Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DZ--FY27 NRM (PROJ 516-26-117) BB Repair Steam Piping in Manhole Near Building 1
Solicitation number
36C24827Q0004-1
Issued by

About this file

This is a pricing template for submitting a base offer cost breakdown for federal construction contracts. The spreadsheet organizes labor and material costs across 34 divisions of work using the standard CSI (Construction Specifications Institute) format, including general requirements, existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and transportation. Offerors must enter detailed labor costs and material costs by division, with the template automatically calculating total costs per division and generating subtotals for all divisions combined.

The template further requires offerors to apply overhead percentage, profit percentage, and bond percentage calculations to the division subtotals to arrive at a final total base offer cost. The instructions emphasize that offerors must provide granular price breakdowns to avoid lump sum pricing and that this detailed breakdown will be used by the Government for price analysis. The template includes fields for project identification information such as project number, project title, project location, offeror name and address, and the date the offer was prepared or submitted. All monetary values currently display as zero, indicating this is a blank template awaiting completion by contractors responding to the solicitation for BB Repair Steam Piping in Manhole Near Building 1 at Bay Pines VAMC in St. Petersburg, Florida.

View the file

Other files

File Type Posted
Wall overhead and details.pdf PDF
Utility map.jpg JPG image
36C24827Q0004 0002.pdf PDF
site visit Q0004.pdf PDF
36C24827Q0004 0001.pdf PDF
516-26-117 Specifications 00 01 10.pdf PDF
EMR 1 page.docx DOCX document
WD-FL20260222 DATED 5-18-26.pdf PDF
SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf PDF
PPQ -Request form.docx DOCX document
PPQ.pdf PDF
36C24827Q0004_1.pdf PDF
ASBUILTS-516-26-117.pdf PDF
05_Drawings SECTION LP302- 516-26-117.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .