Wetmore Park Master Plan Conceptual INCLUDE WITH Q A PLEASE.pdf
PDF 730 KB Posted
- Attached to
- Splash Pad Design
- Solicitation number
- 20-PRF12
- Issued by
- Wisconsin
About this file
This is a conceptual master plan document for Wetmore Park prepared by the City of Sun Prairie, Wisconsin, in conjunction with the Parks, Recreation & Forestry department's splash pad design initiative. The plan outlines a comprehensive park renovation project that includes the addition of a splash pad, skating rink, performance structures, and enhanced recreational amenities. Key features detailed in the master plan include a chilled ice skating ribbon over concrete, a splash pad with changing spaces and seating, refurbished and new play equipment with poured-in-place surfacing, a remodeled restroom and shelter building with roll doors for warming and concessions, vendor spaces, lawn seating areas with low landforms, bike parking, realigned asphalt paths, shade structures, and improved sidewalk connections. The plan also incorporates existing infrastructure such as trees, drainage ways, bridge crossings, and the existing skating rink, with additional amenities including performance lawn areas, plaza spaces, table seating, lighting, and post-and-rope fencing throughout the park grounds.
The City of Sun Prairie is currently soliciting proposals from qualified vendors for design and construction administration services for the splash pad component of the Wetmore Park Master Plan. The conceptual plan document serves as the basis for vendor consideration and indicates the scope of work required for transforming the existing park into a multi-use recreational facility. Additional information regarding pricing terms, funding sources, response deadlines, and specific contract requirements would be contained in the formal request for proposals accompanying this master plan document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING SHELTER IMPROVEMENTS
SIDEWALK CONNECTION
OVER SWALE
SIDEWALK
ACCESS ON
NORTH AND
SOUTH SIDE OF
PARKING LOT
PERFORMANCE STRUCTURE WITH STORAGE
EXISTING RINK LIGHT, TYP.
EXISTING SKATING RINK
LAWN SEATING AREA
PERFORMANCE LAWN SEATING
AREA WITH LOW LANDFORMS
AREA/SKATE RIBBON LIGHTING
POST AND ROPE FENCING
TABLE SEATING, TYP.
PLAZA SPACE, TYP.
VENDOR SPACE
SHELTER
CONNECTION
BIKE PARKING
REALIGNED
ASPHALT PATH
SPLASH PAD
· SHADE STRUCTURE
· CHANGING SPACES
· SEATING
REFURBISHED
AND NEW
PLAY
EQUIPMENT
VENDOR SPACE
PARK ENTRY
EXISTING TREE, TYP.
CHILLED ICE SKATING RIBBON
OVER CONCRETE
STONE WALL / SEATING
N O
R
TH
S
TR
EE
T
EXISTING DRAINAGE WAY
EXISTING BRIDGE CROSSING
REMODELED RESTROOM /
SHELTER BUILDING
· ROLL DOORS FOR WARMING
· CONCESSIONS
· UTILITIES
SWINGS:
· STANDARD
· BUCKET
· ADA
· PARENT/CHILD
POURED-IN-PLACE
PLAY SURFACING
City of Sun Prairie, Wisconsin ID | 52-0675
1125| 2019
Wetmore Park - Concept Plan 20 40
File details come from the government source that posted it. Updated .