Work Category #1 - Track Resurfacing.pdf
PDF 661 KB Posted
- Attached to
- TRACK RESURFACING
- Solicitation number
- RFP NAP 260000001809 1
- Issued by
- Huron County, Michigan
About this file
This is a Work Category specification document for Bid Package #2 of the Napoleon Community Schools Series 1 Bond Project, issued by R.W. Mercer Co. on August 2nd, 2024. The project involves complete track resurfacing work at Napoleon Community Schools in Michigan, with a required start date of June 1, 2026, and required completion by July 27, 2026. The contractor is responsible for all aspects of track resurfacing, including removal and disposal of existing track surfaces, asphalt paving overlay work, and installation of synthetic track surfacing materials. The project includes two scope options: a base bid utilizing Rekortan M synthetic surfacing (14mm polyurethane-bound layered impermeable running track with embedded EPDM finish in red) and an alternate scope using TrackMaster Pro synthetic surfacing. Additional work includes removal and replacement of fencing for construction access, milling of existing asphalt, application of bond coats and primers, installation of lane lines and event markings in accordance with NFHS/MHSAA regulations, and provision of a five-year manufacturer warranty with the option to extend an additional two years at added cost. Contractors must submit complete submittals and shop drawings within two weeks of contract award and provide ASBA level 4 striping certification.
The contractor is required to provide hourly labor unit pricing for foreman and laborer classifications at straight time and overtime rates for potential contract changes. The specification requires that all track surface installers be authorized by the manufacturer with a minimum of five years' experience installing the specified system, and the supervising installer must have five years' experience and have installed a minimum of ten World Athletics-approved track systems within the last three years. The contractor must be a member of the American Sports Builders Association (ASBA) and procure all material components from a single source manufacturer. Quality assurance testing, including soil density and compaction reports, is the owner's responsibility, though re-testing costs due to non-compliant work shall be borne by the contractor. All contractors must comply with OSHA and MIOSHA safety regulations, pass criminal background checks through I-Chat, and wear required PPE at all times on site. The contractor assumes responsibility for understanding existing site conditions as documented in the included Geotechnical Report and must provide training to facility staff on care and maintenance of the completed track surface.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| tableofcontents.doc | DOC document | |
| 00 11 13 advertisementforbid - Napoelon Use.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Napoleon Community Schools Series 1 Bond Project RW Mercer Project No. 24.0189.04 Bid Package #2 Issued For Bids: August 2nd, 2024
WORK CATEGORY #1 – TRACK RESURFACING
R.W. Mercer Co. 1 Work Category #1 – Track Resurfacing
Work Included:
Complete all Track Resurfacing Work in accordance with the contract documents including Bidding Requirements, Proposal Section, Contract Forms, General Conditions, Supplemental Conditions, General Requirements, Addenda and Specification Divisions & Sections, including but not limited to the following:
General:
1. Each Trade Contractor, where applicable, shall obtain and pay for all permits and fees associated with its work and provide evidence of same to the Construction Manager. The Construction Manager shall apply and secure the building permit.
2. Furnish all hoisting, lifting, scaffolding and handling of all materials required to complete this work.
3. This Contractor shall provide access for all testing and inspections as required per the specifications.
4. Include all layout and controls related to this Work Category unless expressly noted otherwise.
5. Confine operations at the site to areas permitted by the Construction Manager.
6. Timely removal from site and legal disposal of all personal and construction related debris generated by this Work Category
7. Full compliance with all the safety regulations and requirements of OSHA, MIOSHA, State
Authorities, Local Authorities and the Construction Manager. Failure to do so will cause this contractor to be removed from the site.
8. Daily cleanup shall include broom cleaning and removal of identifiable debris and rubbish from site by this Contractor. This Work Category will also actively participate in the cleaning of the interior and exterior of the project on a weekly basis. Cleaning of the project will occur every Friday from 1:00 PM until the end of the workday or as coordinated by the Construction Manager.
Non-participation will result in the Construction Manager employing cleanup labor with the cost being back-charged to those Contractors in non-compliance.
9. This Contractor is responsible for all cutting and patching, including all costs, as necessary for the completion of its work.
10. This Contractor must lay-out its own floor, wall & ceiling penetrations and/or coordinate with Other Contractors prior to the construction of new floor, walls & ceilings being built. Any penetrations in existing assemblies or after new floor, wall or ceiling construction is complete shall be the responsibility of This Contractor.
11. On-site material storage space is limited (no long-term storage on site). Large deliveries and/or long-term storage needs are to be coordinated in advance with the Construction Manager. No materials or equipment will be permitted to be stored on site, uninstalled, more than one (1) month without pre-approval of the Construction Manager. Any costs to remove and return said material or equipment shall be at the expense of the contractor.
12. Include all cost to complete project per the phasing plan and project schedule including multiple mobilizations and close coordination with other trades and construction manager as may be necessary for the completion of this Contractor’s work scope.
13. Notify Construction Manager immediately if items containing lead, asbestos, and other hazardous materials are encountered.
14. Contractor acknowledges that it has read and understands the bidding documents, and that it has visited the site and familiarized itself with the local conditions under which the work is to be performed. The Contractor shall not be allowed any extra compensation by reason of any matter or thing concerning which such Contractor did not fully inform itself prior to bidding.
15. As-builts and close-out documentation for work performed will be submitted per the Contract Documents, plans and specifications.
16. Contractor shall supply a copy of their Safety Plan per specification Section 00-90-00 to the Construction Manager for approval before commencing any activities on site.
R.W. Mercer Co. 2
17. Contractors will be required to have any employees working or visiting the site submit and pass a criminal background check through I-Chat as required by the Contract Documents. Background checks shall be obtained and paid for by the Owner. Background Form is included in the contract documents.
18. Please refer to specification Section 01-50-00, Temporary Controls, for information regarding temporary utilities, facilities, weather protection, etc.
19. Please refer to the supplementary “Job Site Staging and Access Plan” for information pertaining to temporary staging areas, roads, sidewalks, etc.
20. Specific snow removal required for the continuation of the Trade Contractor’s work, i.e., steel framing, roofing, concrete placement, etc., shall be the responsibility of the Trade Contractor performing the work and ensuring the completion dates as established in the Project Milestone Schedule.
21. All Contractors upon entering the site shall be required to wear all proper PPE including but not limited to: Hardhat, safety glasses, and safety footwear. Proper PPE to be worn at all times, no exceptions will be allowed.
22. Contractors shall warrant that all materials and equipment included in the Work will be new, unless otherwise specified, and that such Work will be of good quality, free from improper workmanship and defective materials and in conformance with the Drawings & Specifications.
With Respect to the Work, the Contractor further agrees to correct all Work defective in material and workmanship for a period of two years from the Date of Substantial Completion or for such longer periods of time as may be set forth with respect to specific warranties contained in the trade sections of the Specifications. The Contractor shall collect and deliver to the Construction Manager any specific written warranties given by others.
Scope Outline:
1. Bids shall be based on the attached base bid scope and alternate scope and shall be all inclusive to all items below.
2. This Contractor shall be responsible for all Track Resurfacing as described in Specification Divisions 32-Exterior Improvements, Division Section 32-18-23.39.
3. This is a single contract to complete this scope of work in its entirety including all required removals and restoration work associated with the track resurfacing project.
4. This Work Category shall provide and pay for the services of a registered surveyor, and as approved by the Construction Manager, for all building and utilities layout and grade necessary for the performance of this contract. The Construction Manager shall provide three (3) control points for this Contractor to reference and use for additional layout provided thereafter. No changes in grade or line are allowed without the approval of the Construction Manager or Architect/Engineer.
5. The owner shall provide and pay for all field quality control testing as called for by the specifications. All copies of soil density, compaction and material testing reports shall be reviewed and approved by the Construction Manager. Re-testing or re-inspections that are required due to non-compliant or substandard work shall be at the expense of this Trade Contractor.
6. A Geotechnical Report has been issued as part of the Contract Documents and it is assumed that the Contractor submitting a bid for this work has thoroughly read and is familiar with all aspects of existing soil conditions as contained within this document.
7. Contractor to review base bid and alternate scope of work along with basis of design products. If the bidding contactor would like to propose a substitution, use the documents contained within spec section 00 60 02 Substitution Request Form. The proposed substitution will need to meet or exceed the basis of design.
8. Contractor to provide as-builts and certifications upon completion of this work.
9. Contractor to confirm and provide all required slopes within base bid. If the alternate is selected, the contractor shall advise the owner prior to starting if any existing track slopes are out of specifications.
R.W. Mercer Co. 3
10. If this contractor requires any fencing or other existing equipment to be removed for the completion of this project, this work shall be included in the proposel.
11. If the alternate is accepted and no additional asphalt is installed on the existing track, this contractor shall advise the CM/Owner of any asphalt beneath the existing track surface that is in poor condition and could have an impact on the new surface warranty. Please review Geotechnical Reports included within the specifications for existing conditions.
12. This contractor is responsible for protection of all adjacent facilities
13. This contractor shall provide shop drawings showing all new track markings for approval of layout and color.
14. This contractor to provide training to facility staff on care and maintenance.
THIS PAGE MUST BE ATTACHED TO THE BID PROPOSAL FORM
Unit Pricing:
N/A Labor/Equipment Rates:
1. Provide hourly labor unit pricing (including Contractor’s markup) for the following work classifications that will be used for changes to the Contract, including additions or deletions to scope work:
(a) Foreman $ /HR ST $ /HR OT
(b) Laborer $ /HR ST $ /HR OT
Allowances:
N/A
Alternates:
N/A
Critical Scheduling & Sequencing:
The Trade Contractor shall submit to the Construction Manager, within five (5) days of award of Contract or Letter of Intent, a construction schedule of all activities contained in the Trade Contractor’s scope of work.
This schedule shall include activity descriptions and durations in working days, for shop drawings, fabrication, delivery and installation of products, materials, and equipment, and manpower loading. Construction Manager will compile all Trade Contractor’s schedules and develop a Project Master Completion Schedule.
Once the individual Trade Contractors’ schedules are agreed upon by Construction Manager, this Project Master Construction Schedule will become the project plan for construction.
Complete Submittals & Shop Drawings 2 Weeks after Award Mobilize On-Site To Begin Work Per Times on Scope Doc
Certification of Compliance and Understanding of Work Category/Scope:
This page shall be attached to the bid proposal form at time of submission.
Signed: Date:
BASE BID SCOPE OF WORK
April 13th, 2026
Running track scope of work at Napoleon Community Schools, MI
Asphalt Paving
Overlay Pave Existing Running Track
● Remove and replace section of fencing to allow for construction access
● Remove and properly dispose of the existing track, high jump, and pole vault surface
● Mill existing asphalt surface as needed to allow for proper drainage and smooth transitions
● Clean entire track area
● Apply asphalt bond coat
● Furnish and install 2” limestone asphalt (virgin asphalt mix) surface on track, high jump and pole vault pavement areas
Track surfacing - Rekortan M (color to be black)
● Clean and clear track areas of all loose debris and foreign material
● Tape off areas adjacent to the track and field event areas
● Apply asphalt primer (primer will only be applied to areas being surfaced within a 48 hour period, if an area is not surfaced within this time frame or if the primed area gets substantially wet due to rain, sprinklers, etc. new primer will be applied)
● Install a 10mm polyurethane and SBR rubber basemat to track and field event areas
● Install a 2-component polyurethane seal layer, making the basemat impermeable
● Install a 5mm 2-component polyurethane and EPDM rubber top coat (flood and chip layer)
● Clean and properly dispose of the protection materials used during construction
● Install lane lines and event markings in accordance with NFHS/MHSAA rules and regulations
Notes:
*Bid to include a re-stripe of the lane lines and event markings within the warranty period when requested by owner
*Required start date June 1, 2026
*Required completion by July 27, 2026
*Provide manufacture standard 5-year warranty on workmanship and materials and an added cost for an additional 2 years
*Bid to Include ASBA level 4 striping certification www.rekortan.com | info@rekortan.com Rev 3 GT/JE 02/28/21
SYNTHETIC TRACK SURFACING - REKORTAN® M SPECIFICATION
PART 1- GENERAL
1.01 SUMMARY
A. The contract work to be performed under this section consists of furnishing all required labor, materials, equipment, implements, parts and supplies necessary for the surfacing in accordance with these specifications indicated on the drawings.
1. Rekortan® M – A 14 mm Polyurethane bound layered impermeable running track surface with embedded EPDM finish.
1.02 CODES AND STANDARDS
A. Codes and standards follow the current guidelines set forth by the World Athletics (WA), the National
Collegiate Athletic Association (NCAA) or the National Federation of State High School Associations
(NFHS).
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Request for deviations or substitutions from the specifications must be made in writing seven days prior to the bid date. Complete product data including specifications, application rates, mixing instructions and a sample shall be sent with the request to the district and/or its agent for an evaluation. Alternatives will be allowed only by addendum.
1. Submit a set of the manufacturer’s product data sheets including installation guidelines and maintenance guidelines.
2. Submit a track sample that is representative of the product being installed.
3. Submit Safety Data Sheets (SDS) for all individual components of the surfacing to be installed.
1.04 QUALITY ASSURANCE
A. The track surface installer shall be authorized by Manufacturer and possess a minimum of five (5) years’ experience installing Rekortan® systems.
B. The supervisor of the installing company must have five (5) years’ experience surfacing Rekortan® systems and must have installed a minimum of ten (10) World Athletics approved track systems within the last three (3) years.
C. The manufacturer must offer a minimum of four (4) World Athletics certified track systems.
D. Submit evidence that the synthetic surfacing contractor is a member of the American Sports Builders Associations (ASBA).
E. All material components must be procured from manufacturer, a single source. No substitutes allowed without written approval from manufacturer.
F. All polyurethanes used must be manufactured by an ISO 9001 and ISO 14001 Certified Company. Manufacturer’s ISO 9001 and ISO 14001 certificate must accompany bid.
1.05 SITE CONDITIONS
A. Weather: Surfacing shall not begin if rain is imminent, if gusting winds are occurring or when the threat of freezing exists within 24 hours.
B. Site: During any surfacing and striping, sprinkler systems must be shut off or controlled so that no water falls on the track or event area surfaces. Other trades and school district personnel must stay off the wet or curing surface.
C. Only mix and apply when meeting manufactures recommended guidelines.
D. The General Contractor shall provide temporary barriers as required to prevent public entry to construction area and to protect adjacent properties from damage during construction operation.
1.06 WARRANTY
A. Provide manufacturers standard five (5) year warranty.
PART 2- PRODUCTS
2.01 SUPPLIER
Advanced Polymer Technology 109 Conica Lane / PO Box 160 Harmony, PA 16037 724-452-1330
2.02 MATERIALS
A. Rekortan® M Running Track Surface - A 14 mm Polyurethane bound layered impermeable running track surface with embedded EPDM finish. Its base layer consists of a black mat of SBR rubber granules bound in Qualipur polyurethane. The second layer is a seal coat using Rekortan two-component polyurethane resin. The surface layer is made up of colored EPDM rubber granules cast into a two-component Rekortan polyurethane flood coat.
Materials include:
1. Primer
2. Black Rubber
3. Rekortan® Polyurethane Binder
4. Manufacture approved EPDM Rubber ~ graded to meet specification
5. Two Component Rekortan® Full Pour Polyurethane
6. Manufacture approved EPDM Rubber ~ graded to meet specification
PART 3- EXECUTION
3.01 EXAMINATION
A. The General Contractor shall verify that all asphalt/ concrete paving meets all dimensional accuracy, strength, and compaction. Notify owner of any deficiencies. Recommended compaction of asphalt and sub base is 95%.
B. The General Contractor shall verify that all concrete work meets all required tolerances and notify owner of any deficiencies. No curing compounds are allowed. The manufacturer requires that a proven heavy duty vapor barrier be installed under the concrete slab.
The completed concrete substrate shall meet the industry tolerance standards of levelness ~ 1/8 in 10’, and in addition, it shall meet the RH (Relative Humidity) standard level of dryness of 75% RH or less.
The completed/ cured slab shall be tested and verified to meet standards. If concrete substrate tests over 75% RH, then to protect against vapor drive/ moisture issues, the concrete shall be shot blasted and a moisture mitigation must be applied.
C. Upon completion of paving it is the responsibility of the paving contractor to water flood the surface with the use of a water truck. If after 30 minutes on a 70o F day, “bird bathes” are evident in a depth more than 1/8” the paving contractor, track surfacing contractor and the owner’s representative will determine the best method of correction.
D. Entire surface shall be clean and free of all dirt, oil, grease or any other foreign residue. It is the responsibility of the General Contractor to ensure that the surface is thoroughly clean in all areas of the new and/or existing asphalt or concrete base as necessary to ensure adhesion of the track surface.
E. Minimum curing time for base prior to beginning of surfacing is 14 days for new asphalt paving and 28 days for new concrete. No concrete curing compounds are allowed.
3.02 PRODUCT AND MATERIAL DESCRIPTION
A. Rekortan® M Running Track Surface - A 14 mm Polyurethane bound layered impermeable running track surface with embedded EPDM finish. Its base layer consists of a black mat of SBR rubber granules bond in a Rekortan polyurethane. This layer is then sealed using a two-component Qualipur polyurethane and EPDM powdered rubber. The top layer is made up of colored EPDM rubber granules cast into a Qualipur full pour polyurethane flood coat.
B. Rubber (SBR Black): The basemat rubber shall be specifically graded Styrene Butadiene Rubber
(SBR). SBR is to be dried to no less than 2.5% moisture and sealed in bags.
C. Polyurethane Binder: The basemat shall be bound by a moisture-cured liquid Rekortan® polyurethane, compatible with the basemat rubber. No asphaltic emulsions or epoxies are allowed in the basemat.
The basemat is to be installed with a specially designed track-paving machine to an average depth of 10 mm. No machine sprayed basemat systems will be allowed.
D. Two Component Full Pour Polyurethane: The full pour layer polyurethane and seal layer shall be a two component Rekortan® polyurethane with no solvents or fillers added.
E. EPDM Powder Rubber: The basemat will be sealed off using MELOS or an approved equal powdered rubber mixed with two component Rekortan® full pour polyurethane.
F. Colored Rubber (EPDM Broadcast): Must be Melos EPDM rubber or an approved equal. Unless specified, black rubber is not allowed in the wearing course. Color: Red unless otherwise specified.
conno Highlight
3.03 APPLICATION PROCEDURES
A. The entire surface shall be clean and free of dirt, oil, grease or any other residue upon arrival of the installation team. Any dirt, etc. shall be pressure washed off the base by the general contractor.
B. Prime entire surface area with a compatible Rekortan® polyurethane primer. Mask and protect adjacent structures, as required. Primer shall dry to a tack- free condition, but no longer than 24 hours, before application of the base mat.
C. Mix the binder and rubber granules until all rubber is thoroughly coated transport onto to the track and apply using a paving machine that is specifically designed for this type of application. Apply to the specified thickness.
D. Mix the two component Rekortan® polyurethane resin and EPDM powder into a thixotropic mixture and applied to the basemat by means of spreading the material with a rubber squeegee to seal off the mat.
E. Top Layer: After the seal layer has cured or is tack-free but no longer than 24 hours, Mix the
Rekortan® coating and apply using a notched trowel or squeegee, to achieve an even wet coat.
Broadcast to excess with colored EPDM granules, using a flat shovel or machine spreader ensuring all of the coating is covered.
F. Allow top layer to cure, and reclaim all excess rubber by means of a mechanical sweeper.
3.04 STRIPING
A. All line marking paint shall be compatible and approved for the synthetic surfacing. Only an experienced track striping specialist shall perform the line striping.
END OF SPECIFICATION- REKORTAN® M
ALTERNATE SCOPE OF WORK
April 13th, 2026
RE: Running track scope of work at Napoleon Community Schools, MI
Asphalt Paving
Overlay Pave Existing Running Track
● Remove and replace section of fencing to allow for construction access
● Remove and properly dispose of the existing track, high jump, and pole vault surface
● Mill existing asphalt surface as needed to allow for proper drainage and smooth transitions
● Clean entire track area
● Apply asphalt bond coat
● Furnish and install 2” limestone asphalt (virgin asphalt mix) surface on track, high jump and pole vault pavement areas
Track surfacing - TrackMaster Pro ½” (color to be black)
● Clean and clear track areas of all loose debris and foreign material
● Tape and plastic off areas adjacent to the track and field event areas
● Spray apply tac coat
● Install layers of SBR rubber and liquid latex until a nominal depth of ½” is achieved
● Apply UV stabilizing sheen coat to track and field event areas
● Clean and properly dispose of the protection materials used during construction
● Install lane lines and event markings in accordance with NFHS/MHSAA rules and regulations
Notes:
* Required start date June 1, 2026
*Required completion by July 27, 2026
*Provide manufacture standard 5-year warranty on workmanship and materials and an added cost for an additional 2 years
*Bid to Include ASBA level 4 striping certification
USES
Running tracks, walking paths, and other similar athletic & recreational applications.
COLOR
White, Clear when dry.
SURFACE PREPARATION
Asphalt: New asphalt surfaces must cure a minimum of 14 days, 30 days recommended, prior to application.
Pavement surface must be cleaned entirely and free from dirt, debris, and loose materials. Repair of pavement surface defects, depressions, and cracks should be complete prior to application of coatings.
Concrete: New concrete surfaces must cure 28 days prior to application. Concrete surface should have a medium broom finish, or similar roughened texture. Etch surface with phosphoric or muriatic acid and rinse thoroughly with water, to create an ideal chemical bond. Allow surface to dry completely before application of surface repair products or coatings.
MIXING PROCEDURES
Dilute TrackMaster Pro-Lock 2 parts material to 1 part water & mix well to ensure a complete and homogeneous mixture.
APPLICATION
Apply TrackMaster Pro-Lock by spray method, using a dual diaphragm pumping system (80/30 or 80/40 spray tips and spray wand). Make sure that all of the rubber granules are evenly & completely coated to ensure encapsulation of the rubber layers. The average ratio of TrackMaster Pro-Lock binder to rubber shall be 1 gallon of concentrated/undiluted binder to 18 lbs. of 1 to 4 mm rubber granules.
Black Track: 3/8” thickness or 9.5MM [10.5 lbs/SY Rubber Granules & .60 gals/SY of Pro-Lock] Black Track: 1/2” thickness or 12.5MM [14 lbs/SY Rubber Granules & .75 gals/SY of Pro-Lock] Colored Track: 1/8” minimum thickness or 3.2MM of EPDM colored granules (1-4 mm) & .21 gals/SY of Pro- Lock]
Minimum recommended layers of black rubber and Pro- Lock is 3. If coloring track, minimum number layers of colored EPDM rubber & Pro-Lock is 2.
*SportMaster Black Dispersion or ColorPlus Pigments can be added in the final coat of binder to enhance the deep black or colored appearance of the running track surface, and extend the UV protection of the binder. Up to 5 gallons of Black Dispersion/ColorPlus can be added to 275-gallons of TrackMaster Pro-Lock.
IMPORTANT
Surface and air temperatures must be above 50°F (10°C) during application and for at least 24 hours after application. Stir before using. Do not apply when rain is imminent or forecast. Keep from freezing. Close container when not in use. Avoid leaving containers in full sun during very hot conditions and remove any dried skins that may have formed on the surface in drums or totes before mixing and application.
DRYING TIME
The coating will be milky white when wet and clear when dry. Typically, it takes 5 to 6 hours for drying, depending on the temperature and weather conditions.
CAUTIONS
Do not store in direct sunlight or where temperatures exceed 100°F. Do not apply if rain is imminent or forecast. Keep from freezing. Close container when not in use. Refer to product Safety Data Sheet (SDS) for additional safety information and precautions.
WARRANTY
The statements made on this technical bulletin are believed to be true and accurate, and are intended to provide a guide for approved construction practices.
Manufacturer does not make, nor does it authorize any agent or representative to make any warranty, express or implied, concerning this material as workmanship, weather, construction, equipment utilized and other variables affecting results are all beyond our control.
Manufacturer warrants only that the material conforms to product specifications and any liability to the buyer or user of this product is limited to the replacement value of the product only. In no event shall Manufacturer be liable for any injury, loss or damage, either direct or incidental, special or consequential, however arising, in connection with material or equipment furnished or work performed. Manufacturer shall not, in any manner, be liable for any defects, variations or change in condition in the substructure over which its products are installed.
Copyright© 2019, SportMaster All rights reserved.
ThorWorks Industries, Inc.
P.O. Box 2277 Sandusky, OH 44870
REVISED 12/19