Wilson_Dr_&_Ave_Waterline_Replacement_-_Bid_Set_Plans.pdf
PDF 30 MB Posted
- Attached to
- Wilson Dr & Ave Waterline Replacement
- Solicitation number
- 27-002
- Issued by
- Washington County, Barlow City, Oregon
About this file
Summary of Wilson Dr & Ave Waterline Replacement Project Bid Set Plans
This is a bid set of construction plans prepared by the City of Beaverton for the SW Wilson Drive and Wilson Avenue Waterline Replacement project (CIP 4243). The project involves the installation of approximately 3,400 linear feet of new water main infrastructure comprising 2,700 feet of 8-inch diameter ductile iron pipe (DIP), 500 feet of 6-inch DIP, and 200 feet of 4-inch DIP, along with associated fire hydrants, water service connections, air release valves, and system appurtenances. The project spans from SW Wilson Court to SW Hart Road along SW Wilson Drive and SW Wilson Avenue, with an additional section along SW 139th Avenue in a residential neighborhood. The construction plans include detailed plan and profile sheets, erosion control specifications, survey control data, utility conflict notes, and standard drawings. The project will modernize the water distribution system, improve service reliability, and address a pressure zone transfer affecting 11 properties that will require private pressure reducing valve installation. Key project contacts include Matt Palmer, PE (City of Beaverton Project Manager) and Troy Pierson (Water Operations).
The bid set plans specify that all materials must be new manufacture and domestic, with no rebuilt or foreign-manufactured materials permitted. All mainline pipe shall be push-on cement-lined zinc-coated ductile iron, class 52 with Tyton joints, and all mechanical joints shall conform to ANSI A-21.11 standards. All construction must comply with City of Beaverton standards, Oregon APWA/ODOT specifications, Clean Water Services standards, and Oregon Administrative Rules Chapter 333. The contractor is responsible for utility locating, trench backfill and compaction, erosion prevention and sediment control, traffic control, property protection, and final disinfection and pressure testing of all new waterlines. Water service disruption coordination, pressure testing to a minimum of 150 PSI, and chlorination prior to connection to the existing system are required. The project requires coordination with multiple utility providers including Comcast, Frontier, Verizon, PGE, BPA, Kinder Morgan, and NW Natural, with contractor notification to the City required at least 48 hours prior to construction commencement and 5 working days advance notice of planned water service disruptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wilson_Dr_&_Ave_Waterline_Replacement_(Addendum_#1_Revision).pdf | ||
| Wilson_Dr_&_Ave_Waterline_Replacement.pdf | ||
| LABOR_AND_MATERIAL_PAYMENT_BOND.docx | DOCX document | |
| Locates.docx | DOCX document | |
| Notice_to_Proceed.docx | DOCX document | |
| BLANK_Sole_Source_Justification_Form.pdf | ||
| Laws_to_be_Observed.docx | DOCX document | |
| Construction_Contract_-_Sample.docx | DOCX document | |
| Performance_Bond.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE MAP
CITY OF BEAVERTON
SW Wilson Dr Waterline Replacement
CONTACTS LIST
CoB Project Manager Phone Number
Matt Palmer, PE (971) 806-2536
Troy Pierson, Water Operations (971) 246-0223
Utility Provider Phone Number Comcast - Dispatch (503) 617-1212
Frontier - David Carnley (503) 940-9000
Verizon - Daniel Ruiz (503) 350-3251
PGE - Outage & Emergencies (503) 464-7777 or (800) 544-1795
BPA - Jim Clark (503) 304-5906 (O) or (503) 758-3883 (C)
Kinder Morgan (866) 762-8442
NW Natural (800) 882-3377
CoB Utilities (503) 526-2261
TVWD Water (503) 848-3000
West Slope Water (503) 572-0253
CWS Storm/Sewer (503) 574-8100
ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth in OAR 952-001-0001 through
952-001-0090. You may obtain copies of the rules by calling the center.
NOTE: The telephone number for the Oregon Utility Notification Center is (503) 232-1987.
VICINITY MAP
N.T.S.
Scholls Ferry Rd
Barrows Rd
Tile Flat Rd
5t h Av e
Weir Rd
Brockman St
Allen Blvd
Denney Rd
M ur ra y
Bl vd Hall Blvd
Barnes Rd
Cornell Rd Sunset Hwy
Walker Rd
Jenkins Rd
BH Hwy
Canyon Rd
0t h Av e
Hart Rd
Davis Rd
Nora Rd
Garden Home Rd
Farmington Rd
TV Hwy Ced ar H ills B lvd
Scholls Ferry Rd
Project Site
CIP 4243
Project Area
Sheet List Sheet # Sheet Title G-01 Title Sheet
G-02 General Notes
G-03 Abbreviations & Utility Conflict Notes
Survey Control
SC-01 Survey Control Map
Erosion Control
EC-01 & EC-02 Erosion Control
Water - Keymap
W-01 Water Keymap
W-02 Pressure Zone Transfer Map
W-03 SW Wilson Dr & SW Wilson Ave Connection Details
Water - Plan & Profiles
WPP-01 to WPP-14 SW Wilson Dr/Ave Waterline Plan/Profiles
WPP-15 "A" Sta 0+90 to 2+40 (SW Wilson Ct Cul-de-sac)
WPP-16 "B" Sta 0+90 to 1+50 (SW 142nd Ave Connection)
WPP-17 "C" Sta 0+90 to 1+80 (SW 141st Ave Connection)
WPP-18 "D" Sta 0+90 to 1+60 (SW 140th Ave Connection)
WPP-19 "E" Sta 0+80 to 2+80 (SW Danielle Ave Connection)
WPP-20 "E" Sta 2+80 to 4+80 (SW 139th Ave Connection)
WPP-21 "F" Sta 0+90 to 1+90 (SW Wilson Ave Cul-de-sac)
WPP-22 "G" Sta 0+90 to 1+70 (SW 32nd St Connection)
Standard Drawings
DT-01 to DT-09 CoB Standard Drawings
DT-10 CWS Standard Drawings
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/20/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-GENERAL.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
DesignedAppv'd
G-01
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
Ti tle
S he et
MPMP
ENGINEER
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A L MER
84675
12/31/
RE
G ISTERED PROFESS IONA L
BID
S
ET
General Construction Notes:
1. The contractor shall notify the city inspector at least 48 hours (two full working days) prior to beginning the project. Connections between existing infrastructure and new work shall not be made until necessary inspections and tests have been completed on the new work and it is found to conform in all respects to the requirements of the plans and specifications.
2. Contractor shall verify location and depth of all existing utilities where facilities cross. Contractor shall pot hole existing utilities 200 feet ahead of laying pipe at all crossings. If conflicts arise, the contractor shall notify the owner's representative prior to construction. Utility locate One Call # 1-800-332-2344
3. All construction is to be performed in accordance with the most recent version of city of beaverton standards, oregon apwa/odot standard specifications, clean water services (cws) standards (including erosion prevention and sediment control) and the oregon administration rules (oar), chapter 333, unless noted on the plans or specified otherwise.
4. All existing utilities disturbed by contractor shall be repaired immediately and the respective utility company notified of the disturbance without delay.
5. Contractor shall submit "as-built" information to the owner's representative upon completion of construction.
6. The contractor shall not damage or cut existing asbestos cement pipe. Excavate and expose existing asbestos cement pipe until appropriate joints are exposed. Disconnect the asbestos cement pipe joint and remove the appropriate sections of asbestos cement pipe without cutting or damaging them. Dispose of removed asbestos cement pipe in a legal manner and in conformance with the requirements of authorities controlling air pollution and solid waste disposal. Contractor shall comply with applicable requirements of ORS 468a.700 through 468a.760.
7. Final locations of all valves and valve boxes, fire hydrants, air release assemblies, service connection corporation stops, driveway aprons, sewer laterals, permanent signs, and catch basins shall be field located. The contractor shall coordinate final locations of the described items with the owner's representative.
8. Utility construction sequencing will be required in order to prevent conflicts with existing utilities remaining in service until newly installed utilities are connected and in service. Contractor shall sequence utility work including temporary connections and bypasses as required such as to minimize disruption of services. See section 105.4.01 of the specifications regarding construction sequencing requirements for this project.
9. Maintenance of the work area and approach roads is the responsibility of the contractor. The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards.
10. Any change in construction after plan approval must be submitted in writing and approved by the city prior to change.
11. At the end of each workday all trenches shall be backfilled and all trenches within streets shall be temporary paved or covered to the satisfaction of the owner's representative. Steel sheet placements shall be limited to 36 hours in any one location. Beyond 36 hours, excavations shall be paved. Asphalt pavement, either temporary or permanent, shall be hot mix bituminous asphalt. No trench, on-site or off-site, shall be left at any time in an unsafe condition. The contractor is responsible for and is liable for hazards or damage resulting from the prosecution of the work.
12. Effective erosion prevention & sediment control, dust control, and drainage control is required at all times. The contractor is solely responsible for protection of all work, adjacent properties and downstream facilities from erosion and siltation during the course of the work. Any damage resulting from such erosion and siltation shall be corrected at the sole expense of the contractor.
13. The contractor shall maintain access to all driveways. If a driveway must be blocked, the contractor shall give the homeowner, apartment manager and/or building owner 24 hours notice and shall ensure access to driveways at the end of each workday.
14. The contractor shall exercise all due care in protecting property along the route of the improvements. This protection shall include, but not be limited to, trees, yards, fences, drainage lines, mail boxes, driveways, shrubs, lawns, irrigation systems, within any rights-of-ways and easements. If any of the above have been disturbed, they shall be restored as necessary to as near their original condition as possible or replaced in kind.
15. All survey monuments shall be located and protected, except as specifically directed by the city engineer.
16. The contractor shall perform all the work shown on the drawings and all incidental work considered necessary to complete the project in an acceptable manner.
17. The contractor and/or sub-contractor shall have a minimum of one set of city approved construction plans on the job site at all times during each construction phase while work is being performed.
18. All material suppliers shall submit to the engineer proof of material(s) tested in accordance with specifications. By acceptance of the contract with the owner/developer, the contractor certifies that all materials delivered to the job site will meet or exceed those specifications. Any material not conforming shall be removed from the site at no additional cost to the owner.
19. Upon completion of the work, the contractor shall leave the project area free of debris and unused materials.
Waterline Construction Notes:
1. Contractor shall inform owner and owner's representative 5 working days in advance of construction and/or planned disruption of water service. Contractor shall not assume shutdown times, but will rather schedule and coordinate shutdowns with affected utilities.
2. Owner will provide notification to affected water users for planned service disruptions.
3. Owner will provide surveying as required for new waterline construction.
4. Operation of existing valves shall only be performed by city staff.
5. Existing water mains & services shall be kept in operation until new mains are connected & in service.
6. Contractor shall provide temporary thrust blocking where required on those fittings which will see service pressure before concrete thrust block develops full strength.
7. Contractor shall place 8-mil plastic sheeting between thrust block and pipe fittings.
8. All valves shall include valve boxes and lids as outlined in the technical specifications and drawings.
9. All materials and workmanship shall comply with AWWA, city of Beaverton, and the uniform plumbing code as applicable. All materials shall be of new manufacture and must be domestic. No rebuilt or used materials will be allowed. All materials shall have documentation providing evidence that the materials used in this construction were manufactured in the United States. No foreign manufactured materials will be allowed.
10. All mainline pipes shall be push-on cement-lined zinc coated ductile iron, class #52 with Tyton joints. All mechanical joints shall conform to ANSI A-21.11.
11. Fire hydrant assemblies shall conform to the city of Beaverton’s accepted brands and models.
12. Fire hydrants shall be located to allow a minimum of 36" clear space surrounding all portions of the hydrant. There shall also be no obstructions directly in line with any of the ports of the hydrant for a distance of 5 feet.
13. All backfill in the right of way or other traffic areas shall be ¾"-0" compacted crushed rock, compacted to 95 percent of maximum density as obtained by AASHTO T-99 compaction test.
14. Contractor shall furnish and install water services, 1" (or 2") short (or long) side as specified service in accordance with cob standard detail 660-3 (or 660-5). Contractor shall provide new piping, and all fittings/parts to facilitate new water service installation, according to the standard detail.
15. Upon acceptance of the mains and services, the contractor shall coordinate final service connections with city water department. City water department will install the new meter. A private plumbing permit is required for all work on the customer side of new water meter (backside), at contractor's expense.
16. The contractor shall provide, install, and adjust the new water meter box to final line and grade.
Remove and dispose of the old meter box and other excess materials. Complete landscaping restoration, curb replacement and sidewalk as required.
17. Prior to tie-in, the contractor shall install temporary blow-off assemblies for pressure testing and chlorination. All new water mains shall be pressure tested and disinfected before connection to the existing system and before any service connections are made. Provide 1" temporary taps for the chlorination injection as required. Plug temporary taps with brass plug upon acceptance of new waterline.
18. Upon completion of installation of the water system, all lines shall be flushed and disinfected in conformance with Oregon health division guidelines and the requirements of the Oregon Department Of Environmental Quality. Waterlines shall be pressure tested following completion.
The minimum test pressure shall be 150 PSI. For lines working with operation pressures greater than 100 PSI, the minimum test pressure shall be one and one-half times the design operation pressure. Allowable leakage is 0 PSI.
19. The contractor shall dispose of the super chlorinated water in an approved manner. Do not allow disinfection water to flow into a waterway without adequate dilution or other satisfactory methods of reducing chlorine residuals to a safe level as mandated by DEQ.
20. There may be short sections of the pipeline that connect to the existing system that are difficult to chlorinate. The owner's representative and the contractor shall identify these short sections of pipeline and an alternative method of disinfection employed. Application of 300mn/l chlorine solution shall be applied by soaking in container approved by owner's representative. The chlorine solution shall remain for three hours before flushing. All swabbing and soaking activities to be done with city water representative present.
21. Contractor shall protect water pipe ends from contaminated water and debris at all times.
Contractor shall cap and/or cover pipe ends at the end of each workday.
22. See Sheet G-03 for notes pertaining to utility conflicts with waterlines.
Traffic Control Notes
1. Traffic control to be performed in accordance with the Manual for Uniform Traffic Control Devices and Oregon amendments as required. The City can require additional traffic control measures as needed to provide for public safety.
2. On residential local streets, the contractor shall be responsible to provide all required traffic control when work is being done in the right of way.
3. All traffic control measures need to be submitted to the City of Beaverton for review at least 5 (five working days prior to construction. All street closures shall be approved by the city traffic engineer, at least 5 (five) working days in advance.
4. Upon approval, the contractor shall notify the Beaverton police department, Tualatin Valley Fire and Rescue and the Beaverton School District transportation office at least 48 hours in advance of any street closure.
5. Traffic control plans shall comply with the Oregon Department of Transportation - "short term traffic control handbook". Traffic control devices shall comply with the "manual on uniform traffic control devices" prepared by the federal highway administration, latest revision. Contractor shall comply with all conditions specified in road permits issued for this project.
6. Contractor shall coordinate all street and sidewalk closures with the City. Contractor shall supply signing and barricades as required to assure automotive and pedestrian safety.
Erosion Prevention & Sediment Control Notes
1. Approval of this Erosion Prevention & Sedimentation Control (ESC) plan does not constitute approval of permanent road or drainage design (e.g. size and location of roads, pipes, restrictors, channels, retention facilities, utilities, etc.).
2. The implementation of these ESC plans and the construction, maintenance, replacement, and upgrading of these ESC facilities is the responsibility of the applicant/contractor until all construction is completed and approved and vegetation/landscaping is established.
3. The ESC facilities shown on this plan must be constructed in conjunction with all clearing and grading activities, and in such a manner as to ensure that sediment laden water does not enter the drainage system or violate applicable water standards.
4. The ESC facilities shown on this plan are the minimum requirements for anticipated site conditions.
During the construction period, these esc facilities shall be upgraded as needed for unexpected storm events and to ensure that sediment-laden water does not leave the site.
5. The ESC facilities shall be inspected daily by the applicant/contractor and maintained as necessary to ensure their continued functioning.
6. The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a month or within the 24 hours following a storm event.
7. At no time shall more than one foot of sediment be allowed to accumulate within a trapped catch basin. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning operation shall not flush sediment laden water into the downstream system.
8. Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration of the project. Additional measures may be required to ensure that all paved areas are kept clean for the duration of the project.
G-02
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
G en er al
N ot es
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/13/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-GENERAL.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A L MER
84675
12/31/
RE
G IST ERED PROFESSIONA L
BID
G-03
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
A bb re vi at io ns
U til ity C on fli ct N ot es
Utility Conflicts with Water Lines:
1. In situations involving water lines running parallel to a sewer main or lateral, separation between the two shall be as follows:
Zone 1: parallel water lines permitted. Crossing restrictions only.
Zone 2: not allowed, unless approved by OHA and City Engineer.
Zone 3: parallel water lines prohibited.
Zone 4: parallel water lines prohibited.
2. In situations involving water lines crossing a sewer main or lateral, separation shall be as follows:
2.a. Whenever possible, the bottom of water lines shall be 18 inches or more above the top of sewer mains and laterals with one full length of pipe centered at the crossing.
2.b. Where water lines cross over sewer mains or laterals with clearance of less than 18 inches: center one full length of water pipe at the crossing and the sewer line shall be replaced with a full length of pipe (min. 18 feet) centered at the crossing point with C900, HDPE SDR 17, or class 52 ductile iron pipe.
2.c. Where water lines cross under sewer mains or laterals: follow requirements as described in 2.b. Backfill shall be 100 PSI controlled low-strength material (CLSM).
3. Refer to OAR 333-061-0050(9) for full notes on water line crossing requirements.
4. Gas lines: for situations where water lines or services cross gas lines within 6 inches vertical separation, install fiberglass sheathing material provided by NW Natural, or a half section of PVC pipe. Protective material shall be placed between the gas and water lines and extend 18 inches horizontally on each side of the gas line.
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/13/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-GENERAL.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
ABAN Abandon
ABND Abandoned
AC Asbestos Cement, Asphaltic Concrete
AD Algebraic Difference
ADA Americans with Disabilities Act
ADD'L Additional
APPROX Approximately
APPVD Approved
APWA American Public Works Association
ARV Air Release Valve
ASSY Assembly
AUX Auxiliary
AVE Avenue
AVG Average
AWG American Wire Gage
AWWA American Water Works Association
BC Begin Curve
BCR Begin Curve Return
BF Blind Flange
BFV Butterfly Valve
BLDG Building
BLVD Boulevard
BO Blow Off
BVCE Begin Vertical Curve Elevation
BVCS Begin Vertical Curve Station
C/L Centerline
CARV Combination Air & Vacuum Release Valve
COB City of Beaverton
COMM Communications
COT City of Tigard
CB Catch Basin
CF Cubic Feet
CFS Cubic Feer per Second
CIP Cast Iron Pipe
CL Class
CLSM Controlled Low Strength Material
CMP Corrugated Metal Pipe
CO Cleanout
CONC Concrete
CPLG Coupling
CTR Center
CU Copper, Cubic
CULV Culvert
CWS Clean Water Services
CY Cubic Yard
DEFL Deflect
DTL Detail
DIA Diameter
DIP Ductile Iron Pipe
EA Each
ECC Eccentric
EG Existing Grade, Existing Ground
ESMT Easement
EVCE End Vertical Curve Elevation
EVCS End Vertical Curve Station
EL, ELEV Elevation
ELL Elbow
EMBED Embedded
EOP Edge of Pavement
EQ Equal
EQUIP Equipment
EX, EXTG Existing
FF Finished Floor
FG Finish Grade
FH Fire Hydrant
FITG Fitting
FLEX Flexible
FLG Flange
FLR Floor
FL Flow Line
FO Fiber Optic
FPS Feet per Second
FPT Female Pipe Thread
FT Foot, Feet
G Gas
GAL Gallon
GALV Galvanized
GB Grade Break
GRND Grade
GPM Gallons Per Minute
GV, RSGV Gate Valve, Resilient Seated
HDPE High Density Polyethylene
HORIZ Horizontal
HYD Hydrant
HWY Highway
ID Inside Diameter
IE Invert Elevation
IN Inch
INV Invert
IP Iron Pipe
IR Iron Rod
IRR Irrigation
JB Junction Box
JT Joint
K Rate of Curvature
LAT Lateral
LF Lineal Feet
LT Left
LVC Length of Vertical Curve
MAX Maximum
MATL Material
MFR Manufacturer
MGD Million Gallons per Day
MH Manhole
MIN Minimum
MJ Mechanical Joint
MUTCD Manual on Uniform Traffic Control Devices
N North
NA, N/A Not Applicable
NIC Not In Contract
NPT National Pipe Thread
OC On Center
OD Outside Diameter
OH Overhead
P Power
PSF Pounds Per Square Foot
PL, P/L Property Line
PRV Pressure Reducing Valve
PSI Pounds per Square Inch
PT Point
PVI Point of Vertical Intersection
PVC Polyvinyl Chloride
PVMT Pavement
PWR Power
ROW, R/W Right of Way
RCP Reinforced Concrete Pipe
RDCR Reducer
REQ'D Required
RESTR Restrained
RIM Rim Elevation
RSGV Resilient Seated Gate Valve
RT Right
S, SAN Sanitary Sewer
SCH Schedule
SD, STM Storm
SLV Sleeve
SPEC Specifications
SS Sanitary Sewer, Sampling Station
STA Station
STD Standard
STL Steel
SVC Service
S/W Sidewalk
SY Square Yard
TB Thrust Block
TBA To Be Abandoned
TBC Top Back Curb
TBD To Be Determined
TFC Top Face Curb
T, TEL Telephone
TEMP Temporary
THRD Threaded(Ed)
TL Taxlot
TOP Top of Pipe
TVWD Tualatin Valley Water District
TYP Typical
UGD Underground
UNK Unknown
VERT Vertical
VIF Verify in Field
VLV Valve
W, WAT Water
Zone 3 Zone 2
Zone 4
5'
1'
Zone 1
10'
Existing sewer main or lateral
Zone 2
ENGINEER
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A L MER
84675
12/31/
RE
G IST ERED PROFESSIONA L
BID
CheckedDrawn
PLOT DATE: 7/13/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-GENERAL.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
SC-01
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
Su rv ey C on tr ol M ap
424301
424302
424303 424304
424305
424306
424307
424300
424308
424309
424310
SW Wilson Dr
SW
W ilson Ave
SW
W ils on
A ve
SW
W ils on
D r
SW Hart Rd
SW Kimberly Dr
SW
141st Ave
SW
140th Ave
SW
D anielle Ave
SW
139th Ave
SW
142nd Ave
SW
M ur ra y Bl vd
Survey Control Point Table Point # Northing Easting Elevation Raw Description
424300 150856.71 310485.91 308.68' 1 2" Iron Rod with red plastic cap inscribed "BEAVERTON CONTROL"
424301 150876.26 308961.96 276.37' Mag Nail
424302 150772.93 309208.78 287.57' Brass Plug inscribed "CITY CONTROL"
424303 150807.45 309366.03 294.39' Brass Plug inscribed "CITY CONTROL"
424304 150814.96 309628.44 308.06' Brass Plug inscribed "CITY CONTROL"
424305 150789.06 309862.13 307.26' Brass Plug inscribed "CITY CONTROL"
424306 150832.91 310071.38 307.21' Brass Plug inscribed "CITY CONTROL"
424307 150793.70 310296.04 306.16' Brass Plug inscribed "CITY CONTROL"
424308 150843.69 310496.70 309.31' Mag Nail
424309 151119.51 310619.91 302.04' Brass Plug inscribed "CITY CONTROL"
424310 151402.20 310605.22 288.61' Brass Plug inscribed "CITY CONTROL"
424311 151726.61 310342.56 277.32' Brass Plug inscribed "CITY CONTROL"
424311
1. The basis of bearings and coordinates of this survey is the Oregon Coordinate Reference System, Portland Zone (OCRS-PDX). Coordinates are expressed in units of International Feet. (1 Int'l Foot = 0.3048 meters exactly). The average Combined Scale Factor for the project area is 0.99999097 (1:111,000) and the convergence angle is -0°03'01".
2. Elevations are NGVD29(47) datum, which is also locally known as the Washington County Datum. City of Beaverton benchmark "ASR5" (Elev 358.27') was held for elevation.
3. Control has been referenced to the NAD83(2011) datum using the City of Beaverton horizontal control network. Station "ASR5" was held.
4. Redundant GNSS observations were made on multiple monuments. Said monuments were then traversed through by Leica TS16 total station and the combined data was adjusted using StarNet least squares adjustment software.
5. The GEOID18 model was applied to the measurements to determine NAVD88 elevations.
An offset of -3.514 ft was applied to the NAVD88 elevations to arrive at NGVD29 elevations.
6. Utilities are shown as marked per One-Call Locate Center Ticket No.s 25231449, 25260578, 25262096, 25332108, 25332126, and 25332141 City of Beaverton as-built documents and GIS mapping, and field ties of exposed utility features.
7. This survey was performed between September & October of 2025.
ORS 92.044
This design complies with ORS 92.044(7) in that no utility infrastructure is designed to be located within one foot of a survey monument location shown on a subdivision or partition plat. No design modification or final field location change shall be permitted if it would cause any utility infrastructure to be placed within a prohibited area.
Surveyor's Notes:
REGISTERED
PROFESSIONAL
LAND SURVEYOR
OREGON
JULY 14, 1998
MARK J. MAYER
02887
EXPIRES 12/31/BID
CheckedDrawn
PLOT DATE: 7/20/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-EROSIONCONTROL.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G IST ERED PROFESS IONA L
EC-01
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
Er os io n
C on tr ol
P la n
- W es t
SCALE
0 15075
SW Wilson Dr
SW
W ils on
D r
SW Hart Rd
SW Kimberly Dr
SW
141st Ave
SW
142nd Ave
SW
M ur ra y Bl vd
SW Hargis Rd
SW
nd C t
LEGEND
Protect storm inlet per CWS Drawings 915 & 920, sheet DT-10
Direction of flow
Erosion Control Notes
1. The Erosion Prevention and Sediment Control measures shown on this plan are the minimum required. The contractor is responsible for installing any additional measures necessary to prevent sediment discharge or protect downstream areas. All such additional measures shall be considered incidental to the Erosion Control bid item per 00280.
M
AT
C H
LI
N
E Se e Sh ee t E
C -0
BID
CheckedDrawn
PLOT DATE: 7/20/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-EROSIONCONTROL.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
GISTERED PROFESS IONA L
EC-02
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
Er os io n
C on tr ol
P la n
- E as t
0 15075
SW W
ilso n Ave
SW Hart Rd
SW
141st Ave
SW
140th Ave
SW
D anielle Ave
SW
139th Ave
SW Hargis Rd
SW 33rd Pl
SW 32nd St
SW 31st Ct
LEGEND
Protect storm inlet per CWS Drawings 915 & 920, sheet DT-10
Direction of flow
Erosion Control Notes
1. The Erosion Prevention and Sediment Control measures shown on this plan are the minimum required. The contractor is responsible for installing any additional measures necessary to prevent sediment discharge or protect downstream areas. All such additional measures shall be considered incidental to the Erosion Control bid item per 00280.
M
AT
C H
LI
N
E Se e Sh ee t E
C -0
BID
C O M
CO
M
COM
C O M
COM
COMCOM
COMCOM
CO
M
COMCOM
CO
M
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/13/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G ISTERED PROFESS IONA L
W-01
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
W at er K ey m
0 200100
WPP-01
WPP-21
SW Wilson Dr
SW
W ilson Ave
SW Wilson Ave
SW
W ils on
D r
SW Hart Rd
SW Kimberly Dr
SW
141st Ave
SW
140th Ave
SW
D anielle Ave
SW
139th Ave
SW
142nd Ave
SW
M ur ra y Bl vd
WPP-02
WPP-03 WPP-04 WPP-05
WPP-06 WPP-07 WPP-08 WPP-09
W
PP
-1
W
PP
-1
W
PP-12
W
PP-13
W
PP-14
W
PP
-1
W
PP-19
W
PP-20
WPP-22
WPP-16
WPP-17 WPP-18
SW Hargis Rd
BID
C O M
CO
M
COM
C O M
COM
COMCOM
COMCOM
CO
M
COMCOM
CO
M
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/13/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G IST ERED PROFESS IONA L
W-02
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
Pr es su re
Z on e Tr an sf er M
0 200100
SW Wilson Dr SW Wilson Ave
SW
W ils on
D r
SW Hart Rd
SW Kimberly Dr
SW
141st Ave
SW
140th Ave
SW
D anielle Ave
SW
139th Ave
SW
142nd Ave
SW
M ur ra y Bl vd
Pressure zone change Transfer from 410 to 550 (11 properties require private PRV installation)
410 Pressure Zone
550 Pressure Zone
SW
W ilson Ave
SW Hargis Rd
BID
/ / / / / / / / / / / /WTR WTR
W
COM
COM
COMCOM
S
TM
S A N
S A N
SAN SAN SAN
A1 +0
WTRWTR
WTR
COMCOMCOMCOM
26+00
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/13/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A L MER
84675
12/31/
RE
GIST ERED PROFESS IONA L
Water Keynotes
1 Sta 1+00 Connect to existing 8" zone break RSGV (CoB GIS: convert valve to NO system valve)
W-03
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
SW
W ils on
D r &
S W
W ils on A ve C on ne ct io n D et ai ls
0 2010
2 Sta 1+03 - Install:
(1) 8" 45° bend, MJ
7 Sta 1+23 - Install :
(1) 8"x4" DI tee, MJ
(1) 4" RSGV, MJ
See sheet WPP-15 for SW Wilson Ct alignment & profile.
4 Sta 1+17 - Install :
(1) 8"x6" DI tee, MJ
(1) 6" RSGV, MJ
2 7
6 Sta 1+20 - Install:
(1) 8" RSGV, MJ (new 410/550 zone break valve)
5 Sta 1+17, 11.9' L - Install:
(1) Hydrant Assembly
6' M in
4" D
I W at er
3 Sta 1+13 - Install:
(1) 8" 45° bend, MJ
SCALE: 1" = 5 ft
SW Wilson Dr ConnectionEP-1
WPP-01
SCALE: 1" = 5 ft
SW Wilson Ave ConnectionEP-2
WPP-01
9 Sta 25+71 - Install :
(1) 8"x6" DI tee, MJ
(1) 6" RSGV, MJ (W)
(1) 8" RSGV, MJ (S)
10 Sta 25+80 - Install :
(1) 8x6" DI tee, MJ
(1) 8" Plug
14 Sta 25+99 - Install :
(1) Straddle block, see Standard Drawing 630-8
11 Sta 25+91 - Install :
(1) 6" 45° bend, MJ
13 Sta 25+96 - Install :
(1) 6" long sleeve, MJ
15 Sta 25+90, Offset 2.3'R - Install :
(1) 6" DI cap, MJ
16 Sta 25+69:
(1) 8" RSGV, MJ (new 410/550 zone break valve)
4'
8" DI Water
8" DI Water
Ex 6" CI Water (TBA)
Ex 6" CI Water
8 Sta 1+08, Offset 1.7' L - Install :
(1) 8" DI cap, MJ
8" DI Water
Ex 8" CI Water (TBA)
8" DI Water
12 Sta 25+94 - Install :
(1) 6" 45° bend, MJ
BID
Wilson Rd Waterline - Sta 0+80 to 2+80 Scale: 1" = 20' Vert: 1" = 5'
0+80 1+00 2+00 2+80
8" XSS
St a:
+0
1.
El ev
: 2
.7
- V
IF
Ex H yd ra nt (T
BA
St a:
+5
D ep th
U nk
VI
F
Ex
" W at er (T
BA
St a:
+6
D ep th
U nk
VI
F
Ex
" W at er (T
BA
" S to rm
St a:
1+
To P:
9.
St a:
+0
0.
El ev
: 2
.8
- V
IF
Ex Z on e
Br ea k Va lv e
8" XSS
St a:
+9
D ep th
U nk
VI
F
W at er S er vi ce
St a:
+8
D ep th
U nk
VI
F
Ex C om m s
I.E . o ut : 2
.8
(8
" N W
I.E . i n:
.0
(8
" S E)
I.E . i n:
.0
(8
" S W
St a:
+3
0.
R im
: 2
.5
SS
M
H
STM
SAN SAN SAN SAN
W
TR
G
AS
PWR
PWRPWR
PWR
PW
R
PWR
WTR
WTR
WTR
GAS
GAS
GAS GAS
GAS
W
W W
W
W
W M
W M
W
W M
COM
COMCOM
COMCOMCOMCOMCOM
COM
C O
M
CO
M
COM
COMCOM
COM
1+50
2+00 2+50
STM
STM
S A N
SAN
A1 +0
W M
W M
W M
8" DI Water8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A L MER
84675
12/31/
RE
GIST ERED PROFESS IONA L
Water Keynotes
1 Sta 1+00 Connect to existing 8" zone break RSGV (CoB GIS: convert valve to NO system valve)
WPP-01
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
0+ to
+8
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
2 Sta 1+03 - Install:
(1) 8" 45° bend, MJ
7 Sta 1+23 - Install :
(1) 8"x4" DI tee, MJ, ±3.8 depth
(1) 4" RSGV, MJ (S)
See sheet WPP-15 for SW Wilson Ct Alignment & Profile
4 Sta 1+17 - Install :
(1) 8"x6" DI tee, MJ, ±3.6' depth
(1) 6" RSGV, MJ (N)
11 Sta 1+93±, 6' L - Install :
(2) 1" Water Service connection
• 14295 SW Wilson Ct
• 14275 SW Wilson Ct
12 Sta 2+76, 26' R- Install :
(1) 1" Water Service connection
• 14310 SW Wilson Ct
4 7
6 Sta 1+20 - Install:
(1) 8" RSGV, MJ (new 410/550 zone break valve)
5 Sta 1+17, 11.9' L - Install:
(1) Hydrant Assembly
4'
3.
5'
M in
6' M in
4" D
I W at er
Existing Ground @ pipe CL
36" cover min, typ
3 Sta 1+13 - Install:
(1) 8" 45° bend, MJ
9 Sta 1+60 - Install:
(1) 8" 45° bend, MJ
10 Sta 1+68- Install:
(1) 8" 45° bend, MJ
6" m in
EP-1
W-03
14325 14295 14275
14310
SW Wilson Dr
SW
W ils on
C t
8" DI Water
General Keynotes
2 Replace curb & gutter, see CoB Standard Drawing
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8 Sta 1+08, Offset 1.7' L - Install :
(1) 8" DI cap, MJ
BID
Wilson Rd Waterline - Sta 2+80 to 4+80
2+80 3+00 4+00 4+80
St a:
+8
D ep th
U nk
VI
F
Ex G as
St a:
+1
D ep th
U nk
VI
F
Ex G as
St a:
+2
D ep th
U nk
VI
F
Ex G as
St a:
+1
D ep th
U nk
VI
F
W at er S er vi ce
" S to rm
St a:
3+
To P:
6.
I.E . o ut : 2
.2
(8
" N W
I.E
. i n:
.4
(8 " E
St a:
+0
7.
R im
: 2
.5
SS
M
H
8" XSS
SAN
G
AS
PWR
PWR
PWR
G A S
G
AS
PWR
PWR
PWR
PWR
WTR
WTR
WTR
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
W M
W M W
M
W M
W M
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
3+00 3+50 4+00
4+50
STM
STM
STM
STM
STM
STM
SAN
SAN
SAN
SAN
SAN
S A N
W M
W M
W M
W M
W M
8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G IST ERED PROFESS IONA L
Water Keynotes
WPP-02
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
2+ to
+8
M
AT
CH
LI
NE
Se e Sh ee t W
PP
-0
M
ATC
H
LIN
E
See Sheet W
PP-03
3 Sta 3+51, 30' R - Install :
(1) 1" Water Service connection
• 14270 SW Wilson Ct
1 Sta 2+90 - Install:
(1) 8" 22.5° bend, MJ
2 Sta 4+01 - Install:
(1) 8" 11.25° bend, MJ
4 Sta 4+11±, 10' L - Install :
(2) 1" Water Service connection
• 14255 SW Wilson Ct
• 14225 SW Wilson Ct
5 Sta 4+35±, 25' R - Install :
(2) 1" Water Service connection
• 14250 SW Wilson Ct
• 14220 SW Wilson Ct
1 3 2
4' M in
4'
6' M in
Existing Ground @ pipe CL 36" cover min, typ
SW Wilson Dr
14275 14255
14325 14250 14220
14225
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
BID
St a:
+9
D ep th
U nk
VI
F
W at er S er vi ce
St a:
+6
D ep th
U nk
VI
F
W at er S er vi ce
I.E . o ut : 2
.5
(8
" W
I.E . i n:
.7
(8
" E
I.E . i n:
.7
(8
" S
St a:
+6
0.
R im
: 2
.3
SS
M
H
I.E . o ut : 2
.3
(1
2" W
I.E . i n:
.5
(1
2" S
I.E
. i n:
.5
(1 2"
E
St a:
+4
7.
R im
: 2
.9
SW
G
M
8" XSS
Wilson Rd Waterline - Sta 4+80 to 6+80 Scale: 1" = 20' Vert: 1" = 5'
4+80 5+00 6+00 6+80
W
TR
PWRPWRPWRPWRPWRPWR
PWR PWR
PWR PWR
PWR PWR PWR PWR
WTR WTR
WTR
GAS GAS GAS GAS GAS GAS GAS
W M
W W
W
W
W M
COMCOMCOMCOMCOMCOMCOM
C O
M
COMCOMCOM
COM
COMCOMCOM
5+00 5+50 6+00 6+50
STM STM
S
TM
STM STM STM STM
SAN SAN SAN SAN SAN
S A N
W M
W M
B1 +0
B1
+5
8" DI Water
8" D
I W at er
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
GISTERED PROFESS IONA L
Water Keynotes
WPP-03
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
4+ to
+8
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
4 2 Sta 5+00, 10' L - Install :
(1) 1" Water Service connection
• 14175 SW Wilson Ct
3 Sta 6+64, 10' L - Install :
(1) 1" Water Service connection
• 14155 SW Wilson Ct
1 Sta 5+73- Install :
(1) 8" DI tee, MJ, 3.0' depth
(2) 8" RSGV, MJ (W, S)
See Sheet WPP-16 for SW 142nd Ave connection1
2 3
Existing Ground @ pipe CL 36" cover min, typ
4' 9'
(6 ' m in
SW Wilson Dr
SW
nd
A ve
14220
14225 14175 14155 14125
14150
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
2 2
BID
Wilson Rd Waterline - Sta 6+80 to 8+80
6+80 7+00 8+00 8+80
I.E . o ut : 2
.9
(1
2" W
I.E . i n:
.4
(1
2" N
I.E
. i n:
.2
(1 2"
E
St a:
+8
6.
R im
: 3
.0
SW
M
H
I.E . o ut : 3
.4
(8
" E
St a:
+4
7.
R im
: 3
.2
SS
C
O
St a:
+8
D ep th
U nk
VI
F
Ex G as
St a:
+8
D ep th
U nk
VI
F
Ex G as
St a:
+1
D ep th
U nk
VI
F
Ex
" W at er T
BA
St a:
+5
D ep th
U nk
VI
F
Ex G as
12" XSD
8" XSS
G A S
PWR PWR PWR
G A S
G A S
PWR PWR
PWR PWR PWR PWR
G A S
W
TR
W
TR
WTR WTR WTR
GAS GAS GAS GAS GAS GAS GAS
CO
CO
W M
W M
W
W
W M
W M
COMCOM
CO
M
COMCOMCOM
COMCOMCOMCOMCOMCOM
7+00
7+50
8+00 8+50
STM STM
S
TM
STM STM STM
CO
CO
SAN
W M
W
MW
M
W M
AR
V
8" DI Water
6" D I W ater
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A L MER
84675
12/31/
RE
GISTERED PROFESS IONA L
Water Keynotes
WPP-04
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
6+ to
+8
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
5M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
4 Sta 6+83, 25' R - Install :
(2) 1" Water Service connection
• 14120 SW Wilson Dr
• 14150 SW Wilson Dr
3 Sta 8+04 - Install :
(1) 8" DI tee, MJ, 5.7' depth
(2) 8" RSGV, MJ (E, W)
See sheet WPP-17 for SW 141st Ave Alignment & Profile
5 Sta 8+56, 8' R - Install :
(1) 1" Water Service connection
• 14090 SW Wilson Dr
1 Sta 7+46, Install:
(1) 8" DI 45° bend, MJ
4'
3' m in
6' m in
Existing Ground @ pipe CL
36" cover min, typ
±7'
6 Sta 8+60, 27' L - Install :
(1) Combination air release/air vacuum valve assembly
2 Sta 7+69, Install:
(1) 8" DI 45° bend, MJ
SW Wilson Dr
SW
141st Ave
14125
14120 14090 14050
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
7 Sta 8+62, 8' R - Install :
(1) 1" Water Service connection
• 14050 SW Wilson Dr
18" min
BID
Wilson Rd Waterline - Sta 8+80 to 10+20
8+80 9+00 10+00 10+20
" S to rm
St a:
9+
To P:
3.
8" XSS
PWR PWR
PWR
WTR WTR
GAS GAS GAS GAS
GAS
GAS
W M
C O
M
COM
COM
COMCOM
COM
COM
COMCOMCOM
9+00 9+50
10+00
STM
SAN
SAN
SAN
SAN
COM
C O
M
8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
GIST ERED PROFESS IONA L
Water Keynotes
WPP-05
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
8+ to
0+
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
M
ATC
H
LIN
E
See Sheet W
PP-06
7.
8' 3' m in
Existing Ground @ pipe CL
36" cover min, typ
" m in
SW Wilson Dr
7790 7795
14050 14020
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
18" min
1 Sta 9+60, Install:
(1) 8" DI 11.25° bend, MJ
BID
Wilson Rd Waterline - Sta 10+20 to 12+20
10+20 11+00 12+00 12+20
8" XSS
I.E . o ut : 2
.8
(8
" N
I.E . i n:
.0
(8
" W
St a:
0+
.6
R im : 3
.3
SS
M
H
I.E . o ut : 2
.6
(8
" E
St a:
1+
.3
R im : 3
.4
SS
C
O
St a:
0+
D ep th
U nk
VI
F
Ex G as
St a:
0+
.6
El ev
: 3
.3
- V
IF
Ex
" W at er T
BA
8" XSS
St a:
2+
.9
El ev
: 3
.5
C
AR
V
St a:
0+
D ep th
U nk
VI
F
Ex C om m s
St a:
1+
D ep th
U nk
VI
F
Ex C om m s
G
AS
W
TR
WTR WTR WTR WTR
GAS
GAS
GAS
GAS GAS GAS GAS
CO
W M
W
W
W
W M W
M
C O
M
COMCOMCOMCOM
COM
COM
COMCOMCOMCOMCOM
COM
COM
10+50 11+00 11 +5
12+00
CO
SAN
S A N
SAN
W M
W M
W M
AR
V
COM
COM
COM
COM
CO
M
CO
M
C O
M C O
M
8" DI Water
6" D I W ater
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
GIST ERED PROFESS IONA L
Water Keynotes
WPP-06
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
+2 to
2+
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
M
ATC
H
LIN
E See Sheet W
PP-05
1 Sta 10+53 - Install :
(1) 8" 11.25° Horz Bend, MJ
5 Sta 10+23.3, 11' R - Install :
(1) 1" Water Service connection
• 14020 SW Wilson Ct
3 Sta 11+44.8, Install:
(1) 8" DI 45° bend, MJ (roll as required)
6 Sta 11+11.0±, 6' R - Install :
(2) 1" Water Service connection
• 13970 SW Wilson Ct
• 13990 SW Wilson Ct
6 3 4
3 4
7'
5' m in
5'
Existing Ground @ pipe CL 36" cover min, typ
6' min
6' min
4 Sta 11+71.9, Install:
(1) 8" DI 45° bend, MJ
SW Wilson Dr
SW
140th Ave
13990
13970 7775
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
7 Sta 12+10, 9.5' L - Install :
(1) Combination air release/air vacuum valve assembly
2 Sta 10+59 - Install :
(1) 8" Tee, MJ, 5.3' depth
(3) 8" RSGV, MJ
See sheet WPP-18 for SW 140th Ave Alignment & Profile
BID
Wilson Rd Waterline - Sta 12+20 to 14+10
12+20 13+00 14+00 14+10
St a:
2+
D ep th
U nk
VI
F
Ex G as
St a:
3+
.3
El ev
: 3
.8
VI
F
Ex
" W at er T
BA
I.E . o ut : 2
.5
(8
" E
I.E . i n:
.7
(8
" W
I.E . i n:
.7
(8
" S
St a:
3+
.6
R im : 3
.1
SS
M
H
8" XSS
8" XSS
" S to rm
St a:
+9
To
P:
0.
G A S
G A S
W
TR
W
TR
PWR
PWR
WTR WTR WTR WTR
GAS GAS GAS GAS GAS GAS GAS
W
W
W
C O
M
COMCOMCOMCOM
CO
M
COMCOM
COMCOMCOMCOM
COM
COM
12+50 13+00 13+50 14+00
S
TM
STM STM STM
SAN SAN SAN SAN SAN
S A N
E1+00
E1+50
8" DI Water
6" D
I W ate r
6" D I W ater
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
GIST ERED PROFESS IONA L
Water Keynotes
WPP-07
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
+2 to
4+
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
1 Sta 13+11 - Install :
(1) 8" cross, MJ, 4.3' depth
(3) 8" RSGV, MJ (W, S, E)
(1) 8"x6" reducer, MJ See Sheets WPP-19 & WPP-20 for SW Danielle Ave & SW 139th Ave Plan & Profiles
1Existing Ground @ pipe CL
36" cover min, typ
5'
SW Wilson Dr
SW
Danielle
Ave
SW Wilson Ave
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
SW
139th Ave
5' 6' M in 6' M in
BID
Wilson Rd Waterline - Sta 14+10 to 15+90
14+10 15+00 15+90
8" XSS
St a:
4+
D ep th
U nk
VI
F
W at er S er vi ce
St a:
5+
D ep th
U nk
VI
F
W at er S er vi ce
St a:
4+
D ep th
U nk
VI
F
Ex G as
" S to rm
St a:
+1
To
P:
2.
St a:
5+
D ep th
U nk
VI
F
Ex C om m s
G A S
PWR PWR PWR
PWR PWR
PWR
PWR
WTR WTR
GAS GAS GAS
GAS
GAS
GAS
GAS
W M W M
W M
W M
W M W
M
W M
COM
COM
COM
COM
C O
M
COMCOM
COM
COM
COMCOMCOMCOMCOM
14+50 15+00 15+50
16+00
SAN SAN SAN SAN SAN SAN
S A N
W M
W M
W M
W M
W M
W M
W M
W M
/ 8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
GIST ERED PROFESS IONA L
Water Keynotes
WPP-08
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
+2 to
6+
M
ATC
H
LIN
E
See Sheet W
PP-09
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
1 Sta 15+79.82 - Install:
(1) 8" 11.25° bend, MJ (deflect to 15°)
2 Sta 14+21.5±, 9' L - Install:
(2) 1" Water Service connection
• 7720 SW Danielle Ave
• 7795 SW Wilson Ave
3 Sta 14+31.9±, 26' R - Install:
(2) 1" Water Service connection
• 7810 SW Danielle Ave
• 7790 SW Wilson Ave
4 Sta 15.74.2±, 15' R - Install:
(2) 1" Water Service connection
• 7760 SW Wilson Ave
• 7780 SW Wilson Ave
Existing Ground @ pipe CL
36" cover min, typ
4' m in
8' m in
" m in
SW Wilson Ave
7720 7795
7790 7790
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
2 4
BID
Wilson Rd Waterline - Sta 15+90 to 17+90
15+90 16+00 17+00 17+90
8" S an ita ry St a:
+4
To P:
6.
" S to rm
St a:
+3
To
P:
3.
St a:
7+
D ep th
U nk
VI
F
Ex
" W at er T
BA
St a:
7+
D ep th
U nk
VI
F
Ex C om m s
PWR
PW
R
PWR
PWR
W
TR
WTR
WTR
WTR
GAS
GAS
GAS
GAS GAS
GAS
GAS
W M
W M
W W
COM
COM
COM
COM
COM
COM
COM
COM
COMCOM
COM
COM
16+00
16+50 17+00
17+50
18+00
STM
STM
STM
STM
SAN
SA
N
SA
N
SA
N
F1+00
W M
W M
AR
V
8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G IST ERED PROFESS IONA L
Water Keynotes
WPP-09
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
+2 to
8+
M
ATCHLINE
See Sheet W
PP-10
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
1 Sta 16+51 - Install:
(1) 8" 11.25° bend, MJ (horizontal deflect to 15°)
4 Sta 17+73 - Install:
(1) 8" 22.5° bend, MJ
5 Sta 16+06, 18' L - Install :
(2) 1" Water Service connection
• 7755 SW Wilson Ave
• 7775 SW Wilson Ave
3 Sta 16+90 - Install :
(1) 8"x4" DI tee, MJ, 4.8' depth
(2) 8" RSGV, MJ
(1) 4" RSGV, MJ
See sheet WPP-21 for SW Wilson Ave cul-de-sac Alignment & Profile
1 3
Existing Ground @ pipe CL 36" cover min, typ
2 Sta 16+76 - Install:
(1) 8" 11.25° bend, MJ (horizontal deflect to 15°)
6 Sta 17+68.9 - Install :
(1) Combination air release/air vacuum valve assembly m in
SW Wilson Ave
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
5' m in
BID
Wilson Rd Waterline - Sta 17+90 to 19+80
17+90 18+00 19+00 19+80
St a:
8+
D ep th
U nk
VI
F
Ex G as
St a:
9+
D ep th
U nk
VI
F
Ex G as
St a:
8+
D ep th
U nk
VI
F
W at er S er vi ce
St a:
8+
D ep th
U nk
VI
F
Ex
" W at er T
BA
S A N
PWR
WTR
WTR WTR
WTR
G A S
G
AS
GAS
GAS
GAS GAS
GAS
GAS
GAS
W M
W M
W M
W M
COM
COM
COM
COMCOM
COM
COM
COM
COM
COM
COMCOMCOM
COM
18+00 18+50 19+00
19+50
STM STM STM STM
STM
SAN
SAN
SAN
SAN
SAN
SAN
SAN
W M
W M
W M
W M
8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G IST ERED PROFESS IONA L
Water Keynotes
WPP-10
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
+2 to
9+
M
ATC
H
LIN
E
See Sheet W
PP-11
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-0
1 Sta 19+23, Install:
(1) 8" DI 11.25° bend, MJ
2 Sta 18+19, 19' L - Install :
(2) 1" Water Service connection
• 7695 SW Wilson Ave
• 7725 SW Wilson Ave
3 Sta 18+35, 18' R - Install :
(2) 1" Water Service connection
• 7690 SW Wilson Ave
• 7700 SW Wilson Ave
3 1
2 3
Existing Ground @ pipe CL
36" cover min, typ
SW Wilson Ave
13650
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see CoB Standard Drawing
3 Install sheathing material between new waterline/services and existing gas line, 36" long centered on crossing, typ all crossings. Sheathing to be provided by NW Natural.
4 Protect existing mailbox or mailbox cluster. Maintain mail delivery service during construction.
8" DI Water
BID
Wilson Rd Waterline - Sta 19+80 to 21+80
19+80 20+00 21+00 21+80
St a:
0+
.0
D ep th U nk no w n
W at er S er vi ce
St a:
0+
.3
D ep th U nk no w n
W at er S er vi ce
St a:
0+
D ep th
U nk
VI
F
Ex G as
" S to rm
St a:
+4
To
P:
5.
8" S an ita ry St a:
+2
To P:
4.
" S to rm
St a:
+8
To
P:
4.
I.E . o ut : 2
.0
(8
" N
St a:
1+
.7
R im : 2
.0
SS
M
H
St a:
0+
D ep th
U nk
VI
F
W at er S er vi ce
St a:
1+
D ep th
U nk
VI
F
Ex C om m s
W
TR
WTR WTR WTR
GAS
G A S
G A
S GAS GAS GAS GAS GAS GASW
M
W
W
W
W
MW
M
COMCOMCOMCOMCOMCOM
COMCOMCOMCOMCOMCOMCOM
COM
CO
M
COMCOMCOMCOMCOMCOM
20+00 20+50
21+00
21+50
STM STM STM STM STM STM
STM
STM
SAN
S A N
SAN
W M
W M
W M
PR
V
PR
V
8" DI Water
8" DI Water
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 7/16/2026
H:\CIP\4243 - WILSON DR & AVE (WILSON CT - HART RD) WATERLINE REPLACEMENT\05 DESIGN\5.11 CAD\4243-WATER-PLANPROF.DWG
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
EXPIRES:
OREGONS E P T E M B E R 1 1 , 2 0 1 8MA T T HE W C H A R L E S P A LMER
84675
12/31/
RE
G IST ERED PROFESS IONA L
Water Keynotes
WPP-11
MPGJ
SW
W ils on
D r W at er lin e
R ep la ce m en t
St a
+8 to
1+
M
ATC
H
LIN
E
See Sheet W
PP-12
M
AT
C H
LI
N
E Se e Sh ee t W
PP
-1
6 Sta 21+74 - Install:
(1) 8" 11.25° bend, MJ
8 Sta 20+90, 25' L - Install :
(2) 1" Water Service connection w/ private PRV
• 7625 SW Wilson Ave
• 7655 SW Wilson Ave
2 Sta 20+18 - Install :
(1) 8"x8" DI tee, MJ, 3.1' depth
(2) 8" RSGV, MJ
Roll tee as required, see sheet WPP-22 for SW 32nd St plan & profile
7 Sta 20+03, 25' L - Install :
(1) 1" Water Service connection
• 7675 SW Wilson Ave
1 Sta 22+50- Install:
(1) 8" 11.25° bend, MJ
1 2
Existing Ground @ pipe CL
36" cover min, typ m in m in m in
6' m in
SW Wilson Ave
13655 7620
76257655
13650
General Keynotes
1 Replace standard sidewalk, see CoB Standard Drawing 2040
2 Replace curb & gutter, see…
This is the start of the file's text. The full file is on GovTribe.