WD-FL20260222 DATED 5-18-26.pdf

PDF 2 MB Posted

Attached to
Z1DZ--FY27 NRM (PROJ 516-26-117) BB Repair Steam Piping in Manhole Near Building 1
Solicitation number
36C24827Q0004-1
Issued by

About this file

This is a General Decision document (FL20260222) establishing prevailing wage rates for construction work in Florida counties of Pinelas, effective May 18, 2026 (Modification 1), with an initial publication date of January 2, 2026. The document applies to Building construction types and covers multiple skilled trades and labor classifications.

The wage determination lists prevailing hourly rates and fringe benefit percentages for various construction classifications, including asbestos workers ($30.12/hour, 13.11% fringes), electricians ($33.11/hour, 14.59% fringes), elevator mechanics ($51.83/hour, 38.44% fringes), power equipment operators ranging from $35.01-$39.01/hour with 16.85% fringes, ironworkers ($28.90-$35.25/hour, 15.66-17.32% fringes), pipefitters and plumbers ($35.30/hour, 18.24% fringes), sheet metal workers ($25.75/hour, 16.92% fringes), and various laborers and equipment operators with rates between $11.31-$22.07/hour. The document includes special provisions regarding vacation pay credits based on tenure, paid sick leave requirements per Executive Orders 13706 and 13658, and an appeals process for challenging wage determinations through the U.S. Department of Labor's Wage and Hour Division and Administrative Review Board. Rate identifiers indicate whether classifications reflect union prevailing rates, union average rates, survey rates, or state-adopted rates with their respective effective dates.

View the file

Other files

File Type Posted
Wall overhead and details.pdf PDF
36C24827Q0004 0002.pdf PDF
Utility map.jpg JPG image
36C24827Q0004 0001.pdf PDF
site visit Q0004.pdf PDF
516-26-117 Specifications 00 01 10.pdf PDF
PPQ -Request form.docx DOCX document
PPQ.pdf PDF
36C24827Q0004_1.pdf PDF
ASBUILTS-516-26-117.pdf PDF
05_Drawings SECTION LP302- 516-26-117.pdf PDF
EMR 1 page.docx DOCX document
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .