White City SORCC Draft CLINS.pdf
PDF 46 KB Posted
- Solicitation number
- Not on record
About this file
This document is a Contract Line Item Number (CLIN) pricing schedule for a VA Southern Oregon Rehabilitation Center and Clinics (SORCC) design-build construction project in White City, Oregon. The CLIN schedule outlines 22 line items covering design, demolition, construction, and optional work for two primary buildings (B300 and B301) and associated site improvements.
The base contract line items (0001-0010) include design and construction of a Support Building (B300), a Primary and Specialty Care Building (B301), and a surface parking lot with 188 spaces. Optional line items (0011-0022) cover preventative maintenance, extended warranty, asbestos removal, partnering facilitation, additional building demolitions, a government field office, interior mockup space, soil and foundation removal, and a schedule incentive for early completion. The project involves demolishing existing buildings and corridors, constructing new buildings and connecting corridors, managing utilities, site grading, and landscaping, with a focus on seismic upgrades and facility modernization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Quantity Unit Unit Price Line Item Amount 0001 Design Demolition and Sitework B300 Support Building - all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of as-built drawings for the design of demolition (to include all base costs associated with asbestos remediation based on the hazardous waste survey included in this RFP) of two (2) existing buildings B222 and B223; work to keep B224 operational during construction; demolish four (4) existing connecting corridors CC222, CC222-ramp, CC223, CC224; construct primary utilities, site grading, curb and gutters, paving, sidewalks, stormwater drainage management and treatment, landscaping, lighting, and fire protection infrastructure five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP, and exclusive of all other work listed separately.
1 Job
0002 Demolition and Sitework B300 Support Building - all labor, plant, equipment, materials, and incidentals required for demolition (to include all base costs associated with asbestos remediation based on the hazardous waste survey included in this RFP) of two (2) existing buildings B222 and B223; work to keep B224 operational during construction; demolish four (4) existing connecting corridors CC222, CC222-ramp, CC223, CC224;
construct primary utilities, site grading, curb and gutters, paving, sidewalks, stormwater drainage management and treatment, landscaping, lighting, and fire protection infrastructure five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP as designed in CLIN 0001, and exclusive of all other work listed separately.
1 Job
0003 Design B300 Support Building - all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of as-built drawings for the design of Support Building (B300), and two
(2) new connecting corridors CC222 and CC224, complete utilities within a line five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP, and exclusive of all other work listed separately.
1 Job
0004 Construct B300 Support Building - all labor, plant, equipment, materials, and incidentals required for construction of Support Building (B300), and two (2) new connecting corridors CC222 and CC224, complete utilities within a line five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP as designed in CLIN 0003, and exclusive of all other work listed separately.
1 Job
0005 Design Demolition and Sitework B301 Primary and Specialty Care Building - all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of as-built drawings for the design of demolition of existing parking lots G and O; Temporary/permanent parking to account for the Patient/Staff parking lost during construction at the locations shown in Attachment A6; construction of temporary service road for B201A Patient dropoff ; construction of primary utilities, site grading, curb and gutters, paving, sidewalks, stormwater drainage management and treatment, landscaping, lighting, and fire protection infrastructure five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP, and exclusive of all other work listed separately.
1 Job
0006 Demolition and Sitework B301 Primary and Specialty Care Building - all labor, plant, equipment, materials, and incidentals required for demolition of existing parking lots G and O; Temporary/permanent parking to account for the Patient/Staff parking lost during construction at the locations shown in Attachment A6;
construction of temporary service road for B201A Patient dropoff ; construction of primary utilities, site grading, curb and gutters, paving, sidewalks, stormwater drainage management and treatment, landscaping, lighting, and fire protection infrastructure five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP as designed in CLIN 0005, and exclusive of all other work listed separately.
1 Job
0007 Design B301 Primary and Specialty Care Building - all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of as-built drawings for the design of Primary and Specialty Care Building B301, one (1) new connecting corridor CC301, and the renovation of a portion of the existing building 201A where the new CC301 will be connected. complete utilities within a line five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP, and exclusive of all other work listed separately.
1 Job
0008 Construct B301 Primary and Specialty Care Building - all labor, plant, equipment, materials, and incidentals required for construction of Primary and Specialty Care Building B301 , one (1) new connecting corridor CC301, and the renovation of a portion of the existing building 201A where the new CC301 will be connected. complete utilities within a line five feet outside of the exterior wall of the structure/connecting corridors in accordance with the RFP as designed in CLIN 0007, and exclusive of all other work listed separately.
1 Job
0009 Design of B301 Surface Parking Lot - all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of as-built drawings for the design of Parking Lot B with 188 spaces, complete, in accordance with the RFP, and exclusive of all other work listed separately.
1 Job
0010 Construct B301 Surface Parking Lot - all labor, equipment, materials, parts, and incidentals for construction of Parking Lot B with 188 spaces, complete, in accordance with the RFP as designed in CLIN 0009, and exclusive of all other work listed separately.
1 Job
0011 OPTION 01: Preventative Maintenance - all costs associated with providing all labor, material, and equipment to perform preventative maintenance for B300 and B301 (daily, monthly, quarterly, annually) in accordance with manufacturer guidance for one-year for the Base Offer.
1 Job
0012 OPTION 02: Extended Construction Warranty - all costs associated with providing a one year extension of the one-year Construction warranty provided in accordance with the RFP (including extension of the performance bond) for the Base Offer.
1 Job
0013 OPTION 03: Removal and Disposal of Additional Asbestos Containing Materials (ACM) - all removal and disposal of Asbestos-Containing Materials measured up to 50 lbs per an abatement not to exceed 10 abatements. The Contractor must submit the weigh slip and the Waste Shipment Record (WSR) prior to requesting payment for this line item. This CLIN covers additional incidental ACM encountered above what is identified in this RFP and Base CLINs 0001 through 0010.
10 50 lbs
0014 OPTION 04: Partnering Facilitator - all costs associated with providing a Partnering Facilitator to provide the Partnering Sessions as described in Section 01 10 00.00 25 CONTRACT ADMINISTRATION DATA. 1 Job
0015 OPTION 05: Demolish B227, B262, CC228, B228, and B229 - all labor, equipment, materials, parts, and incidentals for design and demolition of B227, B262, CC228, B228, and B229. Provide a code/ABA compliant exterior door/enclosure at CC227 with a ABA accessible route from the interior of the corridor to the nearest exterior accessible pathway. Infill foundation footprints with soil, spread native grass seed, and provide watering to ensure approximately 75% seed sprouts.
1 Job
0016 OPTION 06: Demolish B234, CC234, B235, B259,and B270 - all labor, equipment, materials, parts, and incidentals for design and demolition of B234, CC234, B235, B259, and B270. Infill foundation footprints with soil, spread native grass seed, and provide watering to ensure approximately 75% seed sprouts.
1 Job
0017 OPTION 07: Demolish B213, CC214, and B214 - all labor, equipment, materials, parts, and incidentals for design and demolition of B213, CC214, and B214. Provide a code/ABA compliant exterior door/enclosure at CC213 with a ABA accessible route from the interior of the corridor to the nearest exterior accessible pathway.
Infill foundation footprints with soil, spread native grass seed, and provide watering to ensure approximately 75% seed sprouts.
1 Job
0018 OPTION 08: Government Field Office - all labor, equipment, materials, parts, and incidentals for design and construction of a Government Field Office in accordance with Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS paragraph GOVERNMENT FIELD OFFICE.
1 Job
0019 OPTION 09: Interior Mockup Space - providing a minimum 2,500 SF off site mockup space for the physical interior mockups in Section 01 43 30.00 99 MOCKUPS.
1 Job
0020 OPTION 10: Removal, Disposal, and Fill of Unsuitable Soil -all labor, equipment, materials, parts, and incidentals for removal, disposal, and fill of unsuitable soil up to 500 CY above what is stated in the base contract.
50 10 CY
0021 OPTION 11: Removal, Disposal, and Fill of Concrete Foundations - all labor, equipment, materials, parts, and incidentals for removal, disposal, and fill of concrete foundations up to 100 CY above what is stated in the base contract.
10 10 CY
0022 OPTION 12: Schedule Incentive - every calendar day ahead of the contract completion date listed in Division 00 up to 30 calendar days.
30 Day