WCC 260-B5260-075 (M25WC153) Addendum No. 2 2026-10-30.pdf

PDF 2 MB Posted

Attached to
Replace Grayson Hall Elevator and Loading Dock at Wytheville Community College, Project Code# 260-B5260-075 (M25WC153)
Solicitation number
DBB-129825
Issued by
Wise County, Virginia

About this file

This is Addendum No. 2 to the bidding documents for the Wytheville Community College Grayson Hall Elevator and Loading Dock Project (Code 260-B5260-075/M25WC153), issued by Thompson & Litton, Inc. on October 30, 2026. The addendum modifies the original bidding documents dated September 3, 2026, and addresses clarifications regarding landscaping removal outside the Mechanical Equipment Room, where the existing vegetation may be entirely removed for installation of a new condensing unit, with mulch matching existing conditions installed in lieu of new vegetation. The addendum includes responses to six pre-bid questions submitted by contractors, including clarifications on ductless mini-split system requirements, elevator specifications, fire suppression system servicing, loading dock leveler specifications, preferred manufacturers, and construction scheduling flexibility. Bidders must acknowledge receipt of this addendum on the Bid Form; failure to do so may result in disqualification. Sealed bids are due November 12, 2026, at 2:00 p.m., with public bid opening on November 13, 2026, at 2:00 p.m. in Richmond, Virginia.

The addendum includes a complete replacement of Specification Section 11 1319 for Stationary Loading Dock Equipment, which specifies hinged-edge dock levelers with integral ramps, mechanical activation, 30,000-pound capacity, 78-inch width, 7-foot minimum integral ramp length, and hot-dip galvanized finish in compliance with ANSI MH30.1. The revised mechanical notes and schedule on Sheet M001 delete Note 6 from the Ductless Mini Split Schedule, which previously required suction line accumulators, filter driers, and sight glasses—devices that the Mitsubishi manufacturer prohibits to maintain equipment warranty. The project includes one Edge of Dock leveler unit with integral ramp and two molded rubber dock bumpers; no formal set-asides are indicated in this addendum. Training requirements include a minimum of one hour provided by manufacturer personnel, and the contractor must provide one year of maintenance service from the Date of Substantial Completion. A five-year warranty on the air conditioning compressor unit and one-year service and guarantee on all new controls and equipment are required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERS ARCHITECTS SURVEYORS

T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com

ADDENDUM NO. 002

TO: All Plan Holders

RE: Wytheville Community College (WCC)

WCC Grayson Hall Elevator and Loading Dock

Project Code: 260-B5260-075 M25WC153

T&L Project No. 19736

DATE: October 30, 2026

BIDS RECEIVED DATE: November 12, 2026, 2:00 PM

BIDS OPEN DATE: November 13, 2026, 2:00 PM

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated

September 3, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form.

Failure to do so may subject Bidder to disqualification.

This Addendum consists of 15 pages.

CLARIFICATIONS:

1. Clarification to confirm with Wytheville Community College about the removal of the existing landscaping located outside of the Mechanical Equipment Room for the installation of the new condensing unit. Wytheville

Community College stated the entirety of the landscaping could be removed during the Pre-Bid Conference.

Verify with Wytheville Community College prior to any landscape removal during construction. Mulch to match existing may be installed in lieu of new vegetation.

ANSWERS TO PRE-BID QUESTIONS:

1. Responses to Pre-Bid Questions 1-6 are attached.

CHANGES TO PROJECT MANUAL:

1. Specification Section 11 1319 – Stationary Loading Dock Equipment:

a. REPLACE Specification Section 11 1319 in its entirety.

CHANGES TO DRAWINGS:

1. Sheet M001: Mechanical Notes, Schedules, Specifications & Legend

a. DELETED Note 6 from Ductless Mini Split Schedule.

b. REPLACE Sheet M001 in its entirety.

10/30/2026

Addendum No. 002

WCC Grayson Hall Elevator and Loading Dock

Project Code: 260-B5260-075 M25WC153

T&L Project No. 19736

October 30, 2026

T&L www.T-L.com

Enclosures: Responses to Pre-Bid Questions:

Pre-Bid Question Form 1, 1 page

Pre-Bid Question Form 2, 1 page

Pre-Bid Question Form 3, 1 page

Pre-Bid Question Form 4, 1 page

Pre-Bid Question Form 5, 1 page

Pre-Bid Question Form 6, 1 page

Specification Section 11 1319 – Stationary Loading Dock Equipment, 6 pages

Sheet M001, 1 page

All other general terms, conditions, and specifications shall remain the same.

END OF ADDENDUM #002

DGS-30-272

(Rev. 04/15)

PREBID QUESTION FORM

(Use separate Form for each question submitted.)

Date:

Project Title: WCC Grayson Hall Elevator and Loading Dock

Project Code No.: 260-B5260-075/M25WC153

The following question concerns Drawing Sheet (number) :

The following question concerns Specifications Section (number) , page _________, paragraph _______:

All responses to questions will be made by Addendum.

Question submitted by:

Name Organization

Bidders shall submit form to: Thompson & Litton, Inc.

Name Organization

Email address: prebid@T-L.com or

FAX No.: (276) 328-1738

10/22/2026

M001 Ductless Mini Split Schedule Note 6note 6.reads- provide a suction line accumulator, filter drier and sight glass

Inverter modulation – inverter compressors vary speed constantly – adding extra restriction like an accumulator or unapproved drier messes with oil return and refrigerant flow dynamics

Metering placement – EEV ( electric Expansion valve) is located in the indoor unit meaning neither line acts as a standard stationary suction line in all operating modes

Built in protection – Mitsubishi inverter mini- splits come factory engineered with internal strainers , EEVs and precise oil return management built directly into the outdoor unit Mitsubishi prohibits accumulators and filter driers to maintain warranty

Sight glasses are not required and are NOT recommended by Mitsubishi as mini splits are designed as critical charge systems with proper refrigerant amount strictly determined by weighing charge in ounces- not by viewing bubbles in sight glass, with fluctuating pressures and mass flow rates , sight glasses are an unreliable tool for judging refrigerant levels.

Based on manufacture basis of design on equipment selection - Mitsubishi (other manufactures are similar) and their stand on these requested additional devices that create a problem with warranty – Is note 6 still a requirement even if it affects equipment warranty?

If so who is responsible should there be a warranty issue ?

Or can note 6 be disregarded ? please clarify

Josh Hagy Snyder and Associates

Note 6 should be deleted; sight glass, etc are not required.

Steven Thomas 10/23/2026

F&S BUILDING INNOVATIONS

Commercial Estimating · John Williams · jwilliams@fsbuildinginc.com

WCC Grayson Hall Elevator and Loading Dock · VCCS Project Code 260-B5260-075/M25WC153

DGS-30-272

(Rev. 04/15)

PREBID QUESTION FORM

(Use separate Form for each question submitted.)

Date: October 23, 2026 Project Title: WCC Grayson Hall Elevator and Loading Dock Project Code No.: 260-B5260-075/M25WC153 Question No.: F&S Building Innovations The following question concerns Drawing Sheet (number):

AD101 (Demolition Note 1); A401 (Elevator Section)

The following question concerns Specifications Section (number), page, paragraph:

14 2400 §2.2.A.1.a

Question:

Section 14 2400 §2.2.A.1.a requires a hydraulic elevator 'with cylinder in buried casing below elevator pit,' and AD101 Demolition Note 1 requires removal of the existing elevator in its entirety, including the piston. Will the A/E accept a twin-post above-ground (holeless) hydraulic jack arrangement in lieu of the in-ground cylinder? If so, may the existing in-ground cylinder be abandoned in place rather than removed, and what abandonment method is required?

All responses to questions will be made by Addendum.

Question submitted by: Bidders shall submit form to:

Name: John Williams Name: Thompson & Litton, Inc.

Organization: F&S Building Innovations Email: prebid@T-L.com Email: jwilliams@fsbuildinginc.com FAX No.: (276) 328-1738

RESPONSE:

This is asking T&L to redesign for a twin-post elevator. We are replacing in kind, and the drawings and specifications have been approved by DEB. Contractor shall bid what is shown on the bid documents.

PREBID QUESTION FORM

(Use separate Form for each question submitted.)

Date:

Project Title: WCC Grayson Hall Elevator and Loading Dock

Project Code No.: 260-B5260-075/M25WC153

The following question concerns Drawing Sheet (number) :

The following question concerns Specifications Section (number) , page _________, paragraph _______:

All responses to questions will be made by Addendum.

Question submitted by:

Name Organization

Bidders shall submit form to: Thompson & Litton, Inc.

Name Organization

Email address: prebid@T-L.com or

FAX No.: (276) 328-1738

10/26/2026

21 1300 Who currently services the fire suppression system?

Laura Clark Clark Brothers Company

RESPONSE:

VSC Fire & Security, Inc.

PREBID QUESTION FORM

(Use separate Form for each question submitted.)

Date:

Project Title: WCC Grayson Hall Elevator and Loading Dock

Project Code No.: 260-B5260-075/M25WC153

The following question concerns Drawing Sheet (number) :

The following question concerns Specifications Section (number) , page _________, paragraph _______:

All responses to questions will be made by Addendum.

Question submitted by:

Name Organization

Bidders shall submit form to: Thompson & Litton, Inc.

Name Organization

Email address: prebid@T-L.com or

FAX No.: (276) 328-1738

10/26/2026

11 1319 Do we need to fabricate the ramp by provided specs, and what material would be preferred for the ramp?

Jody Martin Clark Brothers Company

RESPONSE:

The ramp shall be integral with the Edge of Dock Leveler and purchased as one unit. See revised specification section 11 1319.

PREBID QUESTION FORM

(Use separate Form for each question submitted.)

Date:

Project Title: WCC Grayson Hall Elevator and Loading Dock

Project Code No.: 260-B5260-075/M25WC153

The following question concerns Drawing Sheet (number) :

The following question concerns Specifications Section (number) , page _________, paragraph _______:

All responses to questions will be made by Addendum.

Question submitted by:

Name Organization

Bidders shall submit form to: Thompson & Litton, Inc.

Name Organization

Email address: prebid@T-L.com or

FAX No.: (276) 328-1738

10/26/2026

11 1319 Are there preferred end of dock leveler manufactures the design team/owner would like to use?

Laura Clark Clark Brothers Company

RESPONSE:

There is not a preferred edge of dock leveler. The basis of design is an edge of dock leveler by

Poweramp sold by Systems Loading Dock Equipment. Other manufacturers with integral ramps are

Bluff Manufacturing and Beacon Industries.

PREBID QUESTION FORM

(Use separate Form for each question submitted.)

Date:

Project Title: WCC Grayson Hall Elevator and Loading Dock

Project Code No.: 260-B5260-075/M25WC153

The following question concerns Drawing Sheet (number) :

The following question concerns Specifications Section (number) , page _________, paragraph _______:

All responses to questions will be made by Addendum.

Question submitted by:

Name Organization

Bidders shall submit form to: Thompson & Litton, Inc.

Name Organization

Email address: prebid@T-L.com or

FAX No.: (276) 328-1738

10/26/2026

14 2400 During the pre-bid meeting, it was brought up that the elevator lead times are shorter than expected. Assuming that all elevator components can be on-site prior to the summer break, may work on the project begin earlier than the summer?

Laura Clark Clark Brothers Company

RESPONSE:

Construction schedule to be coordinated with Owner after bid award. The Spring semester ends around the end of April - early May. All items in the contract documents regarding construction occurring while the building is occupied shall be followed regardless of when construction begins.

WCC Grayson Hall Elevator and Loading Dock

Project Code: 260-B5260-075/M25WC153

Stationary Loading Dock Equipment

19736 11 1319/1 of 5

SECTION 11 1319 - STATIONARY LOADING DOCK EQUIPMENT

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Edge of dock (EOD) levelers with integral ramp.

1.2 REFERENCE STANDARDS

A. ANSI MH30.1 - Design, Testing, and Utilization of Dock Leveling Devices; 2022.

B. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products; 2024.

C. ASTM A786/A786M - Standard Specification for Hot-Rolled Carbon, Low-Alloy, High-Strength Low-Alloy, and Alloy Steel Floor Plates; 2015 (Reapproved 2025).

D. ASTM D2240 - Standard Test Method for Rubber Property--Durometer Hardness; 2015 (Reapproved 2021).

E. AWS B2.1/B2.1M - Specification for Welding Procedure and Performance Qualification; 2026.

F. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2025, with Amendment (2026).

1.3 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide materials and finish, installation details, roughing-in measurements, operation of unit and integral, stationary ramp.

C. Shop Drawings: Indicate required opening dimensions and tolerances, perimeter conditions of construction, and anchor installation.

D. Manufacturer's Installation Instructions: Indicate special requirements.

E. Welders' Qualification Statement: Welders' certificates in accordance with AWS B2.1/B2.1M and dated within the previous 12 months.

F. Operation Data: Provide operating instructions, and identify unit limitations.

G. Maintenance Data: Provide unit maintenance information, lubrication cycles, and spare parts manual.

H. Warranty: Provide warranty information and certification.

1.4 QUALITY ASSURANCE

A. Welder Qualifications: Welding processes and welding operators qualified within previous 12 months in accordance with AWS D1.1/D1.1M.

Project Code: 260-B5260-075/M25WC153

Stationary Loading Dock Equipment

19736 11 1319/2 of 5

1.5 FIELD CONDITIONS

A. Existing Conditions: Field verify dimensions of construction related to stationary loading dock equipment prior to fabrication, including slope of inclined dock approach and dock height.

1.6 WARRANTY

A. See Section 01 7800 - Closeout Submittals, for additional warranty requirements.

B. Manufacturer agrees to correct defective work within five year period from Date of Substantial Completion.

PART 2 PRODUCTS

2.1 EDGE OF DOCKS (EOD) LEVELERS

A. Edge of Dock (EOD) Levelers: Hinged-edge type, in compliance with ANSI MH30.1, and located at exterior edge and securely mounted to face of loading dock.

1. Actuating Method:

a. Mechanical: Activated by operator pulling edge and deck to raised and extended position, and edge is then lowered onto trailer bed.

1) Manually controlled, with counterbalance and spring operation; spring-operated raising and lowering of ramp.

2) Lever Handle: Use self-storing lever handle to raise unloaded ramp and extend edge or to lower ramp and edge.

2. Rated Capacity: Capable of supporting 30,000 lbs without permanent deflection or distortion.

3. Width of Platform Ramp: 78 inch wide.

4. Width of Integral, Stationary Ramp: 78 inch wide.

5. Length of Integral, Stationary Ramp: 7'-0" minimum (12 inches per 1 inch rise).

6. Height of Integral, Stationary Ramp: 7 inches.

7. Hinged Edge Thickness: At least 1/2 inch thick, nonskid steel plate.

a. Hinge: Provide full width, steel piano hinge with heavy-wall hinge tube and grease fittings with support gussets on edge and ramp.

8. Edge Extension Length: 17 inches long.

9. EOD leveler to compensate for differences in height between truck bed and loading dock platform, with operating range above platform level to enable edge to extend and clear truck bed prior to contact within following working range:

Project Code: 260-B5260-075/M25WC153

Stationary Loading Dock Equipment

19736 11 1319/3 of 5

a. Vertical Travel: Provide for not less than 5 inches above and 5 inches below adjoining platform.

10. Automatic Vertical Compensation: Floating travel of leveler ramp with edge extended to automatically compensate for upward and downward movement of truck bed during loading and unloading operations.

11. Edge Operation: Manufacturer's standard mechanism that automatically extends and supports hinged edge on ramp edge and rests on truck bed over leveler's working range, allows edge to yield under incoming truck impact and automatically retracts edge when truck departs.

12. Automatic Ramp Return: Automatic return of unloaded ramp as truck departs, from raised or lowered position to stored position, level with platform, and EOD leveler is also capable of retracting to stored position while truck is still at loading dock.

B. Construction: Fabricate EOD leveler frame, hinged edge and platform supports from structural and formed steel shapes, with platform and hinged edge welded to supports, chamfer edge to minimize obstructing material-handling vehicles, and ensure entire assembly is fabricated to withstand deformation during operation and storage phases of service.

1. Ramp Traffic Support: Provide support for EOD ramp at platform level in stored position with ramp edge retracted, and means to release supports allowing ramp to descend below platform level.

2. Ramp Maintenance Support: Provide mechanism in framework to support EOD ramp in up position during dock leveler maintenance.

C. Integral Molded Rubber Dock Bumpers: Fabricate from 4-1/2 inch thick, heavy-duty molded rubber reinforced compound; with Type A Shore durometer hardness of 80, plus or minus 5, when tested in accordance with ASTM D2240.

1. Provide two dock bumpers for each EOD leveler, anchored to face of loading dock with expansion bolts.

2. Profile: Manufacturer's standard.

D. EOD Leveler Finish: Hot-dip galvanize to minimum requirements of ASTM A123/A123M.

2.2 MATERIALS

A. Checkered Steel Plate: ASTM A786/A786M, rolled steel floor plate; manufacturer's standard pattern.

2.3 FINISHES

A. Galvanizing: Hot-dip galvanize to minimum requirements of ASTM A123/A123M.

1. Touch up abraded areas after fabrication using specified touch-up primer for galvanized surfaces.

Project Code: 260-B5260-075/M25WC153

Stationary Loading Dock Equipment

19736 11 1319/4 of 5

B. Metal Plate Platform: Hot-dip galvanized to 1.25 oz/sq ft finish.

C. Frame: Hot dip galvanized to 1.25 oz/sq ft finish.

D. Integral Stationary Ramp: Hot dip galvanized to 1.25 oz/sq ft finish.

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine loading dock equipment area for compliance with requirements for installation tolerances and other conditions related to this work.

B. Proceed with installation after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Prepare loading dock equipment for size and locations as indicated, and provide anchoring devices with templates, diagrams, and installation instructions.

3.3 INSTALLATION

A. Install EOD levelers with integral ramp to ensure arrangement is adequate to accommodate lift in proper relation to loading platform.

1. Anchor edge-of-dock leveler securely in place, in accordance with manufacturer’s written instructions.

2. Weld or bolt bumper blocks to face of loading dock.

3. Bush hammer a trench in existing concrete loading dock slab as recommended by edge of dock manufacturer for anchorage of edge integral stationary ramp plate.

3.4 ADJUSTING

A. Adjust installed loading dock equipment for smooth and balanced operation, and lubricate as recommended by manufacturer.

B. Test dock levelers for vertical travel within operating range as indicated, and adjust as necessary for proper operation.

C. After installation, inspect exposed factory finished loading dock equipment, and repair damaged finishes.

3.5 CLOSEOUT ACTIVITIES

A. See Section 01 7800 - Closeout Submittals, for closeout submittals.

B. Demonstrate proper operation of loading dock equipment to Owner's designated representative.

1. Use operation and maintenance data as reference during demonstration.

Project Code: 260-B5260-075/M25WC153

Stationary Loading Dock Equipment

19736 11 1319/5 of 5

2. Briefly describe function, operation, and maintenance of each component.

C. Training: Train Owner's personnel on operation and maintenance of system.

1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.

2. Provide minimum of one hour of training.

3. Instructor: Manufacturer's training personnel.

3.6 MAINTENANCE

A. See Section 01 7000 - Execution and Closeout Requirements, for additional requirements relating to maintenance service.

B. Provide service and maintenance of operating equipment for a period of one year from Date of Substantial Completion.

1. Includes monthly preventive maintenance, repair or replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper operation of loading dock equipment at rated speed and capacity.

2. Provide manufacturer's authorized replacement parts and supplies.

END OF SECTION

This page intentionally left blank

M

DG

M

= SMOKE/FIRE DAMPER

DAMPERS IN HORIZONTAL DUCT

DAMPERS IN VERTICAL DUCT

= SMOKE DAMPER

SIDEWALL GRILLE

SLOT TYPE GRILLE

RETURN, TRANSFER GRILLE

SUPPLY DIFFUSER

EXHAUST GRILLE

GRILLE IDENTIFICATION

AND CFM RATING

LOUVER WITH

POINT OF DEMOLITION

CO2/VOC/DCC SENSOR

POINT OF CONNECTION

NEW TO EXISTING

3/4" DOOR UNDERCUT

or MANUAL BALANCING DAMPER

SQUARE TO ROUND TRANSITION

FLEX DUCT (5' MAX. RUNOUT)

MOTORIZED DAMPER

BIRD SCREEN

HUMIDISTAT

THERMOSTAT

TAKE-OFF WITH SPIN-IN

FITTING

VERTICAL RISE

IN RETURN/EXHAUST DUCT

FULL RADIUS ELBOW

VERTICAL RISE

IN SUPPLY DUCT

SPIN-IN TAKE-OFF IN

BOTTOM OF DUCT

TURNING VANES

SQUARE TURN WITH

DOUBLE THICKNESS

DOOR GRILLE

H.V.A.C. LEGEND AND SYMBOLS

SUPPLY, EXHAUST,

RETURN DUCT

BRANCH TAKE-OFF

= FIRE DAMPER

SMOKE DETECTOR

12x8

12x8

12x8 x8

12x8

~ 6"∅

12x8

8x8

12x8

OR

OR

OR

OR

OR

OR

OR

OR

OR

OR

OR

VERTICAL DROP

IN SUPPLY DUCT

~ ~OR

OR ~ ~

VERTICAL DROP

IN RETURN/EXHAUST DUCT

UC

T

H

CO2

SD

1. GENERAL

A. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL ALL AIR CONDITIONING, HEATING AND VENTILATING WORK INDICATED ON THE DRAWINGS, SPECIFIED HEREIN, AND

IN ACCORDANCE WITH ALL CITY, STATE, AND NATIONAL CODES.

B. THE BUILDING PERMIT SHALL BE OBTAINED AND PAID FOR BY THE OWNER. ALL OTHER PERMITS, LOCAL LICENSE FEES, BUSINESS FEES, TAXES OR SIMILAR ASSESSMENTS IMPOSED BY THE APPROPRIATE POLITICAL

SUBDIVISION AND THE DEPARTMENT OF ENVIRONMENTAL QUALITY SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR.

C. THE MECHANICAL DRAWINGS ARE GENERALLY DIAGRAMMATIC. DO NOT SCALE THE DRAWINGS FOR EXACT SIZE OR LOCATIONS.

D. PRODUCTS SHALL BE NEW AND FIRST LINE QUALITY, OF GRADE AND TYPE SHOWN ON PLANS AND SPECIFIED, OR EQUALS AS APPROVED BY THE DESIGNER IN WRITING. ALL PRODUCTS SHALL BE IN CURRENT

PRODUCTION WITH NO NOTICE OF BEING DISCONTINUED OR DRASTICALLY CHANGED FROM CURRENT PRODUCTION.

E. MECHANICAL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED IN A NEAT WORKMANLIKE MANNER. UNSIGHTLY INSTALLATIONS SHALL BE REMOVED OR REWORKED AT NO EXPENSE TO THE OWNER.

F. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID AND PRIOR TO CONSTRUCTION.

G. REFER TO ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL COORDINATION WITH THESE DRAWINGS.

H. COORDINATE ALL PENETRATIONS OF FLOOR SLABS, ROOF AND WALLS WITH STRUCTURAL DRAWINGS.

I. SEAL ALL WALL, ROOF AND FLOOR PENETRATIONS BY MECHANICAL AND ELECTRICAL SERVICE AIRTIGHT.

J. PROVIDE FIRE STOPPING OF ALL PIPE, FITTINGS, CONDUIT, DUCTWORK THRU RATED PARTITIONS. ALL PIPE AND CONDUIT SHALL BE SLEEVED AND CAULKED USING “HILTI” FIRE STOP SYSTEMS.

K. EXISTING CONDITIONS SHOWN HEREIN WERE TAKEN FROM SITE OBSERVATIONS, ORIGINAL DESIGN DRAWINGS AND AS-BUILT DOCUMENTATION WHERE AVAILABLE; ANY DISCREPANCIES BETWEEN THE PLANS AND

ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE ARCHITECT / ENGINEER.

L. HVAC CONTRACTOR SHALL REPLACE THE EQUIPMENT FILTERS AT THE TIME OF POSSESSION OF THE PROJECT BY THE OWNER, USING ONLY NEW FILTERS OF THE PROPER SIZE AND TYPE.

M. HVAC CONTRACTOR SHALL REPAIR, REPLACE, OR REPAINT TO MATCH EXISTING SURFACES DAMAGED DURING INSTALLATION OF THE MECHANICAL SYSTEM.

N. EQUIPMENT AND MATERIALS SUBMITTED AS ALTERNATES TO THE SPECIFIED DATA MUST BE CLEARLY MARKED AS TO THE DIFFERENCES IN SUBMITTED VERSUS SPECIFIED. FAILURE TO CLEARLY MARK THE SUBMITTALS

AS SUCH IS GROUNDS FOR REJECTION. SUBMITTALS NOT CLEARLY MARKED AS BEING ALTERNATE TO THE SPECIFIED DATA CAN BE ASSUMED TO MEET ALL SPECIFIED REQUIREMENTS AND THE PROVIDER IS

RESPONSIBLE TO PROVIDE AS SUCH.

2. EQUIPMENT

A. THE MECHANICAL SYSTEM(S) SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

B. ALL EQUIPMENT SHALL BE U.L. LISTED.

C. CONTRACTOR SHALL VERIFY ELECTRICAL VOLTAGE, LOADS ETC. WITH ELECTRICAL TRADE, OR EXISTING CONDITIONS, PRIOR TO ORDERING EQUIPMENT.

D. EQUIPMENT SELECTIONS SHOWN ON THE DRAWINGS ARE THE BASIS OF DESIGN. ACTUAL INSTALLED EQUIPMENT AND DIFFERENT MANUFACTURERS MAY DIFFER FROM THAT SHOWN. EQUIPMENT TYPE, PHYSICAL

SIZE, CLEARANCES, WEIGHT, CAPACITIES AND PERFORMANCE CHARACTERISTICS SHALL BE GOVERNING FACTORS IN SUBMITTING SUBSTITUTIONS FOR REVIEW AND APPROVAL. COORDINATE EQUIPMENT ELECTRICAL

REQUIREMENTS WITH THE ELECTRICAL DRAWINGS.

E. EQUIPMENT SHALL OPERATE QUIETLY. THE OPERATION OF THE EQUIPMENT SHALL CAUSE NO PERCEPTIVE VIBRATION OR OBJECTIONABLE NOISE IN ANY PORTION OF THE BUILDING OR STRUCTURE.

F. DO NOT BLOCK FILTER REMOVAL ON EQUIPMENT WITH PIPING, DUCTWORK, ETC. DEMONSTRATE FILTER REMOVAL TO OWNER'S REPRESENTATIVE FOR EACH UNIT AS PART OF TRAINING.

G. PROVIDE STARTERS, INTERNAL PROTECTION, OR OTHER DEVICES INDICATED ON DRAWINGS. COORDINATE VOLTAGE, PHASE, AMPERAGE, AND OTHER REQUIREMENTS WITH ELECTRICAL DRAWINGS. UNLESS OTHERWISE

NOTED, SERVICE DISCONNECTS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR.

H. PROVIDE LOW AMBIENT CONTROL TO 0 DEGREE FAHRENHEIT FOR ALL REFRIGERANT EQUIPMENT.

I. PROVIDE SUCTION LINE ACCUMULATOR FOR REFRIGERANT LINES OVER 70 EQUIVALENT LINEAL FEET (MAX LENGTH 120 FEET). VERIFY WITH MANUFACTURER.

J. FURNISH A FIVE-YEAR WARRANTY ON AIR CONDITIONING COMPRESSOR UNIT AND PROVIDE A ONE-YEAR SERVICE AND GUARANTEE ON ALL NEW CONTROLS AND EQUIPMENT. CONTRACTOR SHALL REPLACE ANY

DEFECT IN MATERIAL OR WORKMASHIP FOR (1) ONE YEAR FROM DATE OF ACCEPTANCE. DATE OF ACCEPTANCE IS DATE CERTIFIED BY ARCHITECT / ENGINEER THAT CONTRACT HAS BEEN SATISFACTORILY COMPLETED

IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

MECHANICAL NOTES & SPECIFICATIONS

3. AIR DISTRIBUTION

A. EVERY EFFORT HAS BEEN MADE TO ALLOW A FREE PATH OF RETURN AIRFLOW TO THE PROPER HVAC UNIT FOR THE CEILING RETURN PLENUM SYSTEM. IF UNEXPECTED FIELD CONDITIONS ARE FOUND TO PROHIBIT

THE AIR RETURN PATH THE CONTRACTOR SHALL REPORT THE ISSUE TO THE ARCHITECT / ENGINEER.

4. PIPING

A. ALL CONDENSATE DRAIN LINES SHALL BE SCHEDULE 40 DWV-PVC PIPE AND FULL SIZE, OR LARGER, OF EQUIPMENT DRAIN. TRAP AND VENT AT EQUIPMENT. ROUTE TO THE NEAREST FLOOR DRAIN OR AS DIRECTED

ON THE DRAWINGS. MAINTAIN A MIN. 2" AIR GAP FROM DRAIN DISCHARGE TO DRAIN TOP.

B. REFRIGERANT PIPE INSULATION SHALL BE FLEXIBLE, CLOSED CELL ELASTOMERIC PIPE INSULATION. INSULATION MATERIAL SHALL BE CLOSED CELL STRUCTURE TO PREVENT MOISTURE FROM WIKING AND SHALL

HAVE A FLAME SPREAD INDEX OF LESS THAN 25 AND A SMOKE DEVELOPED INDEX OF LESS THAN 50 AS TESTED PER ASTM E 84. INSULATION THICKNESS TO BE ¾”.

C. PROVIDE CHROME-PLATED ESCUTCHEONS AT ALL EXPOSED PIPE PENETRATIONS THROUGH WALLS.

5. CONTROLS

A. PROVIDE 7-DAY PROGRAMMABLE THERMOSTAT; LOCATE AS SHOWN ON PLANS. THERMOSTATS SHALL BE WALL MOUNTED AT 5'-6" AFF. INSTALL AT 4'-0" AFF WHERE REQUIRED AND/OR AS DIRECTED TO MEET

HANDICAP ACCESSIBILITY.

Sheet No.

Designed

Drawn

Checked

Date

Project No.

D a te /T im e

Fi le N a m e

Seal

STATE BUILDING OFFICIAL APPROVAL STAMP

/2

/2

:0

:1

A M

C

U se rs \s te v e n th o m a s\

D o cu m e n ts \1

-G ra y so n e le v a to r_ M st h o m a s@ t-l.

co m .r v t

M001

19736

SGT

SGT

LRF

09/03/2026

IS

S

U E

D F

O R

B

ID

S W

C C

G R

A

YS

O N

H A

LL

E

LE

V

A

TO

R A

N D

LO

A

D

IN

G D

O C

K W

YT

H

EV

IL

LE

, V

IR

G

IN

IA

M

EC

H A

N

IC

A L

N O

TE

S, S C

H

ED

U

LE

S, SP

EC

IF

IC

A

TI

O N

S

L

EG

EN

D

PROJECT CODE: 260-B5260-075/M25WC153

DUCTLESS MINI SPLIT SCHEDULE

IU-1/OU-1

MARK COOLING CAPACITY

BTU/HR

12,000

MANUFACTURER &

MODEL NUMBER

HEATING CAPACITY

BTU/HR

18,000

INDOOR UNIT

VOLTAGE/PH

INDOOR UNIT

MOTOR WATTS

OUTDOOR UNIT OUTDOOR UNIT

MCA MOCPVOLTAGE/PH

SEER2 HSPF2

MITSUBISHI PKA-AL12NL/PUZ-AK12NL 21.10 10.1208/1 30 16 27208/1

1. REFRIGERANT SHALL BE R-454B.

2. FACTORY SYSTEM CHARGE SHALL BE 4 LB 6 OZ

3. INDOOR UNIT IS POWERED BY OUTDOOR UNIT. PROVIDE LOCAL DISCONNECT OPTION FOR INDOOR UNIT.

4. PROVIDE DISCONNECT FOR OUTDOOR UNIT PER MANUFACTURERS NAMEPLATE REQUIREMENTS

5. UNIT SHALL HAVE LOW AMBIENT COOLING

6. NOT USED

7. UNIT SHALL HAVE A WASHABLE MERV 8 FILTER

8. THE DESIGN SHOWN IS BASED ON MITSUBISHI PKA-AL12NL/PUZ-AK12NL EQUIPMENT AND IS INTENDED TO ONLY SHOW

THE GENERAL SIZE, CONFIGURATION, LOCATION, CONNECTIONS, AND SUPPORT FOR EQUIPMENT OR SYSTEMS SPECIFIED

WITH RELATION TO THE OTHER BUILDING SYSTEMS. SEE SPECIFICATION SECTION 238150 FOR TECHNICAL REQUIREMENTS

PERTAINING TO THE EQUIPMENT.

9. UNIT TEMPERATURE SETPOINTS: COOLING: 75 DEGREES F, HEATING: 70 DEGREES F; DEADBAND SHALL BE 5 DEGREES F.

ASHRAE 15 CALCULATIONS

FACTORY SYSTEM CHARGE: 4 LB 6 OZ

FIELD CHARGE:

1/4": 75 FEET * 0.6 OZ/FT = 45 OZ

1/2": 75 FEET * 0.7 OZ/FT = 52.5 OZ

FILTER DRIER = 6 OZ

TOTAL FIELD CHARGE: 103.5 OZ = 6 LB 8 OZ

TOTAL SYSTEM CHARGE - 10 LB 14 OZ

FOR NO AIR CIRCULATION:

EDVC = Mdef * Flfl * FOCC

Mdef = 4.3 FROM TABLE 7-1

FLF = 0.96

FOCC = 1

EDVC = 4.125

AIR DISTRIBUSTION SCHEDULE

MARK SIZE

(IN. X IN.)

DIFFUSER

SIZE

(IN. X IN.)

NECK

MATERIAL FINISH DESCRIPTION NOTESPERFORMANCE

STANDARD OF

DG NAILOR 61DGD-FR STEEL WHITE FIRE RATED DOOR GRILLE24X24 NA 1

1. MAX NC LEVEL SHALL BE 30

ASHRAE 15 PERMANENT OPENING SIZE CALCULATION

Avent = (Mrel - Mroom / LFL * 0.417) * ((A/g * Mroom) * (Mr/Mr - Ma))^0.5

Mrel = 10.875 lbs

Mroom = 4.125 lb

LFL = 18.5 LB/1000 FT^3

A = 48 FT^2

Mr = 62.6

Ma = 29

Avent = (10.875 - 4.125 LB) / (18.5 LB/1000 FT^3 * 0.417) * ((48 FT^2/(32.2 FT/S^2 * 4.125 LB) * (62.6 / (62.6 - 29))^0.5

Avent = 0.875 * 0.82

Avent = 0.72 FT^2 = 103.68 SQUARE INCHES

N o

D at e

R e vi si o n s

/2

/2

A

D D

E N

D U

M

09/03/2026

File details come from the government source that posted it. Updated .