About this file

This is a bidders' conference Q&A document from the Bridgewater-Raynham Regional School District regarding boiler replacements at Williams Intermediate School in Bridgewater, Massachusetts. The project involves the replacement of existing HB Smith boilers, with boiler #4 definitely being replaced and boiler #3 potentially being replaced if budget allows. The district prefers Smith boilers but will consider replacements with prior authorization. A mandatory site walkthrough occurred on November 19, 2025, at 10:00 AM, with bid proposals due December 1, 2025, at 10:00 AM, and bid award scheduled for December 5, 2025. The project completion deadline is December 31, 2025. Attendees included district facilities staff and representatives from multiple contracting companies including Davison Co., Aalanco Service Corp., General Air, Cam HVAC, Guardian, NRG, George T. Wilkinson, Enterprise Equipment, and Finbarr Mechanical.

Key operational details addressed during the walkthrough include that boilers currently run in series at different times as needed, outside loading dock access is through double doors at the back of the boiler room, and dumpster placement is allowed near the loading dock entrance. The district will supply glycol onsite, and the awarded vendor must provide empty totes for used glycol disposal. Electrical panels are located in the room to the left of the boilers, and emergency power-off switches exist in the electrical room. Building access is available any day of the week except December 25, 2025, and January 1, 2026, with weekend access requiring prior approval from the Director of Facilities. Johnson Controls serves as the building management contractor. The sign-in sheet from the walkthrough would be uploaded to Commbuys as an amendment document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The mission of the Bridgewater-Raynham Regional School District is to provide excellence in education for all students in a safe learning environment.

The Bridgewater-Raynham Regional School District does not discriminate on the basis of race, color, sex (including pregnancy and gender identity), sexual orientation, religion, national origin, homelessness or handicap in its educational activities or employment practices.

Telephone: 508-279-2140 www.bridge-rayn.org Fax: 508-697-7012

WIS Boiler Replacements Bid Walk-thru Questions/Answers

Below are questions that were discussed during the bid-walk-thru that took place on 11/19/25 at 10am at the Williams Intermediate School.

In Attendance:

Mark Chiocca, BRRSD Director of Facilities Kristen Geer, BRRSD Facilities Secretary Arthur Jones, BRRSD Head Plumber Gavin Humes, Davison Co.

Jonathan Hollenbeck, Davison Co.

Mike McLaughlin, Aalanco Service Corp.

Damian Finkley, General Air Joe Mellon, Cam HVAC Mike Schmidt, Guardian Chris Battista, NRG Daniel Riley, George T. Wilkinson George Whiting, Guardian Nick Alberti, Enterprise Equip.

Camden Stearns, Finbarr Mech.

Questions/Answers:

1. Will you provide a copy of the sign-in sheet? Yes, it will be uploaded to Commbuys as an Amendment document.

2. Which boilers are the ones being replaced? Definitely the #4 boiler, with #3 being a possibility if budget allows.

3. Where is the outside loading dock access? In the back of the boiler room, through the double doors.

4. What design is the district looking for? Would prefer Smith boilers, but if replacement is recommended, prior-authorization is required.

http://www.bridge-rayn.org/

The mission of the Bridgewater-Raynham Regional School District is to provide excellence in education for all students in a safe learning environment.

The Bridgewater-Raynham Regional School District does not discriminate on the basis of race, color, sex (including pregnancy and gender identity), sexual orientation, religion, national origin, homelessness or handicap in its educational activities or employment practices.

Telephone: 508-279-2140 www.bridge-rayn.org Fax: 508-697-7012

5. How do the boilers currently run? Boilers currently run-on series at different times on what is being called for.

6. Where is dumpster placement allowed? Dumpster placement is allowed out by the loading dock entrance.

7. Where are the electrical panels located? Electrical panels are located in the room to the left of boilers if you were looking at them from the front (where they are numbered).

8. What about drainage & glycol or if glycol is contaminated? We have glycol onsite so there is no need for awarded party to purchase or include in bid proposal.

9. Should awarded vendor provide empty totes and who will refill? Yes, the awarded vendor should provide empty totes for used glycol and is responsible for disposal.

10. Existing EPO switches? Yes, they are located in the electrical room.

11. What is the accessibility to building? Building access is any day of the week but if weekend access is needed, prior approval from the Director of Facilities is required. The only date that there will be no access is 12/25/25 and 1/1/26.

12. Is there a BMC contractor? Yes, Johnson Controls http://www.bridge-rayn.org/