Wetmore Park Master Plan Conceptual INCLUDE WITH Q A PLEASE.pdf

PDF 730 KB Posted

Attached to
Splash Pad Design
Solicitation number
20-PRF12
Issued by
Wisconsin

About this file

This is a conceptual master plan document for Wetmore Park prepared by the City of Sun Prairie, Wisconsin, in conjunction with the Parks, Recreation & Forestry department's splash pad design initiative. The plan outlines a comprehensive park renovation project that includes the addition of a splash pad, skating rink, performance structures, and enhanced recreational amenities. Key features detailed in the master plan include a chilled ice skating ribbon over concrete, a splash pad with changing spaces and seating, refurbished and new play equipment with poured-in-place surfacing, a remodeled restroom and shelter building with roll doors for warming and concessions, vendor spaces, lawn seating areas with low landforms, bike parking, realigned asphalt paths, shade structures, and improved sidewalk connections. The plan also incorporates existing infrastructure such as trees, drainage ways, bridge crossings, and the existing skating rink, with additional amenities including performance lawn areas, plaza spaces, table seating, lighting, and post-and-rope fencing throughout the park grounds.

The City of Sun Prairie is currently soliciting proposals from qualified vendors for design and construction administration services for the splash pad component of the Wetmore Park Master Plan. The conceptual plan document serves as the basis for vendor consideration and indicates the scope of work required for transforming the existing park into a multi-use recreational facility. Additional information regarding pricing terms, funding sources, response deadlines, and specific contract requirements would be contained in the formal request for proposals accompanying this master plan document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING SHELTER IMPROVEMENTS

SIDEWALK CONNECTION

OVER SWALE

SIDEWALK

ACCESS ON

NORTH AND

SOUTH SIDE OF

PARKING LOT

PERFORMANCE STRUCTURE WITH STORAGE

EXISTING RINK LIGHT, TYP.

EXISTING SKATING RINK

LAWN SEATING AREA

PERFORMANCE LAWN SEATING

AREA WITH LOW LANDFORMS

AREA/SKATE RIBBON LIGHTING

POST AND ROPE FENCING

TABLE SEATING, TYP.

PLAZA SPACE, TYP.

VENDOR SPACE

SHELTER

CONNECTION

BIKE PARKING

REALIGNED

ASPHALT PATH

SPLASH PAD

· SHADE STRUCTURE

· CHANGING SPACES

· SEATING

REFURBISHED

AND NEW

PLAY

EQUIPMENT

VENDOR SPACE

PARK ENTRY

EXISTING TREE, TYP.

CHILLED ICE SKATING RIBBON

OVER CONCRETE

STONE WALL / SEATING

N O

R

TH

S

TR

EE

T

EXISTING DRAINAGE WAY

EXISTING BRIDGE CROSSING

REMODELED RESTROOM /

SHELTER BUILDING

· ROLL DOORS FOR WARMING

· CONCESSIONS

· UTILITIES

SWINGS:

· STANDARD

· BUCKET

· ADA

· PARENT/CHILD

POURED-IN-PLACE

PLAY SURFACING

City of Sun Prairie, Wisconsin ID | 52-0675

1125| 2019

Wetmore Park - Concept Plan 20 40

File details come from the government source that posted it. Updated .