WWW14 Maui Maui Asbestos OM Plan r2v1 2023.pdf
PDF 388 KB Posted
- Solicitation number
- SOA48714PACAFNDAG
About this file
This document is an Asbestos Operations and Maintenance (O&M) Program for the Federal Aviation Administration's (FAA) HNL District facilities in Maui, specifically covering multiple facilities with airport-related codes such as OGG-ASR, OGG-ATCT, QHK-RCAG, and others. The primary purpose of the program is to minimize employee exposure to asbestos fibers through proactive management strategies, including maintaining asbestos-containing materials (ACM) in good condition, ensuring proper cleanup of released fibers, preventing further fiber release, monitoring ACM conditions, and minimizing ACM impact during renovation and construction projects.
The document details comprehensive procedures for handling asbestos, including facility inspections, emergency response protocols, work control systems, and specific requirements for different classes of asbestos work. An initial asbestos survey identified various asbestos-containing materials in different facilities, with percentages and locations noted. The plan follows FAA, OSHA, EPA, and state regulations, emphasizing employee training, proper notification, engineering controls, and safe handling of asbestos-containing materials. The document includes multiple appendices with definitions, applicable standards, forms, and standard operating procedures to guide safe asbestos management across the Maui SSC facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C001 Proposed Site Plot Plan.pdf | ||
| WWW14 QHK RCAG Lead Table.pdf | ||
| SUMMARY OF WORK_QHK NDAG Tower Installation Maui HI.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
OPERATIONS AND MAINTENNANCE
PROGRAM
For
HNL District
WWW14 Maui SSC Maui of the following Facilities:
OGG-ASR OGG-ATCT
OGG-GS OGG-LOC
OGG-MM OGG-OM
OGG-RTR OGG-VOR
QHK-RCAG QHK-RTR
QPN-ATCBI
Asbestos Operations and Maintenance Plan Prepared: 10/24/2023 by Steven K. Chun
INTRODUCTION
An Asbestos Operations and Maintenance (O&M) program is required for each facility containing known asbestos-containing materials (ACMs)/presumed asbestos containing materials (PACMs), or material suspected or assumed to contain asbestos. Asbestos containing material is defined as any material containing more than 1% asbestos. Suspect building materials must be assumed to contain asbestos or shall be reinspected and sampled by trained personnel and analyzed by an accredited laboratory prior to any renovation/demolition work.
Federal Aviation Administration (FAA) Order 3900.19B, Occupational Safety and Health Program, Chapter 15, Asbestos Control Program (ACP), defines policy for management of ACM and PACM in Federal Aviation FAA facilities. FAA Order 1050.20A, Airway Facilities Asbestos Control Program, provides Airway Facilities (AF) specific requirements for the ACP.
These FAA orders require that each facility in the National Airspace System (NAS) develop and implement an Asbestos O&M Plan. The O&M plan is one of the key elements in the FAA’s ACP. It provides a responsible alternative to asbestos removal by developing a pro-active, in-place asbestos management program for existing asbestos in and around buildings.
PURPOSE
The primary purpose of this O&M program is to minimize the exposure of all building occupants at the facility to asbestos fibers. This can be accomplished by proper employee training and work practices designed to:
• Maintain ACM in good condition.
• Ensure proper cleanup of previously released asbestos fibers.
• Prevent further release of asbestos fibers.
• Monitor the condition of known or suspect ACM.
• Minimize ACM impact during renovation, modification and construction projects
The policy regarding ACM at this facility is to make every effort to prevent employee exposure to airborne asbestos fibers. This shall be accomplished through employee training and awareness, engineering controls, personal protective equipment and published directives. This policy will remain in effect until the hazards from ACM are removed.
This Asbestos O&M Plan will be subject to change as the ACM in the facility is reduced through the modernization of the buildings, through changes in the Environmental Protection Agency (EPA) and Occupational Safety and Health Administration (OSHA) regulations, and/or changes in personnel and specific duty assignments.
Any national, regional, or facility labor-management agreements properly negotiated and signed, regarding asbestos management, will be appended to this document. A copy of this document will be provided to each bargaining unit, the System Support Center (SSC) Manager, and those units directly involved with asbestos operations and maintenance. Any asbestos maintenance and operations activity will be coordinated with the Facility Asbestos Coordinator (FAC).
FAA employees will not perform asbestos removal unless they are properly trained. Abatement activities that can be performed by FAA personnel at this facility will be limited to such work as performing floor tile/mastic removal, drilling holes through floor tile or anchoring items to walls.
These types of work activities are defined by OSHA as Class III asbestos work. The definition in 29 CFR 1926.1101 states “Class III asbestos work means repair and maintenance operations, where ACM, including TSI (thermal system insulation) and surfacing ACM and PACM, is likely to be disturbed. PACM is defined as thermal system insulation and surfacing material found in buildings constructed no later than 1980. The designation of a material as PACM may be rebutted by a building owner, at any time, by demonstrating that PACM does not contain asbestos (see 29 CFR 1926.1101 (k)(5)). The list of definitions pertaining to this O&M Plan can be found in APPENDIX 1, DEFINITIONS.
SCOPE
A comprehensive Facilities ACP is required for all buildings and facilities by FAA Order 1050.20A, and 3900.19C, Chapter 15. Each SSC will have a general plan that will be supplemented by facility specific plans which include the following elements: Facility Asbestos Surveys, Facility Plans, Work Control System, Response Actions, Respiratory Protection and Personal Protective Equipment, Air Monitoring, Quality Assurance/Quality Control (QA/QC), Training and Communications, Medical Surveillance and Recordkeeping.
This site-specific O&M Plan is included as part of the Facility Plans as required by the ACP.
Although ACM can be removed from a facility, when appropriate precautions are taken, both OSHA and EPA recommend implementation of a proactive O&M program for managing asbestos in place. The program is to be accomplished through notification; surveillance; work practice and controls; recordkeeping; worker protection and training. This O&M plan follows the guidelines set out in FAA Order 1050.20A to accomplish these goals and to continue to be in compliance.
The purpose of this O&M plan is to provide for the on-going safety and health of all employees and visitors to the facility. This objective is achieved through the following activities:
• Periodic inspection and assessment of ACM and PACM.
• An on-going program of facility ACM condition inspection.
• Air monitoring under the direction of a Certified Industrial Hygienist (CIH) to establish baseline fiber counts during abatement activities at manned facilities.
• Recordkeeping.
• Specialized and dedicated asbestos operations and maintenance equipment.
• Written Standard Operating Procedures (SOP's) detailing work practices.
• A work permit system administered by the FAC under which all ACM related activities performed by FAA and contractors are controlled and documented.
This O&M program addresses all ACM/PACM present in the buildings which comprise this facility, including debris and dust that may have been released from installed ACM. The program will be implemented by the Safety and Environmental Compliance Manager (SECM) who is also acting as the FAC. This O&M program meets or exceeds the requirements of FAA Order 1050.20A and of any applicable Federal, state, and local laws.
On August 10, 1994, OSHA defined four classes of asbestos work. They include:
• OSHA Class I: Activities involving the removal of thermal system insulation (TSI) and sprayed-on, troweled-on, or otherwise applied surfacing ACM/PACM.
• OSHA Class II: Activities involving removal of ACM/PACM which is not TSI or surfacing materials.
• OSHA Class III: Repair and maintenance operations which are likely to disturb
ACM/PACM.
• OSHA Class IV: Custodial and housekeeping operations where minimal contact with ACM/PACM may occur.
Larger scale projects (OSHA Classes I and II) involving more complex procedures for the intentional removal of ACM are considered asbestos abatement projects. These projects require asbestos control and abatement procedures that are outside the scope of this O&M plan.
Federal, state, and local regulations provide the basis for developing a facility O&M plan. The most pertinent regulations for this O&M plan can be found in APPENDIX 2, APPLICABLE
STANDARDS AND GUIDANCE.
PROGRAM RESPONSIBILITIES
The responsibility for successful management of in-place asbestos rests with the following authorities:
The Western Service Area (WSA) Safety Specialist
• Provide technical guidance and program oversight for the implementation and management of the ACP.
• Serve as the focal point for all regional ACP matters.
• Ensure that program and budget requests identify resource requirements to implement the
ACP.
• Ensure that documentation associated with the ACP meets applicable regulatory requirements and review such documentation prepared by NAS Implementation Program and Districts.
• Ensure routine inspections and program reviews of ACP activities are conducted and that inspection and surveillance records are maintained and updated.
Support Center (SSC) Manager
• Provide input to asbestos issues affecting employees and areas.
• Relay asbestos information to National Air Traffic Controllers Association (NATCA) and
Professional Airways System Specialist (PASS) representatives, and any other employee representatives and on-site contractors.
• Assist FAC in obtaining and assigning resources to accomplish O&M Plan elements.
• Ensure periodic surveillance is conducted at all facilities with asbestos in accordance with the union contracts.
• Notify the SECM if damaged ACM are identified during periodic surveillance so that appropriate actions can be implemented.
• Ensure employees receive annual asbestos training and medical surveillance as needed.
Safety and Environmental Compliance Manager (SECM)/FAC
• Ensure that the District Manager, or designee, is notified immediately of any release of
ACM/PACM at the facility.
• Provide employee "Hazard Communications" related to asbestos.
• Coordinate response to WSA regarding asbestos issues.
• Act as the FAC in implementing and coordinating the asbestos O&M Plan.
• Ensure regulatory compliance on asbestos related subjects.
• Review and implement health and safety recommendations related to asbestos.
• Work closely with all FAA employees and contractors on matters pertaining to ACM and
PACM.
• Coordinate medical surveillance, as required.
• Coordinate facility asbestos re-inspection.
• Oversee asbestos bulk sampling. Identify locations and post required asbestos warning signs.
• Coordinate asbestos air monitoring.
• Assist with annual re-inspections
Employees
• Review the Asbestos survey inventory report for each facility that he/she is responsible for maintaining.
• Follow the Work Control process prior to starting any maintenance activity or project that may impact facility components.
The following pertinent paperwork can be found in APPENDIX 3, APPLICABLE FORMS:
• Preconstruction Checklist
• Work Request Review
• Asbestos Work Permit
• Periodic Surveillance Summary Sheet
A link to the WSA operating procedures and negative exposure assessments can be found in
APPENDIX 4, WSA STANDARD OPERATING PROCEDURES
ASBESTOS LOCATIONS
An initial asbestos survey following AHERA protocols was conducted at all the Maui SSC facilities. AHERA inspections focus on the identification of asbestos containing building materials (ACBM) such as surfacing materials, thermal system insulation, and miscellaneous materials. Suspect PACM not readily accessible in walls, doors, gaskets, roofing, and sealants, etc., were not sampled by the FAA and must be assumed to contain asbestos until proven otherwise. The full report of the survey is on file with the site SSC Manager and the
SECM.
The building materials in the following facilities were found to contain asbestos:
OGG-ASR
Room Location Material Description ACM Type Total Asb.
Engine Generator Building
160 sq ft of non-friable 1'x1' white floor tile mastic (assoc. floor tile is non-ACM) Chrysotile 29%
Engine Generator Trailer engine generator gaskets ASSUMED NA
Lavatory 50 sq. ft. of 1’x1’ green floor tile Chrysotile 3% Lavatory Black penetration sealant Chrysotile 26% Equipment Room 1600 sq. ft. of 1’x1’ green floor tile (2 Rooms) Chrysotile 3% Equipment Room Brown penetration sealant Chrysotile 25% Equipment Building 80 linear ft of exterior penetration sealant underneath building Chrysotile 8%
OGG-ATCT
Room Location Material Description ACM Type Total Asb.
Break Room panel mastic Assume NA Perimeter fire door Assume NA Throughout Joint compound on Gypsum board walls and ceilings Assume NA
OGG-GS
Room Location Material Description ACM Type Total Asb.
Transformer Housing 70 sq ft of non-friable cementitious panels comprising walls & roof; ABATED BY FMP OCT 2008; NEW BLDG 2009 NA NA
Exterior- Wall 48 linear ft of non-friable cementitious skirting;
ABATED OCT 2008; NEW BLDG 2009 NA NA
OGG-LOC
Room Location Material Description ACM Type Total Asb.
Exterior- Wall 72 linear ft of non-friable cementitious skirting;
ABATED FMP NOV 2008; NEW BLDG 2009 NA NA
OGG-MM
DECOMMISIONED IN 1995
OGG-OM
DECOMMISIONED IN 1995
OGG-RTR
No asbestos was identified in this facility. Facility must be reinspected and sampled by trained personnel and analyzed by an accredited laboratory prior to any renovation/demolition work.
OGG-VOR
No asbestos was identified in this facility. Facility must be reinspected and sampled by trained personnel and analyzed by an accredited laboratory prior to any renovation/demolition work.
QHK-RCAG
Equipment Room 95 Linear ft. of black baseboard and mastic Chrysotile 12% Equipment Room 528 sq. ft. of non-friable 9"x9" brown floor tile under carpeting Chrysotile 8% RCAG non-friable 1'x1' cream floor tile & associated mastic Chrysotile <1% ** RCAG non-friable 1'x1' textured floor tile Chrysotile 1% ** = Laboratory analysis of material came back as less than one percent (<1%) asbestos. If material is to be removed, the material will need to be removed as asbestos per OSHA regulations. Local landfill may not accept less than one percent asbestos as general waste. Will need to call the local landfill for disposal requirements.
QHK-RTR
Room Location Material Description ACM Type Total Asb.
Equipment Room Non-friable 9"x9" pink floor tile under carpeting Chrysotile 2% Exterior 3 sq. ft. of non-friable brown penetration sealant Chrysotile 23% Kitchen Non-friable 9"x9" pink floor tile under brown floor tile Chrysotile 2% Lavatory- Floor Non-friable 9"x9" pink floor tile under brown floor tile Chrysotile 2% RTR- Floor Non-friable 1'x1' brown patterned floor tile Chrysotile <1% ** Exterior 1700 sq ft of non-friable surface texture Chrysotile 3% Roof 1 sq. ft. of non-friable black penetration sealant Chrysotile 20% Roof 760 sq. ft. of non-friable silver paint Chrysotile 3% ** = Laboratory analysis of material came back as less than one percent (<1%) asbestos. If material is to be removed, the material will need to be removed as asbestos per OSHA regulations. Local landfill may not accept less than one percent asbestos as general waste. Will need to call the local landfill for disposal requirements.
QPN-ATCBI
Room Location Material Description ACM Type Total Asb.
Equipment Room 608 sq. ft. of non-friable 9"x9" tan floor tile under carpet Chrysotile 2%
Equipment Room 608 sq. ft. of non-friable 9"x9" tan floor tile mastic under carpet Chrysotile 15%
Exterior 1 sq. ft. of non-friable penetration sealant Chrysotile 54.5% Lavatory 38 sq. ft. of non-friable 1'x1' orange floor tile Chrysotile 2% Lavatory 38 sq. ft. of non-friable 1'x1' orange floor tile mastic Chrysotile 16% Engine Generator Room non-friable EG gaskets Chrysotile 10% Throughout Baseboard Mastic Throughout Gypsum Board with Joint compound
Exterior and Interior Walls non-friable green wall coating/surface texture on exterior & interior walls Chrysotile 5%
ASBESTOS SURVEY RECOMMENDATIONS
The following are recommendations for ACM identified in these facilities. Materials assumed asbestos-containing should be sampled by trained personnel and analyzed by an accredited laboratory prior to removal or alteration. Unless planned renovations, repairs, damaged ACM, or the potential for damage require actions, it is recommended that the ACM identified in this report not be disturbed or removed. If the ACM should be distributed or removed for any reason, personal protective equipment and properly trained personnel must be utilized.
Alterations to or the removal of asbestos-containing materials require adherence to all applicable federal, state, and local regulations concerning the removal and disposal of asbestos materials. Periodic condition inspections are recommended until the materials are removed.
FACILITY INSPECTION
Periodic Surveillance
A visual re-inspection of all known or presumed ACM in the facility shall be conducted at least annually by the FAC or another employee designated by the FAC and who has received at least 2 hours of awareness training. The reinspection shall be designed to detect damage to, or deterioration of, the ACM and to facilitate any corrective actions needed. Personnel conducting this surveillance should note, assess, and document all changes in condition of known or assumed ACM in the facility since the last inspection.
Personnel conducting this inspection shall be familiar with the facility and the contents of the Asbestos Inspection and Inventory Report.
Preconstruction Survey
Prior to the commencement of a renovation or demolition project, the affected part of the facility where the work will occur will be thoroughly inspected for the presence of asbestos.
NOTIFICATION AND SIGNAGE
Notification All building occupants, including employees, tenants, and contract service personnel shall be informed as to the following:
• Presence, location, and condition of known or assumed ACM in the facility.
• The nature of the asbestos hazard.
• How to avoid disturbing ACM.
• Name and telephone number of the FAC and/or primary asbestos contact for the facility.
Notification shall be provided by means of a program using written notification, signage, and labeling. Notification should also be given to all building occupants before the commencement of any construction projects where ACM will be disturbed.
Labels and Signs
• Asbestos warning signs shall be posted at all regulated areas at such distance from a regulated area so that an employee can see them and take protective steps to avoid entering the area.
• Signs shall be posted at the entrance to mechanical rooms/areas containing ACM/PACM which employees can reasonably be expected to enter.
• Where feasible, warning labels shall be affixed to previously identified TSI or surfacing that is ACM/PACM, e.g., in areas where routine maintenance takes place and/or where there is reasonable likelihood of contact with these materials.
• Notification of outside contractors. Non-asbestos abatement contractors performing work in FAA facilities covered by this order shall be subject to the work control system.
WORK CONTROL SYSTEM
The purpose of the Asbestos Work Control System is to control the activities, facility personnel, and work practices that may impact the asbestos within the facility. Personnel initiating the work must request, receive approval for, and post an asbestos work permit prior to all activities that may contact or disturb the asbestos. The FAC shall review and approve all work permits involving asbestos operations.
In addition to the asbestos work permit, the requirements of the latest edition of Order 3900.60, FAA Preconstruction and Maintenance Project Safety and Health Checklist, shall be followed.
Work Permits
Work Permits shall be required whenever there is a potential to disturb any asbestos containing materials. The FAC shall issue those permits. A copy of this work permit is included in Appendix 2.
Examples of work that requires a permit are:
• Drilling, specifically hammer drilling.
• Cable pulling.
• Any wall, ceiling tile or floor tile removal.
• Construction, modifications and renovation of the facility.
• Any "active work" in regulated areas. “Regulated area” means an area established by the employer to demarcate areas where Class I, II, and/or III asbestos work is conducted, or any adjoining area where debris and waste from such asbestos work accumulate; and where airborne concentrations of asbestos exceed, or there is a reasonable possibility that they may exceed, the permissible exposure limit (PEL). The PEL is equal to 0.1 fibers per cubic centimeter of air as an 8-hour time weighted average. (See Appendix 1. Definitions).
• Removal and installation of ceiling electrical fixtures in the vicinity of ceilings that contain
ACM or PACM.
• Work in or near areas where TSI may be disturbed.
Air samples may be taken during some of these activities, if directed by the FAC. If possible, tests will be run prior to those activities to determine the expected airborne level of asbestos and procedures and protection will be based upon the results of these samples.
Work will be halted if there are indications that asbestos is becoming airborne and migrating outside the asbestos containment controls. Work will remain stopped until measures are implemented to contain/reduce the airborne concentrations to acceptable levels.
RESPONSE ACTIONS
Asbestos response actions at this facility will be performed by either FAA employees (Class III and IV only), or contractors. One or more of these response actions may be required to safely manage and dispose of ACM/PACM. Response actions include abatement, encapsulation, enclosure, repair, and operations and maintenance. The type of response action may be determined by any of the following: condition of the ACM/PACM, proximity to occupied areas, potential for disturbance, and/or planned renovations or demolition activities. When a potential health hazard to building occupants exists due to the presence of damaged or friable ACM/PACM, appropriate response actions shall be initiated. Whenever an accidental release occurs, FAA employees may be used to contain the area to prevent the spread of contamination to nearby work areas until such time as a licensed contractor can be obtained.
Class I and Class II Asbestos Abatement Projects
Class I and II abatement projects shall be conducted by qualified contractor employees in strict accordance with Federal, state, and local regulatory requirements, and FAA orders.
Asbestos abatement specifications and project designs shall be prepared by an EPA or state certified project designer. Specifications shall be site specific and provide sufficient information to enforce the contract documents. Specifications and project design must include detailed procedures to be used by the abatement contractor to safely and thoroughly abate the asbestos while assuring the safety and health of employees in the facility.
All abatement shall be performed by a licensed abatement contractor using workers who have been trained according to EPA requirements by state accredited training providers.
The contractor shall prepare a written asbestos abatement plan that shall comply with the requirements of the project specifications and be compatible with the current facility asbestos abatement contingency plan, Federal, state, and local requirements, and other applicable FAA orders and guidelines.
Project oversight and environmental monitoring shall be performed by a licensed independent third party environmental monitoring firm contracted by the FAA. The work shall be performed under the direct supervision of a Certified Industrial Hygienist (CIH) employed by the environmental monitoring firm.
Class III and Class IV Asbestos Projects
Class III and IV asbestos projects shall be conducted by FAA or contractor employees in strict accordance with this O&M Plan; Federal, state, and local requirements; and FAA orders.
Standard Operating Procedures are found in Appendix 3. Employees must be trained at a minimum as an asbestos O & M worker. Air monitoring will be conducted as required and at the direction of the FAC.
The definition in 29 CFR 1926.1101 states “Class III asbestos work means repair and maintenance operations, where ACM, including TSI (thermal system insulation) and surfacing ACM and PACM, is likely to be disturbed.” PACM means “Presumed Asbestos Containing Material” (PACM) and is defined as thermal system insulation and surfacing material found in buildings constructed no later than 1980. The designation of a material as PACM may be rebutted by a building owner, at any time, by demonstrating that PACM does not contain asbestos (see 29 CFR 1926.1101 (k)(5)).
Class IV activities include housekeeping in locations containing ACM/PACM that does not disturb the intact material. Class IV may also include the cleanup of residue that may contain asbestos. The determination of whether residue may likely contain asbestos will be performed in coordination with the SECM. Surface sampling (wipe, vacuum, tape, etc.) shall not be used for this determination due to the lack of regulatory standards and established, standardized criteria to interpret sample results.
Storage, Transportation, and Disposal of ACM/PACM
All asbestos waste generated at FAA facilities will be segregated, stored, transported, and disposed of in accordance with all applicable Federal, state, and local requirements.
• Storage. ACM/PACM waste shall be stored inside leak-proof containers in designated areas until properly transported to an approved disposal site. The containers shall be properly labeled and stored in such a manner as to reduce the potential for accidental disturbance.
• Transportation. The waste hauling company will be licensed, per applicable state requirements, to transport ACM/PACM waste.
• Disposal. All ACM/PACM waste shall be disposed of at a site currently approved to accept asbestos waste materials in accordance with Federal, state, and local requirements. The transporter shall be required to provide a completed waste shipment record to the FAA within 30 days after removal of the waste from the site. If the completed waste shipment record is not received back from the disposal site within 35 days, the FAC will contact the disposal site and the waste hauler to determine the status of the shipment. If the completed waste shipment record is not received within 45 days after removal of waste from the site, the FAC will contact the appropriate state environmental department and the EPA to report the missing waste shipment record.
EMERGENCY PROCEDURES
The FAC/SECM and the SSC shall evaluate the emergency situation and develop appropriate response actions based upon the procedures detailed in this section and site specific conditions.
Emergency asbestos releases include the following:
1. Release during abatement or work involving ACM (follow the Facility Asbestos Abatement Contingency Plan).
2. Unplanned release of suspected asbestos fiber due to causes other than construction or repairs (follow steps outlined below).
Step 1: Employee Response
Any FAA employee who suspects that an ACM release has occurred shall:
• Vacate the area if possible, or isolate the disturbed ACM and notify their supervisor.
• Call the SECM and SSC manager. If they are not on duty, NAS Operations should be notified. The NAS Operations will then contact the people listed above.
Step 2. SECM Response
The SECM with the support of the SSC Manager, shall:
• Evaluate the emergency situation and develop hazard minimization procedures.
• Contact other groups/representatives such as the Unions and SSC Manager.
• Notify WSA P&R environmental PIM within two hours from the time of the incident and provide the following information:
1) Date of the incident
2) Time the problem occurred or was discovered
3) Nature of the problem and actions taken
4) Names of persons contacted
5) Name of person reporting the incident.
• Facilitate air monitoring, which shall be initiated and continued until the results indicate that airborne concentrations have returned to baseline/background levels.
• Assess the impact that the incident will have on NAS and other affected operations.
Decisions and clean-up activities will be based upon this impact.
• There may be a need to develop primary and secondary options in response to the emergency situation if there is a potential impact on the NAS.
1. Primary Response Options:
Isolate and seal off the area, if possible. If this is not possible or practical, the ACM should he isolated to prevent migration to other areas.
2. Secondary Response Options
A certified asbestos contractor should be contacted to clean up the release. Engineering controls should be considered if immediate action is required and time permits.
3. Review Options and Develop Recommendations
Based upon the situation and available resources, a recommended course of corrective action shall be developed from the available options and presented to the SSC Manager for review and approval. This selected course of action shall place priorities on employee protection and minimizing NAS impact.
4. Present the Recommendations to the SSC Manager
The SSC Manager or designated representative shall have the final decision on emergency actions. If the SSC Manager or designated representative is not available, the SECM shall have the decision-making authority.
5. Implement the Decision
6. The SECM with the support of the on-site Industrial Hygienist, O&M trained personnel, and other supporting personnel shall implement the decision made by the SSC Manager.
Emergency Response Evaluation
The persons involved in the emergency response shall meet as soon as possible after the emergency is corrected to discuss and evaluate the actions taken and to make recommendations to improve emergency response performance in the future.
APPENDIX 1
DEFINITIONS
APPENDIX 1. DEFINITIONS
Abatement. The process of removing, enclosing, repairing, or encapsulating ACM/PACM.
Air Monitoring. The process of measuring the airborne fiber content of a specific volume of air in a stated period.
Area Air Sampling. An air sample obtained by using a stationary air pump, with a sampling cassette in-line, to monitor air contaminants within contained or ambient air environments.
Asbestos. Chrysotile, amosite, crocidolite, tremolite, anthophyllite, actinolite, and/or any of these naturally-occurring minerals that has been chemically treated and/or altered.
Asbestos Containing Material (ACM). Any material containing more than one percent asbestos.
Asbestos Containing Building Material (ACBM). Surfacing ACM, thermal system insulation ACM, or miscellaneous ACM that is found in or on interior structural members or other parts of a building.
Asbestos Control Program (ACP). A comprehensive written program including policy and procedures for effective asbestos management, and covering at least the following areas:
oversight of Class I and II asbestos abatement contracts; routine inspections and assessment of ACM/PACM; area air sampling, exposure monitoring, and clearance determination; Class III and IV asbestos O&M work performed by FAA employees, including an O&M Plan and related standard operating procedures (SOP); a facility asbestos abatement contingency plan for unanticipated releases of asbestos fiber in buildings and facilities during contracted Class I and II asbestos operations; signage procedures; medical surveillance; training; recordkeeping; and quality control.
Baseline level sampling or background sampling. Area air sampling that is performed to identify the concentration of asbestos in the air before the start of any asbestos abatement work
Breathing Zone. Area of the worker located forward of the shoulder with a radius of 6 to 9 inches from the worker’s nose.
CFR. Code of Federal Regulations.
Certified Industrial Hygienist (CIH). One certified in the practice of industrial hygiene by the American Board of Industrial Hygiene (ABIH).
Class I Asbestos Operations. Activities involving the removal of TSI and surfacing ACM/PACM.
Class II Asbestos Operations. Activities involving the removal of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.
Class III Asbestos Operations. Activities involving repair and maintenance operations, where ACM including TSI and surfacing ACM/PACM is likely to be disturbed.
Class IV Asbestos Operations. Maintenance and custodial activities during which employees contact but do not disturb ACM/PACM and activities to clean up dust, waste, and debris resulting from Class I, II, and III activities.
Clearance Sampling. Air sampling performed at the end of an asbestos abatement project to clear the work area for re-occupancy by the general public.
Demolition. The wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.
Disturbance. Activities that disrupt the matrix of ACM/PACM, rendering the ACM/PACM friable, or generate visible debris.
Encapsulation. The procedure of coating ACM/PACM or abated substrates to control the possible release of asbestos fibers into ambient air.
Enclosure. An airtight, impermeable barrier around ACM/PACM to control airborne release of asbestos fibers into areas outside the barrier.
Employee Exposure. The exposure to airborne asbestos fibers that would occur if the employee were not using respiratory protection.
Facility Asbestos Abatement Contingency Plan (FAACP). An FAA document that details oversight and response procedures to be followed by facility management, employees, any FAA competent person, and the independent third party CIH during a Class I or II asbestos operations performed by a contractor.
Fiber. A particulate form of asbestos, 5 micrometers or longer, with a length-to-diameter ratio of at least 3 to 1.
Fit Factor. A quantitative estimate of the fit of a particular respirator to a specific individual, and typically estimates the ratio of the concentration of a substance in ambient air outside the respirator to its concentration inside the respirator when worn.
Fit test. The use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.
Friable Asbestos Containing Material. Capable of being crumbled, pulverized, or reduced to powder by hand pressure when dry, resulting in a release of airborne fibers.
High Efficiency Particulate Air (HEPA) Filter. A filter that is at least 99.97% efficient in removing mono-dispersed particles of 0.3 micrometers in diameter.
Industrial Hygienist. A professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop controls for occupational health hazards.
Negative Exposure Assessment. A demonstration by the employer, which complies with the criteria in 29 CFR 1926.1101, that employee exposure during an operation is expected to be consistently below the PELs.
Operations and Maintenance (O&M) Plan. A subset of the overall Asbestos Control Program, which provides work practices that will maintain ACM/PACM in good condition, ensure proper responses to minor asbestos releases, prevent further releases of asbestos, and monitor the condition of ACM/PACM.
Permissible Exposure Limit (PEL). OSHA PELs are worker exposure limits regulating the amount or concentration of a substance in air. For asbestos the concentration shall exceed:
1. An airborne concentration of asbestos of 0.1 fibers per cubic centimeter of air (f/cc) as an eight-hour time weighted average (TWA).
2. An airborne concentration of asbestos of 1.0 f/cc over a sampling period of 30 minutes
(Excursion Limit).
Personal Air Sampling. Sampling of the air within the breathing zone of an employee to determine asbestos fiber concentrations.
Powered Air-Purifying Respirator (PAPR). A type of respiratory protection which continuously supplies HEPA-filtered air to an enclosed face piece or hood.
Presumed Asbestos Containing Materials (PACM). TSI and surfacing materials found in buildings constructed before 1981. For the purpose of this chapter, PACM may also include other types of materials (such as flooring, roofing, siding and transite) not sampled and assumed as having the potential to contain asbestos.
Regulated Area (also known as Work Area). An area established by the employer where Class I, II, and III asbestos work is conducted; and which airborne concentrations of asbestos may exceed, the PEL.
Removal. All operations where ACM/PACM is taken out or stripped from structures or substrates, including demolition operations.
Renovation. The modifying of any existing structure, or portion thereof.
Repair. Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of ACM/PACM attached to structures or substrates.
Response Action. A method, including removal, encapsulation, enclosure, repair, operations and maintenance that protects human health and the environment from friable ACM.
Surfacing ACM. Material that is sprayed, troweled-on, or otherwise applied to surfaces (such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, and other purposes) and that contains more than 1 per cent asbestos.
Thermal System Insulation (TSI). ACM/PACM applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain.
APPENDIX 2
APPLICABLE STANDARDS AND GUIDANCE
References. The current version of referenced publications shall be used. Where conflicts exist between documents, the most stringent requirements shall apply.
Federal Aviation Administration (FAA)
- FAA Order 3900.19B, Chapter15, Occupational Safety and Health
- FAA Order 1050.20A, Airway Facilities Asbestos Control
- Local Order Asbestos Abatement Contingency Plan
- Article 77 Agreement Between DOT/FAA and the National Air Traffic Controller Association
(NATCA)
- Article 52 Agreement Between DOT/FAA and the Professional Airways System Specialists
(PASS)
- FAA Order 3900.57, Preconstruction Checklist
- WSA Asbestos Control Program, WSA WP-3900.19C-12-ACP
Occupational Safety and Health Administration (OSHA)
- 29 CFR 1926.1101, Asbestos in Construction
- 29 CFR 1910.1001, Asbestos in General Industry
- 29 CFR 1910.1020, Access to Employee Exposure and Medical Records
- 29 CFR 1910.134, Respiratory Protection
- 42 CFR Part 84 (NIOSH), Respiratory Protective Devices
United States Environmental Protection Agency (EPA)
- 40 CFR Part 61, Subpart M, National Emission Standard for Hazardous Air Pollutants
- 40 CFR Part 763, Subpart E, Asbestos-Containing Materials in Schools (AHERA)
- 40 CFR Part 763, Subpart C, Asbestos School Hazard Abatement Reauthorization Act
(ASHARA)
- Managing Asbestos in Place, A Building Owner’s Guide to Operations and Maintenance
Programs for Asbestos-Containing Materials, Office of Pesticides and Toxic Substances, 2OT-2003, July 1990
Department of Transportation (DOT)
- 49 CFR Part 171, Hazardous Materials Regulations, General Information, Regulations, and
Definitions
- 49 CFR Part 172, Hazardous Materials Regulations, Hazardous Materials Table, Special
Provisions, Hazardous Materials Communications, Emergency Response Information, Training Requirements, and Security Plans
- 49 CFR Part 173, Hazardous Materials Regulations, General Requirements for Shipments and Packaging
Hawaii Department of Health (HDOH), Indoor and Radiation Health Branch, Hawaii Occupational Safety and Health (HIOSH) Hawaii Administrative Rules (HAR), Title 11
- Chapter 11-501, Asbestos Requirements
- Chapter 11-502, Asbestos-Containing Materials in Schools
- Chapter 11-503, Fees for Asbestos Removal and Certification
- Chapter 11-504, Asbestos Abatement Certification Program
APPENDIX 3
APPLICABLE FORMS
Preconstruction Checklist Work Request Review Asbestos Work Permit
Periodic Surveillance Summary Sheet
Work Request Review Form
Submit at least 30 days prior to start of project Filled out online at: WRR Yellow submission button link https://ksn2.faa.gov/ajw/Home/wsa/techsvcs/SitePages/WSA%20EOSH%20Services%20
Ops%20Group.aspx
Part I of this form is filled out by the project initiator and requires the identification of:
1. Project Name
2. Project Location (include address, City, State and zip)
3. Scope of Work (attach plans and specifications); note here whether NEA will be used
4. Project Start Date
5. Expected Completion Date
6. Company Performing Work *
7. Person Supervising Work *
8. Name and Title of Person Making Request
Part II of this form requires completion by the SECM. The following elements require completion:
1. Work Request Number
2. If there is asbestos impact, a project ID number must be assigned
3. Approval/Disapproval of Permit Request with status.
4. General Remarks
5. Signature of the SECM
* If information regarding the company performing work, contractor supervising work, or FAA point of contact is not available when the form is initially filled out, the data can be provided to the SECM or designee when it becomes available.
The project shall not commence until the completed forms are received and signed by the
SECM.
A copy of the WRR form must be posted at the site PRIOR to the commencement of work.
https://ksn2.faa.gov/ajw/Home/wsa/techsvcs/SitePages/WSA%20EOSH%20Services%20Ops%20Group.aspx
WESTERN SERVICE AREA
WORK REQUEST REVIEW FORM
PART I – PROJECT INFORMATION
(To be Completed by Project Initiator)
NAME OF PROJECT:
PROJECT LOCATION:
SCOPE OF WORK: (Attach Plans and Specifications, Hazardous Materials Communication Plan and MSDS if Hazardous
Materials are to be used.)
PROJECT SCHEDULE: START DATE STOP DATE
WHO WILL BE PERFORMING THE WORK?
x FAA PERSONNEL CONTRACTOR
IF CONTRACTOR, COMPANY NAME
NAME OF PERSON SUPERVISING WORK
IF FAA PERSONNEL ARE PERFORMING WORK, LIST NAMES BELOW:
IF CONTRACTOR PERSONNEL ARE PERFORMING WORK, LIST NAMES BELOW:
PRINTED NAME, TITLE, PHONE NUMBER AND SIGNATURE OF PERSON MAKING
REQUEST
DATE
PART II – WORK REQUEST STATUS
(To be Completed by the FAC) Work Request #:
Will there be impacts to LCC or LBP?
YES
NO
If yes, Project ID#:
Will hazardous materials be used?
If yes, HAZCOM Plan & SDS Attached?
Is Asbestos present at the facility?
If yes, Project ID#:
Status: APPROVED DISAPPROVED
See Attached Asbestos Survey Report Do not impact asbestos
See Attached Lead Survey Report Do not impact lead coatings
A Lead Survey has not been performed at this facility, all paint must be assumed LCC / LBP Additional Remarks:
SIGNATURE OF FAC OR SECM DATE
REVISED FAA FORM WSA 1050-6B
WESTERN SERVICE AREA
HAZARDOUS MATERIALS WORK PERMIT
MUST BE POSTED AT WORK SITE
PART I – PROJECT INFORMATION
(To be Completed by Project Initiator)
PERMIT REQUESTED BY: DATE:
PHONE NUMBERS:
LOCATION OF WORK:
Building Name and #:
Street Address: City, State, Zip:
SCOPE OF WORK: (Attach Plans and Specifications, Hazardous Materials Communication Plan & MSDS if Hazardous Materials are to be used.)
PROJECT SCHEDULE: Start Date Stop Date
PART II – HAZARDOUS MATERIALS INFORMATION
(To be Completed by the FAC or SECM)
ASBESTOS IMPACTS:
Quantity Of ACM To Be Disturbed (Linear/Square/Cubic Feet):
Impacts: Friable Non-Friable Classification: Demolition Renovation Routine Maintenance Emergency Response Engineering Controls: Glove Bag Mini Containment Full Containment Other
* Date of EPA Notification: Date Approval Received:
** Date of State Notification: Date Approval Received:
*NESHAP regulations, 40 CFR 61, requires notification to the EPA if disturbance of ACM exceeds 260 linear feet, 160 square feet, or 35 cubic feet during a project; OR at the time annual accumulation of disturbed ACM will exceed these quantities.
**Notification in accordance with appropriate State Regulations.
LEAD IMPACTS:
Lead-Containing Coating Lead-Based Paint OSHA Trigger Task Non-OSHA Trigger Task
HAZARD COMMUNICATION:
HAZCOM Plan Attached SDS Attached HAZCOM/MSDS to be Provided by Initiator Incorporated to DO HAZCOM Program
REMARKS:
WORK PERMIT NUMBER:
(Provided by SECM)
PERMIT APPROVED BY:
TITLE:
PHONE:
This permit is issued with the understanding that those workers involved have received the appropriate training and all certifications, medical, and respiratory documentation has been reviewed and is current.
PERIODIC SURVEILLANCE SUMMARY SHEET
Date Surveillance Performed: Date Submitted to SMO FAC:
Facility Location: SSC:
Type of Surveillance: semiannual annual other
SSC FAC Name:
Surveillance Results
Instructions: If a change in ACM condition is noted on the Periodic Surveillance Data Sheet, the following information must be filled out for each ACM type where a change in condition was noted for each facility. Note: Include specific location (e.g. room number, room description, floor etc.).
ACM Type: Location:
Physical Damage (Y/N); Water damage (Y/N); Deterioration (Y/N).
Comments:
Accessible (Y/N); Activity Level near ACM (H/M/L); Location in Airstream (Y/N).
Comments:
ACM Type: Location:
Physical Damage (Y/N); Water damage (Y/N); Deterioration (Y/N).
Comments:
Accessible (Y/N); Activity Level near ACM (H/M/L); Location in Airstream (Y/N).
Comments:
ACM Type: Location:
Physical Damage (Y/N); Water damage (Y/N); Deterioration (Y/N).
Comments:
Accessible (Y/N); Activity Level near ACM (H/M/L); Location in Airstream (Y/N).
Comments:
ACM Type: Location:
Physical Damage (Y/N); Water damage (Y/N); Deterioration (Y/N).
Comments:
Accessible (Y/N); Activity Level near ACM (H/M/L); Location in Airstream (Y/N).
Comments:
APPENDIX 4
WSA STANDARD OPERATING PROCEDURES
For current operating procedures and negative exposure assessments, go to:
https://my.faa.gov/org/linebusiness/ato/operations/facilities_engineering/eosh_services/asbest os_control.html https://my.faa.gov/org/linebusiness/ato/operations/facilities_engineering/eosh_services/asbestos_control.html https://my.faa.gov/org/linebusiness/ato/operations/facilities_engineering/eosh_services/asbestos_control.html
| APPENDIX 1. DEFINITIONS |
| Abatement. The process of removing, enclosing, repairing, or encapsulating ACM/PACM. |
| Air Monitoring. The process of measuring the airborne fiber content of a specific volume of air in a stated period. |
| Area Air Sampling. An air sample obtained by using a stationary air pump, with a sampling cassette in-line, to monitor air contaminants within contained or ambient air environments. |
| Asbestos. Chrysotile, amosite, crocidolite, tremolite, anthophyllite, actinolite, and/or any of these naturally-occurring minerals that has been chemically treated and/or altered. |
| Asbestos Containing Material (ACM). Any material containing more than one percent asbestos. |
| Asbestos Containing Building Material (ACBM). Surfacing ACM, thermal system insulation ACM, or miscellaneous ACM that is found in or on interior structural members or other parts of a building. |
| Asbestos Control Program (ACP). A comprehensive written program including policy and |
| procedures for effective asbestos management, and covering at least the following areas: oversight of Class I and II asbestos abatement contracts; routine inspections and assessment of ACM/PACM; area air sampling, exposure monitoring, and clearance de... |
| Baseline level sampling or background sampling. Area air sampling that is performed to identify the concentration of asbestos in the air before the start of any asbestos abatement work |
| Breathing Zone. Area of the worker located forward of the shoulder with a radius of 6 to 9 inches from the worker’s nose. |
| CFR. Code of Federal Regulations. |
| Certified Industrial Hygienist (CIH). One certified in the practice of industrial hygiene by the American Board of Industrial Hygiene (ABIH). |
| Class I Asbestos Operations. Activities involving the removal of TSI and surfacing ACM/PACM. |
| Class II Asbestos Operations. Activities involving the removal of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, a... |
| Class III Asbestos Operations. Activities involving repair and maintenance operations, where ACM including TSI and surfacing ACM/PACM is likely to be disturbed. |
| Class IV Asbestos Operations. Maintenance and custodial activities during which employees contact but do not disturb ACM/PACM and activities to clean up dust, waste, and debris resulting from Class I, II, and III activities. |
| Clearance Sampling. Air sampling performed at the end of an asbestos abatement project to clear the work area for re-occupancy by the general public. |
| Demolition. The wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility. |
| Disturbance. Activities that disrupt the matrix of ACM/PACM, rendering the ACM/PACM friable, or generate visible debris. |
| Encapsulation. The procedure of coating ACM/PACM or abated substrates to control the possible release of asbestos fibers into ambient air. |
| Enclosure. An airtight, impermeable barrier around ACM/PACM to control airborne release of asbestos fibers into areas outside the barrier. |
| Employee Exposure. The exposure to airborne asbestos fibers that would occur if the employee were not using respiratory protection. |
| Facility Asbestos Abatement Contingency Plan (FAACP). An FAA document that details oversight and response procedures to be followed by facility management, employees, any FAA competent person, and the independent third party CIH during a Class I or I... |
| Fiber. A particulate form of asbestos, 5 micrometers or longer, with a length-to-diameter ratio of at least 3 to 1. |
| Fit Factor. A quantitative estimate of the fit of a particular respirator to a specific individual, and typically estimates the ratio of the concentration of a substance in ambient air outside the respirator to its concentration inside the respirator... |
| Fit test. The use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual. |
| Friable Asbestos Containing Material. Capable of being crumbled, pulverized, or reduced to powder by hand pressure when dry, resulting in a release of airborne fibers. |
| High Efficiency Particulate Air (HEPA) Filter. A filter that is at least 99.97% efficient in removing mono-dispersed particles of 0.3 micrometers in diameter. |
| Industrial Hygienist. A professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop controls for occupational health hazards. |
| Negative Exposure Assessment. A demonstration by the employer, which complies with the criteria in 29 CFR 1926.1101, that employee exposure during an operation is expected to be consistently below the PELs. |
| Operations and Maintenance (O&M) Plan. A subset of the overall Asbestos Control Program, which provides work practices that will maintain ACM/PACM in good condition, ensure proper responses to minor asbestos releases, prevent further releases of asbe... |
This is the start of the file's text. The full file is on GovTribe.