determined by the Project Manager and approved the Work Order for payment by OCWUT. Upon completion of a Work Order, that portion of the Contract, defined by the Work Order, will be deemed complete and the Contractor will no longer be liable under the terms of the Performance Bond. The Contractor will continue to be responsible for the workmanship for all projects, regardless of substantial completion date, for two years after completion of the last Work Order issued under this Contract. In addition, the Maintenance Bond will be effective upon the completion of all Work Orders issued under the Unit Price Contract and will be effective for two (2) years thereafter.

40.0 FAILURE TO COMPLETE WORK ON TIME

The time of completion is of the essence. For each working business day that any work remains incomplete past the 30 business day timeframe established herein or as increased by additional work or materials ordered after the Work Order is received, or the increased time granted by the City for the completion of said work, the sum per day given in the following schedule, unless specified otherwise in the Bid or Special Provisions, will be deducted from the monies due to the Contractor, not as a penalty but as liquidated damages.

Amount of Contract Minimum Amount of Liquidated Damages Per Business Day

Less than $100,000 $300.00 $100,000 and less than $1,000,000 $400.00

$1,000,000 and over $500.00 or up to 0.052% of the contact price per business day

The sum of money thus deducted for such delay, failure or non-completion is not to be considered as a penalty but should be deemed, taken, and treated as reasonable liquidated damages since it would be impartible and extremely difficult to fix the actual damages.

If work is not completed within 45 days, the work will be assigned to another vendor.

PART 2 – RESTORATION SERVICES CONSTRUCTION REQUIREMENTS

STANDARD SPECIFICATIONS

All Work and materials shall conform and be provided in accordance with The City of Oklahoma City's "Standard Specifications for the Construction of Public Improvements" (Standard Specifications) as most recently amended, is included by reference in these Bidding Documents in its entirety as though fully set forth herein. The provisions of the Standard Specifications are applicable to and binding upon this Project unless and except where specifically superseded by a provision(s) of the Bidding Documents and/or the Special Provisions for this Project. The Special Provisions shall prevail over any conflicting statement or requirement elsewhere in the Bidding Documents.

PORTLAND CEMENT CONCRETE (PCC)

Portland Cement Concrete (PCC), meeting the requirements of Section 932 of the Standard Specifications, used for driveways, sidewalks, and paved areas, including those specified for fast-track patching or 6-inch paving, shall be High Early Strength Concrete (HES) that meets the requirements of Section 406 of the Standard Specifications.

BACKFILL UNDER PAVEMENT

Type “A” aggregate material shall be provided and placed as backfill under paved surfaces including streets, sidewalks, and parking areas. The aggregate material shall meet the requirements for Type “A” as provided by Table 923.01 in the Standard Specifications and placed as shown in Standard Detail 501.01 and D800A.

MAILBOXES

Mailboxes must be restored to their original condition. They can be either temporary or permanent and may be made from materials such as brick, wood, or iron. Due to the wide variety and complexity of designs, the Contractor will need to address this matter promptly to find suitable materials for replacement. The replacement material should match the original as closely as possible. If the original material is no longer produced and cannot be sourced, the Contractor must validate a suitable replacement and obtain the customer's approval before installation. All brick and rock mailboxes will be replaced with Portland cement mortar and conform to Section 933 of the Standard Specifications.

PART 3 – BID ITEMS

The following section describes the Bid Items to be used for the Work for the Project.

The following section numbers refer to the Standard Specifications Sections and the Bid Item specific to this Unit Price Contract and listed in the Summary of Bid Items attached to these Bidding Documents. This section (Part 3 – Bid Items) is additive and does not delete or waive the Standard Specifications or Standard Details, but where this Part 3 conflicts with the Standard Specification or Standard Details, this Part 3 controls.

802-01 & 802-02, CONSTRUCTION SIGNING AND TRAFFIC CONTROL

The Contractor must establish and maintain traffic control devices throughout each Project Site as required by the latest Traffic Standards and Specifications and shall conform to the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD).

The Contractor is responsible for replacement of all traffic control devices damaged, destroyed or removed during construction which shall be considered as incidental and will not be paid for separately.

Maintenance. The daily maintenance of traffic control devices on the Project Site must be performed by a Contractor by a “Certified Work Zone Temporary Traffic Control Technician”. The Contractor’s employee’s certification must be from a nationally recognized organization approved by OCWUT.

Traffic Control Plan (TCP). A TCP is required for all Work performed on arterial and/or collector parks, or other such locations as may be determined by the City Engineer. The TCP must be approved by the Public Works Department, Traffic Management Division for any Work is performed.

OCWUT reserves the right to remedy (at the Contractor’s expense) any neglect on the part of the Contractor regarding the establishment, placement, or maintenance of traffic control devices in accordance with the MUTCD and the TCP that may affect the public convenience and safety, without notice and at the Contractor’s expense.

809-01 & 809-02 QUICK RESPONSE

Unless otherwise directed by the Work Order, the Contractor must mobilize and start Work within two (2) hours of receiving a verbal Notice to Proceed or written Work Order, whichever comes first. The Contractor must work continuously until the Work is completed including nights, weekends, and holidays. Provided, however, the Work may require a tap or tie in which must be performed during certain hours.

812-01 through 812-03 REMOVAL OF EXISTING PAVING Where sidewalks, driveways and other existing paved surfaces are to be removed, the Contractor will be paid at the unit price bid for the related Bid Item(s). Gravel or dirt driveways must be restored to an equal or better condition as specified in the “temporary surfacing” section below.

If the Work includes removal of a paved area(s), Type “A” aggregate material must be provided and installed level to the surface elevation and compacted to the provisions of the Standard Specifications and Standard Details.

END OF SECTION

BACKGROUND
STATEMENT OF PURPOSE
LEGISLATIVE DETERMINATION
PART 1 – SPECIAL PROVISIONS GENERAL
1.0 WORK
2.0 WORK ORDER
3.0 PROJECT
4.0 PROJECT SITE
5.0 CONTROL OF THE WORK
6.0 REJECTION OF BIDS
7.0 CONTRACT AWARD
8.0 CONTRACTOR AND SUBCONTRACTOR
9.0 SUPERVISION
10.0 CONTRACT TERM
11.0 BONDS
12.0 SCOPE OF WORK
13.0 WORK ORDER ISSUANCE
14.0 PERMITS
15.0 PROSECUTION OF WORK
16.0 INSPECTION
17.0 PAYMENT
18.0 QUANTITY
19.0 MOBILIZATION
20.0 INCIDENTAL WORK
21.0 TESTING
22.0 CORRECTION OF WORK AFTER FINAL PAYMENT
23.0 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK
24.0 PROTECTION OF PRIVATE PROPERTY
25.0 UTILITY COORDINATION
26.0 CONSTRUCTION ZONE CLEARING
27.0 PROPERTY DAMAGE AND RESTORATION
28.0 ESTABLISH CONDITION OF PROPERTY
29.0 UTILITY ALTERATION
30.0 MAINTAINING ACCESS
31.0 STREET CLOSURE
32.0 DETOURS
33.0 BARRICADES AND WARNING SIGNS
34.0 DRAINAGE
35.0 SEDIMENT AND EROSION CONTROL
36.0 PRE AND POST CONSTRUCTION VIDEO
37.0 SUBSTANTIAL COMPLETION
38.0 FINAL CLEAN UP
39.0 WORK ORDER COMPLETION
40.0 FAILURE TO COMPLETE WORK ON TIME
PART 3 – BID ITEMS

File details come from the government source that posted it. Updated .