Base Offer Price Breakdown - 1 page.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24827Q0004-1
About this file
This is a pricing template for submitting a base offer cost breakdown for federal construction contracts. The spreadsheet organizes labor and material costs across 34 divisions of work using the standard CSI (Construction Specifications Institute) format, including general requirements, existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and transportation. Offerors must enter detailed labor costs and material costs by division, with the template automatically calculating total costs per division and generating subtotals for all divisions combined.
The template further requires offerors to apply overhead percentage, profit percentage, and bond percentage calculations to the division subtotals to arrive at a final total base offer cost. The instructions emphasize that offerors must provide granular price breakdowns to avoid lump sum pricing and that this detailed breakdown will be used by the Government for price analysis. The template includes fields for project identification information such as project number, project title, project location, offeror name and address, and the date the offer was prepared or submitted. All monetary values currently display as zero, indicating this is a blank template awaiting completion by contractors responding to the solicitation for BB Repair Steam Piping in Manhole Near Building 1 at Bay Pines VAMC in St. Petersburg, Florida.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wall overhead and details.pdf | ||
| Utility map.jpg | JPG image | |
| 36C24827Q0004 0002.pdf | ||
| site visit Q0004.pdf | ||
| 36C24827Q0004 0001.pdf | ||
| 516-26-117 Specifications 00 01 10.pdf | ||
| EMR 1 page.docx | DOCX document | |
| WD-FL20260222 DATED 5-18-26.pdf | ||
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf | ||
| PPQ -Request form.docx | DOCX document | |
| PPQ.pdf | ||
| 36C24827Q0004_1.pdf | ||
| ASBUILTS-516-26-117.pdf | ||
| 05_Drawings SECTION LP302- 516-26-117.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .