Weldon Auditorium Renovations Bid Doc. Proj. Man Vol 2 - 01.31.25.pdf

PDF 4 MB Posted

Attached to
Weldon Auditorium Renovations
Solicitation number
ITB 2024 - 014
Issued by
Chesterfield County, South Carolina

About this file

The document is a comprehensive project manual for the Weldon Auditorium Renovations located in Manning, South Carolina, prepared by Meadors, Inc. with an architect's project number of 21-0024 and a county project number of ITB 2024-014. The project involves a multi-phase renovation including the removal of existing roofing and installation of a new roofing system utilizing Styrene-Butadiene-Styrene (SBS) modified bituminous membrane roofing, removal and replacement of existing HVAC units, removal of exterior EIFS finish and installation of new cementitious siding, replacement of auditorium ceiling light fixtures, installation of OSHA-compliant railing to the attic catwalk, and installation of new drainage lines in the courtyard.

The project manual provides detailed technical specifications for various components of the renovation, including roof insulation, metal fabrications, thermal and board insulation, fluid-applied membrane air barriers, and exterior wall systems. The specifications outline precise performance requirements, material standards, installation methods, and quality assurance protocols. While specific pricing details are not explicitly stated, the document suggests a comprehensive approach to renovation that prioritizes durability, energy efficiency, and compliance with building codes and safety standards. The project appears to be funded through local government channels, with a focus on thorough documentation and high-quality material selections to ensure long-term performance of the renovated auditorium.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL VOLUME 2

WELDON AUDITORIUM

RENOVATIONS

Manning, South Carolina Architect’s Project No. 21-0024 County’s Project No. ITB 2024-014

Bid Document Set January 31, 2025

MEADORS, Inc.

2811 Azalea Drive, Charleston SC, 29405 PHONE: 843-723-8585 | WEBSITE: meadorsinc.com

WELDON AUDITORIUM RENOVATIONS 21-0024

Meadors, Inc. Construction Documents 01/31/2025

SELECTIVE DEMOLITION 024119 - 1

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

B. Related Requirements:

1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Section 015639 "Temporary Tree and Plant Protection" for temporary protection of existing trees and plants that are affected by selective demolition.

3. Section 017300 "Execution" for cutting and patching procedures.

4. Section 013516 "Alteration Project Procedures" for general protection and work procedures for alteration projects.

5. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.

D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

SELECTIVE DEMOLITION 024119 - 2

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.4 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

B. Engineering Survey: Submit engineering survey of condition of building.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.

D. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's and other tenants' on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Use of elevator and stairs.

5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

E. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Comply with Section 013233 "Photographic Documentation." Submit before Work begins.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

SELECTIVE DEMOLITION 024119 - 3

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

1.6 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

1.7 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.

1.8 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

E. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.

F. Historic Areas: Demolition and hauling equipment and other materials shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, including temporary protection, by 12 inches or more.

G. Storage or sale of removed items or materials on-site is not permitted.

SELECTIVE DEMOLITION 024119 - 4

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

H. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.9 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

1.10 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

SELECTIVE DEMOLITION 024119 - 5

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

E. Survey of Existing Conditions: Record existing conditions by use of measured drawings preconstruction photographs or video and templates.

1. Inventory and record the condition of items to be removed and salvaged.

2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

3.2 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated services/systems when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Equipment to Be Removed: Disconnect and cap services and remove equipment.

3.4 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

SELECTIVE DEMOLITION 024119 - 6

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

C. Remove temporary barricades and protections where hazards no longer exist.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least two hours after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

10. Dispose of demolished items and materials promptly. Comply with requirements in

Section 017419 "Construction Waste Management and Disposal."

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

SELECTIVE DEMOLITION 024119 - 7

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area designated by Owner

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete.

Neatly trim openings to dimensions indicated.

B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

C. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight. See Section 075216 “Styrene- Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing” for new roofing requirements.

1. Remove existing roof membrane, flashings, copings, and roof accessories.

2. Remove existing roofing system down to substrate.

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and recycle or dispose of them according to Section 017419 "Construction Waste Management and Disposal."

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

SELECTIVE DEMOLITION 024119 - 8

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

4. Comply with requirements specified in Section 017419 "Construction Waste Management and Disposal."

B. Burning: Do not burn demolished materials.

3.8 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.9 SELECTIVE DEMOLITION SCHEDULE

A. Remove and Reinstall: <Auditorium seating as necessary for work on interior finish repairs.>.

END OF SECTION 024119

MASONRY CLEANING 040110 - 1

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

SECTION 040110 - MASONRY CLEANING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes cleaning the following:

1. Unit masonry surfaces.

2. Stone surfaces.

1.3 ALLOWANCES

A. Allowances for cleaning masonry are specified in Section 012100 "Allowances."

1.4 DEFINITIONS

A. Very Low-Pressure Spray: Under 100 psi

B. Low-Pressure Spray: 100 to 400 psi

C. Medium-Pressure Spray: 400 to 800 psi

1.5 SEQUENCING AND SCHEDULING

A. Work Sequence: Perform masonry-cleaning work in the following sequence:

1. Remove plant growth.

2. Inspect for open mortar joints. Where repairs are required, delay further cleaning work until after repairs are completed, cured, and dried to prevent the intrusion of water and other cleaning materials into the wall.

3. Remove paint.

4. Clean masonry surfaces.

5. Where water repellents are to be used on or near masonry, delay application of these chemicals until after cleaning.

B. As scaffolding is removed, patch anchor holes used to attach scaffolding. Patch holes in masonry units according to masonry repair Sections. Patch holes in mortar joints according to masonry repointing Sections.

MASONRY CLEANING 040110 - 2

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1.6 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Submit product data sheets on equipment to be used in this section.

1.7 QUALITY ASSURANCE

A. Mockups: Prepare mockups of cleaning on existing surfaces to demonstrate aesthetic effects and to set quality standards for materials and execution.

1. Cleaning: Clean an area 25 sq. ft for each type of masonry and surface condition.

a. Test cleaners and methods on samples of adjacent materials for possible adverse reactions. Do not test cleaners and methods known to have deleterious effect.

b. Allow a waiting period of not less than seven days after completion of sample cleaning to permit a study of sample panels for negative reactions.

c. Cleaning Sample shall serve as the project standard, sample shall remain in place until the work is completed.

2. Approval of mockups does not constitute approval of deviations from the Contract

Documents contained in mockups unless Architect specifically approves such deviations in writing.

B. Cleaning Appearance Standard: Cleaned surfaces are to have a uniform appearance as viewed from 20 feet (6 m) away by the Architect

1.8 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit masonry-cleaning work to be performed according to product manufacturers' written instructions and specified requirements.

B. The work of this Section shall be executed only when the air and surface temperatures are 40 degrees Fahrenheit and rising or less than 90 degrees F and falling. Minimum temperature for cleaning shall be 50 degrees F and above for at least two hours after completion and above freezing for at least 24 hours after completion. Work shall not commence when rain, snow, or below-freezing temperatures are expected within the next 24 hours. All surfaces shall be free of standing water, frost, and ice.

C. No masonry cleaning shall be performed when winds are sufficiently strong to spread cleaning materials or rinsed cleaning materials to adjacent unprotected areas.

1.9 PROJECT CONDITIONS

A. Performance Requirements: The intent of this Specification is to provide for the cleaning of areas of the building indicated above so as to render a natural, uniform clean (but not like new appearance) for all façade materials. Use the gentlest means possible to obtain desired results as approved by the Architect.

MASONRY CLEANING 040110 - 3

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

B. All exposed surfaces shall be cleaned using only the gentlest means as approved by the Architect on a location- by-location basis.

C. The Contractor is responsible for protecting existing adjacent materials during the execution of the work and shall provide all necessary protection and follow all necessary work procedures to avoid damage to existing material assemblies not a part of the work of this Section. At a minimum, the Contractor shall:

D. Protect woodwork, glass, metal, and sound mortar adjacent to masonry and areas to be cleaned from overspray and possible chemical or water damage from cleaning operations.

E. The Contractor shall coordinate cleaning operations with the other trades involved in exterior restoration work. Cleaning is to be completed prior to the application of an exterior masonry surface treatments.

F. All Contractor personnel performing cleaning operations shall be provided with gloves, respirators, protective clothing and any other personal protective equipment as recommended by the manufacturer of the cleaning products and required by local, state, and federal regulations.

G. The Contractor shall prevent leakage to interior enclosed spaces prior to starting cleaning operations.

1.10 DELIVERY, STORAGE, AND HANDLING

A. Deliver manufacturer’s or distributor’s packaging, undamaged, complete with application instructions and Material Safety Data Sheets.

B. Deliver materials to the job ready for use. Delivered materials shall be identical to reviewed shop drawings and samples.

C. Store and Deliver materials to the job ready for use. Transport cleaning agents, chemicals, and solvents within the temperature range recommended by the manufacturer and away from direct sunlight. Handle all materials according to manufacturer’s instructions.

PART 2 - PRODUCTS

2.1 CLEANING, General

A. Water used for cleaning of historic materials shall be potable and free of injurious amounts of oil, soluble salts, alkali, acids, and other impurities that might stain or otherwise damage masonry, stucco, or metal.

B. Where water has high iron or other metal content, pre-treat with complexing agents before use to reduce risk of staining.

C. Brushes: Fiber bristle only.

D. Wire brushes or metal scrapers are strictly prohibited.

MASONRY CLEANING 040110 - 4

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

E. VOC content: Product shall comply with VOC limits of authorities having jurisdiction.

2.2 CLEANING OF BIO-GROWTH

A. Cleaning methods: Cleaning shall be undertaken through the mildest, least abrasive method.

1. Water Washing: Cold water applied with a biodegradable cleaning solution that is pH neutral and does not contain salts, bleach, or hydrogen peroxide. Product shall be proven safely and effective at removing bio-growth and air pollutants on a variety of historic materials including brick, stone, stucco, metal and paint. Use lowest possible pressure to achieve desired results.

a. D/2 Biological Solution

b. An approved equal.

2.3 CLEANING OF EFFLORESCENCE

A. Cleaning methods: Cleaning shall be undertaken through the mildest, least abrasive method. Dry brushing and water washing to be accomplished prior to applying cleaning products.

1. Dry brushing and water washing: Remove light efflorescence by dry-brushing or brushing with a stiff fiber brush and water.

PART 3 - EXECUTION

3.1 PROTECTION

A. Comply with each manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent paint removers and chemical cleaning solutions from coming into contact with people, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.

1. Cover adjacent surfaces with materials that are proven to resist paint removers and chemical cleaners used unless products being used will not damage adjacent surfaces. Use protective materials that are waterproof and UV resistant. Apply masking agents according to manufacturer's written instructions. Do not apply liquid strippable masking agent to painted or porous surfaces. When no longer needed, promptly remove masking to prevent adhesive staining.

2. Do not apply chemical solutions during winds of enough force to spread them to unprotected surfaces.

3. Neutralize alkaline and acid wastes before disposal.

4. Dispose of runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.

MASONRY CLEANING 040110 - 5

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

3.2 REMOVAL OF SOILING, VEGETATION, ALGAL GROWTH, AND MOSS

A. Cut away or trim any vegetation than can easily be removed from the building. Cut back as close to the face as possible, without endangering the integrity of this historic material.

B. Do not remove living mosses, lichens, and higher order plants without first killing them with a biocide, since roots and other attachments may penetrate deeply into the masonry. Allow time for the plant to detach before attempting removal. The Contractor may apply a biocidal product to colonies of moss, or other biological contaminants. After at least 24 hours, the Contractor may remove colonies of moss, and loose growth, from surfaces to be cleaned using wooden scrapers.

C. The Contractor shall apply selected cleaning agent in accordance with manufacturer’s instructions and approved test panel. Allow product to dwell on soiled surfaces to achieve optimal cleaning.

D. Following required dwell time, agitate with a soft bristle brush to lift and remove embedded growth. The Contractor shall flush surfaces with low to medium-high pressure (not to exceed 400 psi) water rinse as required to remove staining. Repeat application as required to remove stains.

E. Spot clean for heavily soiled areas (biological growth):

1. Spot cleaning shall be performed only after general cleaning has been completed for approximately two weeks.

2. Thoroughly wet surfaces to be treated with spot cleaner. Apply the product using a brush, roller or low-pressure spray and allow it to dwell on the surface. Dwell time to be in accordance with the approved test panel.

3. After dwell time has elapsed, thoroughly rinse the surface with clean water at moderate pressure (400 psi or less), working from the bottom up.

3.3 REMOVAL OF EFFLORESCENCE

A. Remove light efflorescence by dry-brushing or brushing with a stiff fiber brush and water.

3.4 FINAL CLEANING

A. Collect and dispose of waste material, packaging, debris, and effluent associated with the cleaning work in accordance with local, state, and federal environmental regulations.

B. Upon completion of work, remove all protective coverings and coatings, and clean window glass and other spattered surfaces. Clean adjacent nonmasonry surfaces of spillage and debris.

C. Remove masking materials, leaving no residues that could trap dirt.

D. Rinse treated areas to clean and remove all biological growth and chemicals.

END OF SECTION 040110

BRICK MASONRY REPAIR 040120.63 - 1

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

SECTION 040120.63 - BRICK MASONRY REPAIR

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

B. Section 013591: Historic Treatment Procedures

C. Codes and Standards set forth by:

1. Preservation Brief #2, "Repointing Mortar Joints in Historic Buildings" as published by the U. S. National Park Service.

2. Brick Institute of America Applied Standards.

1.2 SUMMARY

A. Section Includes:

1. Repairing brick masonry.

2. Removing abandoned anchors.

3. Painting steel uncovered during the work.

B. Related Requirements:

1. Section 013516 "Alteration Project Procedures" for general remodeling, renovation, repair, and maintenance requirements.

2. Section 040120.64 “Brick Masonry Repointing” for mortar mixes.

1.3 ALLOWANCES

A. Allowances for brick masonry repair are specified in Section 012100 "Allowances."

B. Abandoned anchor removal is part of abandoned anchor removal allowance.

C. Brick removal and replacement is part of brick removal and replacement allowance.

1.4 UNIT PRICES

A. Work of this Section is affected by unit prices specified in Section 012200 "Unit Prices."

1. Unit prices apply to authorized work covered by quantity allowances.

2. Unit prices apply to additions to and deletions from Work as authorized by Change

Orders.

BRICK MASONRY REPAIR 040120.63 - 2

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1.5 DEFINITIONS

A. Low-Pressure Spray: 100 to 400 psi

B. Rebuilding (Setting) Mortar: Mortar used to set and anchor masonry in a structure, distinct from pointing mortar installed after masonry is set in place.

C. Saturation Coefficient: Ratio of the weight of water absorbed during immersion in cold water to weight absorbed during immersion in boiling water; used as an indication of resistance of bricks to freezing and thawing.

1.6 SEQUENCING AND SCHEDULING

A. Order custom, color matched mortar immediately after approval of samples and mockups. take delivery of and store at Project site enough quantity to complete Project.

B. Work Sequence: Perform brick masonry repair work in the following sequence, which includes work specified in this and other Sections:

1. Remove plant growth.

2. Inspect masonry for open mortar joints and point them before cleaning to prevent the intrusion of water and other cleaning materials into the wall.

3. Clean masonry.

4. Rake out mortar from joints surrounding masonry to be replaced and from joints adjacent to masonry repairs along joints.

5. Repair masonry, including replacing existing masonry with new masonry materials.

6. Rake out mortar from joints to be repointed.

7. Point mortar and sealant joints.

8. After repairs and repointing have been completed and cured, perform a final cleaning to remove residues from this work.

9. Where water repellents are to be used on or near masonry work, delay application of these chemicals until after pointing and cleaning.

C. As scaffolding is removed, patch anchor holes used to attach scaffolding. Patch holes in bricks according to this section. Patch holes in mortar joints according to Section 040120.64 "Brick Masonry Repointing."

1.7 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

2. Include recommendations for product application and use.

3. Include test data substantiating that products comply with requirements.

B. Samples for Verification: For the following:

BRICK MASONRY REPAIR 040120.63 - 3

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1. Each type of brick unit to be used for replacing existing units. Include sets of Samples to show the full range of shape, color, and texture to be expected. For each brick type, provide straps or panels containing at least four bricks. Include multiple straps for brick with a wide range.

2. Accessories: Each type of accessory and miscellaneous support.

1.8 QUALITY ASSURANCE

A. Brick Masonry Repair Specialist Qualifications: Engage an experienced brick masonry repair firm to perform work of this Section. Firm shall have completed work similar in material, design, and extent to that indicated for this Project with a record of successful in-service performance. Experience in only installing masonry is insufficient experience for masonry repair work.

1. Field Supervision: Brick masonry repair specialist firm shall maintain experienced full-time supervisors on Project site during times that brick masonry repair work is in progress.

B. Mockups: Prepare mockups of brick masonry repair to demonstrate aesthetic effects and to set quality standards for materials and execution and for fabrication and installation.

1. Masonry Repair: Prepare sample areas for each type of masonry repair work performed.

If not otherwise indicated, size each mockup not smaller than two adjacent whole units or approximately 48 inches in least dimension. Construct sample areas in locations in existing walls where directed by Architect unless otherwise indicated. Demonstrate quality of materials, workmanship, and blending with existing work.

2. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

3. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver bricks to Project site strapped together in suitable packs or pallets or in heavy-duty cartons and protected against impact and chipping.

B. Deliver packaged materials to Project site in manufacturer's original and unopened containers, labeled with manufacturer's name and type of products.

C. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.

D. Store hydrated lime in manufacturer's original and unopened containers. Discard lime if containers have been damaged or have been opened for more than two days.

E. Store sand where grading and other required characteristics can be maintained and contamination avoided.

BRICK MASONRY REPAIR 040120.63 - 4

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

F. Handle bricks to prevent overstressing, chipping, defacement, and other damage.

1.10 FIELD CONDITIONS

1.11 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit brick masonry repair work to be performed according to product manufacturers' written instructions and specified requirements.

B. Temperature Limits: Repair brick masonry only when air temperature is between 40 and 90 deg F and is predicted to remain so for at least seven days after completion of the Work unless otherwise indicated.

C. Cold-Weather Requirements: Comply with the following procedures for masonry repair unless otherwise indicated:

1. When air temperature is below 40 deg F , heat mortar ingredients, masonry repair materials, and existing masonry walls to produce temperatures between 40 and 120 deg F

2. When mean daily air temperature is below 40 deg F , provide enclosure and heat to maintain temperatures above 32 deg F within the enclosure for seven days after repair.

D. Hot-Weather Requirements: Protect masonry repairs when temperature and humidity conditions produce excessive evaporation of water from mortar and repair materials. Provide artificial shade and wind breaks, and use cooled materials as required to minimize evaporation. Do not apply mortar to substrates with temperatures of 90 deg F and above unless otherwise indicated.

E. For manufactured repair materials, perform work within the environmental limits set by each manufacturer.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Source Limitations: Obtain each type of material for repairing brick masonry (brick, cement, sand, etc.) from single source with resources to provide materials of consistent quality in appearance and physical properties.

2.2 MASONRY MATERIALS

A. Face Brick: As required to complete brick masonry repair work.

BRICK MASONRY REPAIR 040120.63 - 5

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

2.3 MORTAR MATERIALS

A. Portland Cement: ASTM C 150/C 150M, Type I or Type II, except Type III may be used for cold-weather construction; white or gray, or both where required for color matching of mortar.

1. Provide cement containing not more than 0.60 percent total alkali when tested according to ASTM C 114.

B. Hydrated Lime: ASTM C 207, Type S.

C. Masonry Cement: ASTM C 91/C 91M.

D. Mortar Cement: ASTM C 1329/C 1329M.

E. Mortar Sand: ASTM C 144.

1. Exposed Mortar: Match size, texture, and gradation of existing mortar sand as closely as possible. Blend several sands if necessary to achieve suitable match.

F. Mortar Pigments: ASTM C 979/C 979M, compounded for use in mortar mixes, and having a record of satisfactory performance in masonry mortars.

G. Water: Potable.

2.4 ACCESSORY MATERIALS

A. Setting Buttons and Shims: Resilient plastic, nonstaining to masonry, sized to suit joint thicknesses and bed depths of bricks, less the required depth of pointing materials unless removed before pointing.

B. Masking Tape: Nonstaining, nonabsorbent material; compatible with mortar, joint primers, sealants, and surfaces adjacent to joints; and that easily comes off entirely, including adhesive.

C. Other Products: Select materials and methods of use based on the following, subject to approval of a mockup:

1. Previous effectiveness in performing the work involved.

2. Minimal possibility of damaging exposed surfaces.

3. Consistency of each application.

4. Uniformity of the resulting overall appearance.

5. Do not use products or tools that could leave residue on surfaces.

2.5 MORTAR MIXES

A. Measurement and Mixing: Measure cementitious materials and sand in a dry condition by volume or equivalent weight. Do not measure by shovel; use known measure. Mix materials in a clean, mechanical batch mixer.

B. Colored Mortar: Produce mortar of color required by using specified ingredients. Do not alter specified proportions without Architect's approval.

BRICK MASONRY REPAIR 040120.63 - 6

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1. Mortar Pigments: Where mortar pigments are indicated, do not add pigment exceeding 10 percent by weight of the cementitious or binder materials, except for carbon black which is limited to 2 percent, unless otherwise demonstrated by a satisfactory history of performance.

C. Do not use admixtures in mortar unless otherwise indicated.

D. Mixes: Mix mortar materials in the following proportions:

1. Use mortar mixtures specified in Section 040120.64 "Brick Masonry Repointing.".

PART 3 - EXECUTION

3.1 PROTECTION

A. Prevent mortar from staining face of surrounding masonry and other surfaces.

1. Cover sills, ledges, and other projecting items to protect them from mortar droppings.

2. Keep wall area wet below rebuilding and repair work to discourage mortar from adhering.

3. Immediately remove mortar splatters in contact with exposed masonry and other surfaces.

3.2 MASONRY REPAIR, GENERAL

A. Appearance Standard: Repaired surfaces are to have a uniform appearance as viewed from 20 feet away by Architect.

3.3 ABANDONED ANCHOR REMOVAL

A. Remove abandoned anchors, brackets, wood nailers, and other extraneous items no longer in use unless indicated to remain. Notify Architect before removal.

1. Remove items carefully to avoid spalling or cracking masonry.

2. Notify Architect before proceeding if an item cannot be removed without damaging surrounding masonry. Do the following where directed:

a. Cut or grind off item approximately 3/4 inch beneath surface and core drill a recess of same depth in surrounding masonry as close around item as practical.

b. Immediately paint exposed end of item with two coats of antirust coating, following coating manufacturer's written instructions and without exceeding manufacturer's recommended dry film thickness per coat. Keep paint off sides of recess.

3. Patch hole where each item was removed unless directed to remove and replace bricks.

Patch holes in mortar joints according to Section 040120.64 "Brick Masonry Repointing."

BRICK MASONRY REPAIR 040120.63 - 7

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

3.4 BRICK REMOVAL AND REPLACEMENT

A. At locations indicated, remove bricks that are damaged, spalled, or deteriorated. Carefully remove entire units from joint to joint, without damaging surrounding masonry, in a manner that permits replacement with full-size units.

1. When removing single bricks, remove material from center of brick and work toward outside edges.

B. Support and protect remaining masonry that surrounds removal area.

C. Maintain flashing, reinforcement, lintels, and adjoining construction in an undamaged condition.

D. Notify Architect of unforeseen detrimental conditions including voids, cracks, bulges, and loose units in existing masonry backup, rotted wood, rusted metal, and other deteriorated items.

E. Remove in an undamaged condition as many whole bricks as possible where required.

1. Remove mortar, loose particles, and soil from brick by cleaning with hand chisels, brushes, and water.

2. Remove sealants by cutting close to brick with utility knife and cleaning with solvents.

3. Store brick for reuse. Store off ground, on skids, and protected from weather.

4. Deliver cleaned brick not required for reuse to Owner unless otherwise indicated.

F. Clean masonry surrounding removal areas by removing mortar, dust, and loose particles in preparation for brick replacement.

G. Replace removed damaged brick with other removed brick in good condition, where possible, matching existing brick. Do not use broken units unless they can be cut to usable size.

H. Install replacement brick into bonding and coursing pattern of existing brick. If cutting is required, use a motor-driven saw designed to cut masonry with clean, sharp, unchipped edges.

1. Maintain joint width for replacement units to match existing joints.

2. Use setting buttons or shims to set units accurately spaced with uniform joints.

I. Lay replacement brick with rebuilding (setting) mortar and with completely filled bed, head, and collar joints. Butter ends with enough mortar to fill head joints and shove into place. Wet both replacement and surrounding bricks that have ASTM C 67 initial rates of absorption (suction) of more than 30 g/30 sq. in. per min. Use wetting methods that ensure that units are nearly saturated but surface is dry when laid.

1. Tool exposed mortar joints in repaired areas to match joints of surrounding existing brickwork.

2. Rake out mortar used for laying brick before mortar sets according to Section 040120.64 "Brick Masonry Repointing." Point at same time as repointing of surrounding area.

3. When mortar is hard enough to support units, remove shims and other devices interfering with pointing of joints.

BRICK MASONRY REPAIR 040120.63 - 8

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

J. Curing: Cure mortar by maintaining in thoroughly damp condition for at least 72 consecutive hours, including weekends and holidays.

1. Hairline cracking within the mortar or mortar separation at edge of a joint is unacceptable. Completely remove such mortar and repoint.

3.5 PAINTING STEEL UNCOVERED DURING THE WORK

A. Notify Architect if steel is exposed during masonry removal. Where Architect determines that steel is structural, or for other reasons cannot be totally removed, prepare and paint it as follows:

1. Surface Preparation: Remove paint, rust, and other contaminants according to SSPC- SP 2, "Hand Tool Cleaning" SSPC-SP 3, "Power Tool Cleaning" , as applicable to comply with paint manufacturer's recommended preparation.

2. Antirust Coating: Immediately paint exposed steel with two coats of antirust coating, following coating manufacturer's written instructions and without exceeding manufacturer's recommended rate of application (dry film thickness per coat).

B. If on inspection and rust removal, the thickness of a steel member is found to be reduced from rust by more than 1/16 inch , notify Architect before proceeding.

3.6 LINTELS

A. Provide masonry lintels where shown and where openings of more than 24 inches for block-size units are shown without structural steel or other supporting lintels. Refer to structural drawings for locations and details.

B. Provide minimum bearing of 8 inches at each jamb unless otherwise indicated.

C. Refer to specification section 055000 METAL FABRICATIONS.

3.7 FINAL CLEANING

A. After mortar has fully hardened, thoroughly clean exposed masonry surfaces of excess mortar and foreign matter; use wood scrapers, stiff-nylon or -fiber brushes, and clean water applied by low-pressure spray.

1. Do not use metal scrapers or brushes.

2. Do not use acidic or alkaline cleaners.

B. Clean adjacent nonmasonry surfaces. Use detergent and soft brushes or cloths.

C. Clean mortar and debris from roof; remove debris from gutters and downspouts. Rinse off roof and flush gutters and downspouts.

D. Remove masking materials, leaving no residues that could trap dirt.

BRICK MASONRY REPAIR 040120.63 - 9

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

3.8 FIELD QUALITY CONTROL

A. Architect's Project Representatives: Architect will assign Project representatives to help carry out Architect's responsibilities at the site, including observing progress and quality of portion of the Work completed. Allow Architect's Project representatives use of lift devices and scaffolding, as needed, to observe progress and quality of portion of the Work completed.

B. Notify inspectors and Architect's Project representatives in advance of times when lift devices and scaffolding will be relocated. Do not relocate lift devices and scaffolding until inspectors and Architect's Project representatives have had reasonable opportunity to make inspections and observations of work areas at lift device or scaffold location.

3.9 MASONRY WASTE DISPOSAL

A. Salvageable Materials: Unless otherwise indicated, excess masonry materials are Contractor's property.

B. Masonry Waste: Remove masonry waste and legally dispose of off Owner's property.

END OF SECTION 040120.63

BRICK MASONRY REPOINTING 040120.64 - 1

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

SECTION 040120.64 - BRICK MASONRY REPOINTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

B. Section 013591: Historic Treatment Procedures

C. Codes and Standards set forth by:

1. Preservation Brief #2, "Repointing Mortar Joints in Historic Buildings" as published by the U. S. National Park Service.

2. Brick Institute of America Applied Standards.

D.

1.2 SUMMARY

A. Section Includes:

1. Repointing joints with mortar.

B. Related Requirements:

1. Section 013516 "Alteration Project Procedures" for general remodeling, renovation, repair, and maintenance requirements.

2. Section 040120.63 “Brick Masonry Repair” for brick repair procedures.

3. Section 079200 "Joint Sealants."

1.3 ALLOWANCES

A. Allowances for repointing brick masonry are specified in Section 012100 "Allowances."

B. Repointing brick masonry is part of masonry repointing allowance.

1.4 UNIT PRICES

A. Work of this Section is affected by unit prices specified in Section 012200 "Unit Prices."

1. Unit prices apply to authorized work covered by quantity allowances.

2. Unit prices apply to additions to and deletions from Work as authorized by Change Orders.

BRICK MASONRY REPOINTING 040120.64 - 2

Weldon Auditorium Renovations 01/31/2025 Meadors, Inc.

1.5 DEFINITIONS

A. Low-Pressure Spray: 100 to 400 psi

1.6 SEQUENCING AND SCHEDULING

A. Work Sequence: Perform brick masonry repointing work in the following sequence, which includes work specified in this and other Sections:

1. Remove plant growth.

2. Inspect masonry for open mortar joints and permanently or temporarily point them before cleaning to prevent the intrusion of water and other cleaning materials into the wall.

3. Remove paint.

4. Clean masonry.

5. Rake out mortar from joints surrounding masonry to be replaced and from joints adjacent to masonry repairs along joints.

6. Repair masonry, including replacing existing masonry with new masonry materials.

7. Rake out mortar from joints to be repointed.

8. Point mortar and sealant joints.

9. After repairs and repointing have been completed and cured, perform a final cleaning to remove residues from this work.

10. Where water repellents are to be used on or near masonry work, delay application of these chemicals until after pointing and cleaning.

B. As scaffolding is removed, patch anchor holes used to attach scaffolding. Patch holes in bricks according to Section 040120.63 "Brick Masonry Repair." Patch holes in mortar joints according to "Repointing" Article.

1.7 SUBMITTALS

A. Product Data: For each type of product.

1.8 QUALITY ASSURANCE

A. Brick Masonry Repointing Specialist Qualifications: Engage an experienced brick masonry repointing firm to perform work of this Section. Firm shall have completed work similar in material, design, and extent to that indicated for this Project with a record of successful in-service performance.